Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

VIVEK NIGAM

Production , Process Excellence
Gandhidham,GUUJRAT

Summary

Production Manager bringing 3 years of experience in diverse environments. Driven to deliver high-quality goods according to demanding schedules. Equipped to take reigns of any average production line and bring about remarkable results. Highly analytical and organized with detail-oriented mentality and flexible nature to handle any challenge.

Overview

10
10
years of professional experience
7
7
years of post-secondary education

Work History

Assistant Production Manager

ELECTROTHERM
Bhachau, INDIA
06.2019 - Current
  • ASSIGNED TARGET - To reduce power consumption of induction furnace.
  • ACHIEVED : 168 TO 138 UNIT/MT.
  • Monitoring of parameters and data involved at various levels of operations insuring proper follow up of process parameters for quality product.
  • Ensuring quality of product through various approach of RCA, Why-Why analysis.
  • Enhancing existing process and formulating new processes to improve usage of manufacturing resources of the company.
  • Implementing Kaizen, 5s at every month to ensure proper utilization of space, safety and to standardized and sustain the SOPS.
  • Responsible for MOULD SHOP operation,

Associate Manager

JAI BALAJI INDUSTRIES LIMITED
Durgapur , west bengal
04.2018 - 05.2019
  • Implemented performance, quality and efficiency measures to achieve aggressive production goals.
  • Directed manufacturing process and operational efficiency procedures to achieve goal of first run capability.
  • Investigated and implemented ideas for quality improvement, increased productivity and cost reduction.
  • Created streamlined production schedules and collaborated with production employees to communicate objectives and goals.
  • To handle the operation of centrifugal casting machine.
  • To analyze the wastage of material in running machine.
  • To figure out the consumption of material and measures to improve.
  • Capacity to analyze the defects in casting and reduce the rejection.
  • Achievement:.
  • Target – To figure out the consumption of mould powder and measure to improve.
  • Result – Earlier figure was 4.2 – 4.8kg/ton Now it is 3.2-3.6kg/ton.
  • Target – To increase the productivity of DN100.
  • Result – Achieved highest no’s in two machines i.e.
  • 33567 Earlier it was in two machines i.e.
  • 29477.
  • Target – To increase the productivity of plant in terms of tonnage by focusing the system.
  • Result – Achieved 13124 in march’19 Previous best was 13059 in January ’17
  • ABZAN CONSTRUCTION PVT.LTD.
  • Duration: Dec’12- March’14 Designation:Site Engineer Responsibilities:.
  • Good hands on skill for preventive maintenance of boiler equipment as like pressure parts, rotary parts, ash handling plants and utility.

Site Engineer

ABZAN CONSTRUCTION PVT.LTD
Birsinghpur, Madhya pradesh
12.2012 - 03.2014
  • Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.

Education

M.tech ( Manufacturing) - Manufacturing Engineering

IIT ( ISM) DHANBAD
DHANBAD
07.2016 - 05.2018

B.E. - Mechanical Engineering

RGTU
BHOPAL
08.2008 - 06.2012

12TH - Physics, Chemistry, Maths

Board Of Secondary Education
MPEB
07.2007 - 04.2008

High School Diploma -

Board Of Secondary Education
MPEB
07.2005 - 04.2006

Skills

PRODUCTION

undefined

Accomplishments

ASSIGNED TARGET - To reduce power consumption.

ACHIEVED : 168 To 140 unit/tonn.

Timeline

Assistant Production Manager

ELECTROTHERM
06.2019 - Current

Associate Manager

JAI BALAJI INDUSTRIES LIMITED
04.2018 - 05.2019

M.tech ( Manufacturing) - Manufacturing Engineering

IIT ( ISM) DHANBAD
07.2016 - 05.2018

Site Engineer

ABZAN CONSTRUCTION PVT.LTD
12.2012 - 03.2014

B.E. - Mechanical Engineering

RGTU
08.2008 - 06.2012

12TH - Physics, Chemistry, Maths

Board Of Secondary Education
07.2007 - 04.2008

High School Diploma -

Board Of Secondary Education
07.2005 - 04.2006
VIVEK NIGAMProduction , Process Excellence