Work Preference
Summary
Overview
Work History
Education
Skills
Core Skills
Accomplishments
Software
Languages
Timeline
AdministrativeAssistant
VISHAL KUMAR

VISHAL KUMAR

ENGINEER- CONSTRUCTION & COMMISSIONING Water & Wastewater Treatment | Industrial Utility Systems|
Noida

Work Preference

Work Type

Full Time

Location Preference

On-SiteRemote

Important To Me

Career advancementWork-life balanceCompany CultureFlexible work hoursTeam Building / Company Retreats

Summary

Dynamic Mechanical Engineer with over 7 years of proven expertise in project execution, installation, commissioning, and coordination of Water Treatment Plants (WTP), Sewage Treatment Plants (STP), and Effluent Treatment Plants (ETP) across diverse industrial and infrastructure projects. Currently serving as an Erection and Commissioning Engineer at Murugappa Water Technologies Pvt. Ltd., leading the installation and commissioning of semiconductor utility systems. Demonstrated proficiency in project planning, resource deployment, cost monitoring, and quality assurance compliance, complemented by strong leadership skills for effective management of cross-functional teams to ensure timely project delivery. Adept at collaborating with clients, consultants, vendors, and subcontractors to ensure seamless execution while maintaining a strong focus on safety standards and compliance requirements.

Overview

8
8
years of professional experience
2
2
Languages

Work History

Engineer (C&C) – On Role

Murugappa Water Technologies Pvt. Ltd.
10.2025 - Current
  • Optimized site operations by implementing effective scheduling and resource allocation strategies.
  • Reduced construction costs through diligent evaluation of materials and suppliers, ensuring best value without compromising quality.
  • Leading installation & commissioning of WTP, STP & ETP systems for Semiconductor Plant.
  • Managing execution planning, manpower deployment, scheduling, and reporting.
  • Coordinating with client, consultant & subcontractors for project milestones.
  • Monitoring QA/QC activities, testing & commissioning procedures.
  • Ensuring compliance with project specifications, safety & timelines.
  • Preparing daily, weekly & monthly progress reports.
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.

Site Engineer (Deputed Role)

Genius Consultants Pvt. Ltd.
08.2023 - 09.2025
  • Executed WTP/ETP/DAF systems for Larsen & Toubro projects.
  • Executed industrial water systems for JR Simplot.
  • BOQ preparation, cost estimation & procurement follow-ups.
  • Supervision of erection & commissioning activities.
  • QA/QC documentation and compliance monitoring.
  • Coordination between client, vendors & engineering teams.
  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.

Project Coordinator

Dhanush Engineering Solutions
12.2021 - 08.2023
  • Executed Jal Jeevan Mission activities, project tracking, and procurement coordination.

Project Engineer

Surya Water Technologies
01.2021 - 07.2021
  • Commissioning of MBBR-based ETPs, fabrication supervision, QA compliance.
  • Location: Srinagar & Delhi-NCR

Project Coordinator

Pilo Shudh Pani Seva Foundation
12.2019 - 01.2021
  • Managed installation of STPs for Indian Railways, logistics, and documentation.
  • Location: PAN India

Service Engineer

Pi-Lo Shudh Pani Seva Foundation
04.2018 - 12.2019
  • Managed installation, operation, and maintenance of Water ATMs (RO units with auto dispensing).
  • Location: PAN India

Education

B.Tech - Mechanical Engineering

AKTU
Lucknow
01-2018

Skills

Effective leadership and decision-making

Critical thinking abilities

Clear communication

Team-based project coordination

Task prioritization expertise

Flexible and detail-oriented

Time management

Quality control

Project planning

Technical reporting

Core Skills

Project Scheduling, Forecasting & Reporting, Cost Estimation & Budget Monitoring, Technical Documentation & BOQ Preparation, Vendor Management & Procurement Follow-ups, Installation & Commissioning of WTP/STP/ETP Plants, Site Supervision, QA/QC & Safety Compliance, Cross-Functional Team Management, Client Communication & Stakeholder Coordination, ETP/STP/WTP/RO - MBBR, MBR, DAF, PMTR Technologies, Engineering Drawing Review (AutoCAD - Basic), MS Office (Excel, Word, PowerPoint, Outlook), Project Progress Tracking & Documentation, Vendor Sourcing & Technical Inputs, Leadership & Decision Making, Time Management & Task Prioritization, Problem Solving & Analytical Thinking, Effective Communication & Team Collaboration, Adaptability & Detail Orientation

Accomplishments

  • Successfully led installation & commissioning of multiple WTP/STP/ETP systems for industrial and semiconductor projects, ensuring on-time delivery with zero major safety incidents.
  • Reduced project execution delays by 15–20% through proactive planning, vendor coordination, and real-time issue resolution at site.
  • Managed multi-disciplinary teams (civil, mechanical, electrical & instrumentation) ensuring seamless coordination and faster project execution.
  • Optimized material utilization and reduced rework, resulting in cost savings of ~10–12% in project execution.
  • Successfully handled client coordination and snag closure, achieving faster sign-offs and smooth project handover.
  • Led commissioning troubleshooting activities, improving plant performance stability within initial operating cycles.
  • Prepared and managed BOQs, procurement tracking & QA/QC documentation, ensuring compliance with project specifications and audit requirements.
  • Played a key role in execution of high-value projects for clients like Larsen & Toubro and JR Simplot, enhancing delivery credibility.
  • Delivered end-to-end project execution, from installation to trial run, testing, and final handover to client/O&M team

Software

GX WORKS

GT DESIGNER

AUTOCAD

Languages

English
Advanced (C1)
Hindi
Bilingual or Proficient (C2)

Timeline

Engineer (C&C) – On Role

Murugappa Water Technologies Pvt. Ltd.
10.2025 - Current

Site Engineer (Deputed Role)

Genius Consultants Pvt. Ltd.
08.2023 - 09.2025

Project Coordinator

Dhanush Engineering Solutions
12.2021 - 08.2023

Project Engineer

Surya Water Technologies
01.2021 - 07.2021

Project Coordinator

Pilo Shudh Pani Seva Foundation
12.2019 - 01.2021

Service Engineer

Pi-Lo Shudh Pani Seva Foundation
04.2018 - 12.2019

B.Tech - Mechanical Engineering

AKTU
VISHAL KUMARENGINEER- CONSTRUCTION & COMMISSIONING Water & Wastewater Treatment | Industrial Utility Systems|