Summary
Overview
Work History
Skills
Languages
Personal Qualifications
Disclaimer
Personal Information
Timeline
Generic
Vishal Singh

Vishal Singh

Bhopal

Summary

Looking for an entry into a world-class, highly professional organization with a challenging and competing environment, where I can use my knowledge base as well as personal attributes to achieve the organization’s goal. Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success.

Overview

11
11
years of professional experience

Work History

SITE MANAGER

SIMAR INFRASTRUCTURES LTD
09.2024 - Current
  • Coordinated site investigations, documented issues, and escalated to executive teams.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.


  • Assumed responsibility for personnel deployed to the work site.
  • Maintained records and logs of work performed and materials and equipment used.
  • Created weekly and monthly reports and presentations for the management team.
  • Oversaw all daily office operations and equipment maintenance.
  • Coordinated delivery of services and supplies to meet operational needs of power plant.
  • Monitored operations to spot and report on issues for quick resolution.

SITE MANAGER

KRANTI SERVICES AND ENGINEERING
08.2023 - 08.2024
  • Assumed responsibility for personnel deployed to work site.
  • Oversaw employee attendance record, handled payroll, and ordered new materials for sites.
  • Maintained records and logs of work performed and materials and equipment used.
  • Inspected cleanliness of common areas and offices.
  • Developed detailed plans based on broad guidance and direction.

OPERATION SHIFT INCHARGE

JAYANAND ENGINEERING
05.2022 - 08.2023
  • Inspection and repair of ESP, Economizer, and APH, DUCT, hoppers during running plant and shutdown and overhauling of the plant.
  • Responsible for the overall operation of the Ash handling plant of the power plant.
  • Involved in start-up &shutdown of equipment.
  • Try to ash-handling operation smoothly and reduce power consumption daily basis.
  • Proved successful working within tight deadlines and a fast-paced environment.

SHIFT INCHARGE

SIMAR INFRASTRUCTURES LTD
03.2021 - 04.2022
  • Examined and adjusted valves, pumps and other equipment to ensure proper functioning.
  • Followed safety protocols and procedures to maintain safe working environment.
  • Completed daily inspections and tests on plant equipment and documented findings.
  • Responded immediately to emergency situations and implemented proper procedures to minimize impacts.
  • Maintained power plant compliance with industry safety and environmental standards.
  • Performed routine preventative maintenance on power plant equipment.

SHIFT INCHARGE

MELCO INDIA PVT LTD
02.2019 - 03.2021
  • Inspected auxiliary equipment in ash handling plants to verify operation or determine maintenance or repair needs.
  • Maintained specification paperwork and manufacturer manuals for plant equipment to keep the team compliant, consistent, and productive.
  • Kept accurate logs on operations, repair, and maintenance work performed within the ash handling plant.
  • Resolved problems, improved operations, and provided exceptional service.

PROJECT ENGINEER

JIMMY ENTERPRISES
07.2017 - 01.2019
  • Proposed electrical product and system modifications to improve quality and efficiency.
  • Identified specific cables, fuses and circuit breakers required for assigned installations.
  • Inspected completed installations to observe operations and verify conformance to design and equipment specifications.
  • Administered both energized and de-energized testing on multi-design change packages.
  • Assisted in installation of electrical systems and components for commercial and industrial applications.
  • Coordinated with vendors to identify and procure appropriate equipment necessary for project completion.

DESK ENGINEER

VIRAT ENGINEERING
02.2014 - 12.2018
  • Performed problem analysis to identify support calls and problem areas.
  • Operation and maintenance of pneumatic conveying system.
  • Maintain a data off ash evacuation esp to the silo area.
  • Complied with company and OSHA safety rules and regulations.
  • Monitored machines during operation to detect sounds of malfunction or excessive vibration and adjust machines to eliminate problems.

Skills

  • Project Management
  • Blueprints and Schematics
  • Problem-Solving
  • Construction management
  • Site Inspection and Management
  • Budgeting and Cost Savings
  • Budget Development
  • OSHA safety requirements
  • Team Leadership
  • Inspection principles

Languages

Hindi & English

Personal Qualifications

  • High School, M.P. Board, 2007, 80%
  • Intermediate, M.P. Board, 2009, 65%
  • B.E., RGPV, 73%
  • 1 year diploma in industrial safety, 81.62%

Disclaimer

I, Vishal Singh declare that the above mentioned particulars are true to the best of my knowledge and belief.

Personal Information

  • Father's Name: Subhash Singh
  • Date of Birth: 12/08/1991
  • Gender: Male
  • Nationality: Indian

Timeline

SITE MANAGER

SIMAR INFRASTRUCTURES LTD
09.2024 - Current

SITE MANAGER

KRANTI SERVICES AND ENGINEERING
08.2023 - 08.2024

OPERATION SHIFT INCHARGE

JAYANAND ENGINEERING
05.2022 - 08.2023

SHIFT INCHARGE

SIMAR INFRASTRUCTURES LTD
03.2021 - 04.2022

SHIFT INCHARGE

MELCO INDIA PVT LTD
02.2019 - 03.2021

PROJECT ENGINEER

JIMMY ENTERPRISES
07.2017 - 01.2019

DESK ENGINEER

VIRAT ENGINEERING
02.2014 - 12.2018
Vishal Singh