Accomplished Electrical Engineer with a proven track record at Arcadis, specializing in BIM Modeling and the commissioning of HVAC substations. Expert in Bentleysoftwares, demonstrating exceptional collaboration skills and a commitment to enhancing operational efficiency. Achieved significant improvements in project integration and quality standards, leveraging both technical expertise and innovative problem-solving abilities.
Project Brief:
The local transport network, including buses and the Midland Metro, with a tram line running alongside and under the station, connects the city with Digbeth. The new high-speed rail station is being built on the site of Birmingham's 19th-century station at Curzon Street.
Duties and Responsibilities:
Executed detailed 3D modeling of the Cable Management System, including cable trays, ladders, trunkings, and low-level ducting, using OpenBuildings Designer software. Coordinated multi-discipline efforts to resolve clashes between services, ensuring seamless integration of the Cable Management System.
Project Brief:
Create a new Platform 0 at Bradford Forster Square station on the Downside of the
formation located opposite Platform 1 (ES4 Stage).
Duties and Resposibilities:
Created models and drawing sheets in ProjectWise, ensuring accurate representation of luminaires, lighting columns, and CMS services. Coordinated with multiple disciplines to resolve clashes, enhancing project workflow efficiency. Performed workflow processes in ProjectWise, maintaining streamlined project management and documentation.
Project Brief:
The project includes the development of a Concept Design Statement for the Staff Accommodation Block (SAB). The new SAB will be a modular building supported on shallow foundations, with utilities connections, and MEP services.
Duties and Responsibilities:
Utilized Trueview and Aecosim software to produce accurate 3D and 2D models, enhancing the design and implementation of electrical services. Created detailed sections and elevations for all electrical services related to External Lighting and CMS Systems using Aecosim software. Collaborated with multiple disciplines to resolve clashes and ensure seamless integration of services. Executed CADQA processes and addressed issues, while managing workflow in ProjectWise. Executed the entire workflow process using ProjectWise.
Project Brief:
The Beckton depot upgrade is of proposed changes to the DLR train fleet. The
existing B2007 trains will be retained but the older B92 trains will be replaced by new trains of 88m long fixed formation. Overall, there will be an increase in the number of trains in the DLR fleet. The Beckton depot upgrade will provide a new maintenance shed dedicated to the maintenance of the new 88m long trains.
Duties and Responsibilities:
Developed and updated 3D models for CMS and Earthing using Aecosim software.
Updated drawing sheets to reflect recent changes and modifications. Collaborated with multidisciplinary teams to resolve design clashes and streamline the Workflow process in ProjectWise.
Project Brief:
The Piccadilly Line Lighting Main work stream scope is driven by London
Underground’s need to run the new train stock (24TS) which has a different platform train interface to the current PL fleet.
Duties and Responsibilities:
Developed 3D and 2D models, created sheets, and prepared layouts and schematics for electrical switch rooms at three stations: Arsenal, Finsbury Park, and Turnpike Lane.
Modeled other disciplinary services, including walls and doors, to ensure comprehensive project coverage. Addressed CADQA issues to maintain high standards of quality and accuracy in all designs.
Project Brief:
The PLU is the first of the lines to be upgrade as part of the Deep Tube Upgrade Programme (DTUP), which will progress to upgrade the Bakerloo, Central and Waterloo and City Line at a date to be confirmed in the future.
Duties and Responsibilities:
Developed detailed 3D and 2D models, including sections and elevations, for electrical services such as Lighting, Small Power, and CMS Systems. Collaborated with multi-discipline teams to resolve clashes using Bentley Navigator, ensuring seamless project integration. Executed CADQA processes and resolved issues, while managing workflow processes within ProjectWise.
Conducted testing and commissioning of SIEMENS and ABB relays across various voltage substations, ensuring operational efficiency. Performed substation operations using SICAM PAS SCADA.
Performed testing and commissioning of NR Relay panels, ensuring compliance with technical standards.
Manufactured and tested UPS systems to provide reliable backup power for hospital ventilators during the Covid-19 pandemic. Conducted thorough testing of stabilizers and UPS units under both load and no-load conditions to ensure optimal performance.
Key Skills:
Software Skills: