I am a plant engineering professional with over 13 years of experience in project management and maintenance planning. I am an expert in Lean Manufacturing and Preventive Maintenance. My key achievements include implementing a predictive maintenance program that reduced unplanned machine breakdowns by 30% and leading initiatives that resulted in a 20% reduction in equipment downtime through Lean methodologies. I am seeking a Manager Plant Engineering position at your company, where I can leverage my project management and maintenance planning skills to support your mission of optimizing operational efficiency and reliability.
Overview
12
years of professional experience
Work History
Filtrum Fibretechnology Pvt Ltd
Manager Plant Engineering
08.2012 - Current
Job overview
Led a team of 35 maintenance professionals, streamlining processes and implementing Lean methodology, which resulted in a 20% reduction in machine downtime
Managed a plant-wide equipment upgrade project on schedule with a budget of Rs.1 Cr/Year, enhancing overall efficiency by 25%
Developed a predictive maintenance program that reduced unplanned machine breakdowns by 30%, significantly increasing production uptime
Trained new hires and existing staff on best practices, safety compliance, and advanced troubleshooting techniques
Initiated a cross-functional team collaboration that accelerated the resolution of complex production issues
Contributed to the negotiation of supplier contracts, achieving a 10% cost saving on maintenance materials and parts
Reduced maintenance costs by 15% through strategic equipment upgrades
Improved production efficiency by 20% with lean manufacturing initiatives
Successfully managed a maintenance budget by implementing approximately 150 small Kaizen improvements
Oversaw 25 ongoing projects with a total capital expenditure of Rs
10 crores
Boosted plant uptime by 12% by optimizing preventive maintenance schedules
Elevated safety compliance by reducing incidents by 25% through rigorous training programs
Updated ISO documents accurately, effectively reducing non-conformance issues
Created approximately 1,400 key spares in the Oracle system.
Education
SRTM University, Nanded Latur College
MBA in Disaster Management
Visvesvaraya Technological University BKIT College
Bachelor of Science in Mechanical Engineering
Skills
AutoCAD
Microsoft Office 360
Advance Excel
Inventor LT
Power BI
Oracle
Team Collaboration
Effective Communication
Innovative Problem-Solving
Analytical thinker
Creativity
Leadership
Adaptability
Project Management
Maintenance Planning
Lean Manufacturing
Six Sigma
Preventive Maintenance
Equipment Troubleshooting
ISO Standards
Erection and Commissioning
Operation
Inventory Control Management
Data Analysis
Accomplishments
Implemented Predictive Maintenance Program, Developed a program that foresaw equipment failures, cutting machine breakdowns by a third and elevating production reliability.
Reduced Equipment Downtime Significantly, Streamlined maintenance processes using Lean methodologies to decrease downtime by 20%, affirming equipment availability and team performance.
Championed Safety at the Workplace, Introduced new safety standards, resulting in zero incidents over two years, fostering a safety culture within the organization.
Led Cost-Saving Initiatives, Conducted cost analysis and optimized spare parts inventory, achieving an 8% reduction in annual maintenance costs.
Languages
English
Marathi
Hindi
Kannada
Passions
Innovation and Problem-Solving
Continuous Learning
Focus on Collaboration and Teamwork
Respect for Diverse Cultures and Humanity
Personal Information
Date of Birth: 04/12/89
Nationality: Indian
Projects
Press Part Modification for Improved Performance, Implemented modifications to press parts to enhance the efficiency and performance of the press. Headbox Modification to Reduce Fiber Losses, Redesigned the headbox to minimize fiber losses, improving overall material utilization. Design and Procurement of New Stack Disc Machine, Designed and procured a new stack disc machine, optimizing performance and operational efficiency. Installation of 10 M³ STP Plant, Installed a 10-cubic meter Sewage Treatment Plant (STP) at the facility to improve wastewater management. Complete Replacement of Compressed Air Line and Compressor, Overhauled the entire compressed air system, including the compressor, to prevent air leakage and enhance system reliability. Design, Drawing, Erection, and Commissioning of Filter Paper Melt Blow Machine, Designed, drafted, erected, and commissioned a new machine for filter paper pasting, streamlining production processes. Development of New Rotary Die, Created and designed a new rotary die, achieving cost savings and improved performance. Installation of MBC Filter Plant, Installed an MBC filter plant to enhance filtration processes and operational efficiency. Design and Installation of Slit Cut Machine, Designed and installed a new slit cut machine, contributing to improved cutting precision and productivity.
Timeline
Manager Plant Engineering
Filtrum Fibretechnology Pvt Ltd
08.2012 - Current
SRTM University, Nanded Latur College
MBA in Disaster Management
Visvesvaraya Technological University BKIT College
Stacker at Engineering and Allied Services Pvt. Ltd, Lift & Shift India Pvt. Ltd, Roadwings International Pvt. Ltd, Western Carriers India Pvt. Ltd, Tractor India Pvt. Ltd, Transworld Terminal Pvt. LtdStacker at Engineering and Allied Services Pvt. Ltd, Lift & Shift India Pvt. Ltd, Roadwings International Pvt. Ltd, Western Carriers India Pvt. Ltd, Tractor India Pvt. Ltd, Transworld Terminal Pvt. Ltd
Purchase Manager,B2B Manager,Bsv Depo Manager at SK GROUP-SKITES PHARMA PVT LTD & SKANT INDIA PVT LPurchase Manager,B2B Manager,Bsv Depo Manager at SK GROUP-SKITES PHARMA PVT LTD & SKANT INDIA PVT L