Assistant Manager - Civil Engineering with 8 years of overall experience in infrastructure and renewable energy projects. Possessing 5.5 years of expertise in Railway, Highway, and Bridge construction projects, along with 2.5 years of experience in Wind Energy projects. Skilled in project execution, site management, quantity estimation, contractor coordination, quality control, planning, and supervision of large-scale civil works. Proven ability to deliver projects within schedule while ensuring compliance with safety and quality standards.
Overview
8
8
years of professional experience
1
1
Certification
1
1
Language
Work History
Assistant Manager
Avaada Clean Project Private Limited
07.2026 - Current
Project name: - (52+48)MW_BEED (KAIZ) And 300 MW_KALAMB WIND RENEWABLE ENERGY PROJECT AT MAHARASHTRA.
Client: Sany Wind Energy India
Led team in executing operational strategies to enhance project delivery timelines.
Coordinated cross-functional teams to ensure alignment on project objectives and deliverables.
Oversaw daily operations to maintain store cleanliness and organization.
Streamlined operational processes to enhance efficiency and reduce costs.
Civil construction Planning – daily wise, weekly wise, monthly wise and annual wise planning for civil construction.
Plan V/s Actual – daily basis plan has to share with team and contractor and take from him actual output daily.
Customer coordination & RFI generation – before starting any activity regarding the foundation inform the customer and generate the RFI for checking each and every activity. after clearance of the customer go ahead.
Junior Engineer
Adani Infra India Limited- Next Edge Ecommerce Pvt Ltd & NetAmbit Value First Services Pvt Ltd
11.2024 - 07.2026
Project name: world's largest 30 GW Khavda Renewable Energy Park (also known as Gujarat Hybrid Renewable Energy Park). First phase (Gujarat, India).
Client: Adani Green Energy Limited
1. Civil construction Planning – daily wise, weekly wise, monthly wise and annual wise planning for civil construction.
2. Plan Vs Actual – daily basis plan has to share with team and contractor and take from him actual output daily.
4. Coordinated with customer to generate RFIs before foundation activities, ensuring all tasks received prior approval for seamless project execution.
5. Material testing and certification report – before use the material (water, Aggregate, admixture, cement, etc.), witness the testing and collect the certification from NABL approved laboratory.
Checked the coarse and fine aggregate report, water test report, and admixture report to meet QC requirements.
7. Coordinate checking- coordinate checking by GPS before soil testing & after excavation before PCC.
8. Excavation & PCC- by fixing the TBM and executing the excavation depth level by AUTO LEVEL & diameter as per drawing then after that do the PCC with rolling& watering.
9. Shuttering & concreting- do the shuttering after completion of the bar binding and checking by customer & TPIA then do the concreting as per drawing requirements and fill up the cube for testing the strength.
10. Curing, Backfilling & grouting- after removing the shuttering do the curing as per procedure then do the backfilling by vibro roller as per requirements t/m square load and do the FDD test then do the grouting as per drawing by mixing of the grouting cement by electric stunner or hand mixer and do the cube testing of the same.
11. Grouting curing & platform- do the grouting curing and platform with proper rolling and compaction.
12. road construction- external & internal road construction with rolling & compaction for WTG movement.
13. Crane Pad – construct the crane platform before reaching the crane at location.
14. Checklist preparation – checklist of the trail mix & foundation fills up at the same time of working.
16. Managed engineers and contractors effectively, fostering teamwork and collaboration to meet project goals.
17. Customer Satisfaction: customer satisfaction is first for us and always needs the delight of the customer.
18. Shared daily, weekly, and monthly site progress reports, providing stakeholders with clear updates on project developments.
Led operational improvements to enhance efficiency in e-commerce processes.
Streamlined communication between departments to facilitate project execution and support team collaboration.
Structural Engineer
Megha Engineering & Infrastructures
05.2022 - 11.2024
Client: Rail Vikas Nigam Limited
Project cost: - 2000 crore
Designation: Structural Engineer (Bridge)
Project name: CONSTRUCTION OF TUNNELS, BRIDGES, YARDS AND FORMATION WORKS FROM CHAINAGE 101+368 TO 117 + 365, UNDER PACKAGE -8 IN CONNECTION WITH NEW BG LINE BETWEEN RISHIKESH AND KARANPRAYAG (125KM) IN STATE UTTARAKHAND, INDIA.
Execution of Piling work of Major Bridge.
Execution of Well Foundation work for Major Bridge.
Execution of 10m ht. Retaining wall & Box Culvert.
Site execution and supervision of the works from planning to implementation, according to drawing and conditions.
Responsible for maintaining all documents related to Bridges. * Responsible for Billing (Site Works Management System).
Reconciliation of reinforcement and other material as per MIS format and measurements of sub- contractor Billing.
Structural Engineer
Agarwal Global Infratech Pvt. Ltd.
02.2020 - 04.2022
Project name: - Construction of Mitigation Major Structure on MH/CG Border to Wainganga Bridge Section of NH – 6 (New NH - 53).
Project cost : - 360 crore
Client: National Highways Authority of India
Led project teams in construction and maintenance of bridge structures, ensuring compliance with safety regulations.
Developed and implemented innovative engineering solutions to enhance project efficiency and effectiveness.
Monitored project progress closely, identifying potential issues early on and taking corrective action.
Reduced construction costs through diligent evaluation of materials and suppliers, ensuring best value without compromising quality.
Managed subcontractors to ensure timely completion of tasks, maintaining project schedules and budgets.
Coordinated with local authorities to obtain necessary permits and approvals in a timely manner, avoiding potential delays in project progress.
Conducted regular site inspections to monitor construction progress while identifying any deviations from planned designs or schedules.
Site Engineer
JMCC Construction Pvt. Ltd. Company.
07.2018 - 01.2020
Project name: - Upgradation of Highway Starting from Junction with Nh 44 At Panipat Connecting Kairana, Shamli, Muzaffarnagar, Miranpur, Bijnor and Terminating at Its Junction with Nh -74 at Kotawali to Two / Four Lane with Paved Shoulder Configuration (Pkg No. Nh / Ahe / 47, Category - Ii)-Shamli to Muzaffarnagar.
Project cost: 972 crore
Client: National Highways Authority of India
Supervised construction activities to ensure compliance with engineering standards and regulations.
Coordinated project schedules, resources, and subcontractors to optimize workflow efficiency.
Conducted site inspections to assess progress and quality of work performed by contractors.
Developed and implemented safety protocols to minimize risks on construction sites.
Trained junior engineers on best practices in site management and construction techniques.
Analyzed project data to identify cost-saving opportunities and enhance operational performance.
Led weekly project meetings to communicate updates, address challenges, and align team objectives.
Checked technical designs and drawings for adherence to standards.
Documented daily events and activities in site diary.
Assistant Manager at Adani Infra India Limited- Next edge ecommerce Pvt ltd & NetAmbit Value First Services Pvt LtdAssistant Manager at Adani Infra India Limited- Next edge ecommerce Pvt ltd & NetAmbit Value First Services Pvt Ltd