Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Additional Information
Languages
Awards And Accolades
Timeline
Generic
Waseem Hashmat

Waseem Hashmat

Varanasi

Summary

NTPC is India's largest energy conglomerate. NTPC became a Maharatna company of India in May 2010. NTPC is best PSU. NTPC is ranked No. 2 Independent Power Producer (IPP) in Platts Top 250 Global Energy Company rankings. inducted in NTPC Ltd as an ET (Executive Trainee) in August-2007, in one of the toughest & most prestigious way of hiring. I got elevated five times without break and worked in different domains and presently working in a capacity of DGM (Deputy General Manager) in NTPC Rihand for Electrical maintenance. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on challenges to meet career aspirations & excel in the field of Energy management. With in depth knowledge & more than 15 Years of experience in various departments of 'Thermal Power plant' operation & maintenance which also includes comprehensive knowledge of Contracts & Materials procurement. Aspiring to be a part of the world's renowned organization engaged in upstream and downstream operations, energy conglomerates.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Electrical Maintenance Manager

NTPC Ltd.
Rihand
05.2018 - Current
  • Company Overview: NTPC is India's largest energy conglomerate. NTPC became a Maharatna company of India in May 2010. NTPC is best PSU. NTPC is ranked No. 2 Independent Power Producer (IPP) in Platts Top 250 Global Energy Company rankings.
  • From 2018 to till date, DGM (Electrical Maintenance) in A 3000MW Super thermal power plant and responsible for maintenance of all Power & LT Transformers (200 MVA GTs, 60 MVA STs, 48 MVAs UTs), Other HT/LT transformers, 11KV network, 400/132KV Switchyard, Plant PA system, Plant lighting & cabling system etc.
  • Department's IMS (Integrated management system) coordinator, responsible for working within the purview of ISO-9001 (QMS), ISO-14001(EMS) & ISO-45001 (OHSMS) & with in the legal boundary of the standards.
  • Quality manager of our NABL accredited “Electrical Testing lab” for Testing of Current transformers.
  • Got extensive knowledge of Dragging, fitting, Testing, Control & logics, Erection & Commissioning of upto 200MVA Generator, 200MVA Inter Bus transformers etc.
  • Selected by NTPC top paced performer and got training on 10X leadership in multi-dimensional managerial aspects from IIM.
  • Associated closely in the NTPC projects like Dry Ash extraction system, FGD (Flue gas desulphurization) in compliance to NGT (National Green Tribunal of India).
  • Entire Plant lighting & cabling maintenance which includes extensive experience of cable laying, HIPOT testing & plant illumination system.
  • Associated in 20MW solar PV development project at NTPC Rihand
  • NTPC is India's largest energy conglomerate. NTPC became a Maharatna company of India in May 2010. NTPC is best PSU. NTPC is ranked No. 2 Independent Power Producer (IPP) in Platts Top 250 Global Energy Company rankings.

Operation & Maintenance Executive

NTPC Ltd.
Shaktinagar
08.2008 - 05.2018
  • Company Overview: NTPC is India's largest energy conglomerate. NTPC ranked 14th in “Great Place to work” ranking for India and being consistently featuring in the list top performers for last 11 years in a row.
  • Posted in Singrauli Super Thermal Power Plant of 2000 MW capacity Worked in Fuel handling Operation & maintenance of 2000MW capacity and was responsible for operation of “Coal handling Plant” for ensuring availability of coal to all the stages of 2000MW plant for smooth running throughout the year.
  • Responsible for effective co-ordination with CIL's (Coal India Limited) Subsidiary named NCL for supply of coal as per FSA (fuel supply agreement) and responsible for safe unloading, feeding & storage of almost 35000 to 40000 MT of coal every day for feeding to coal bunkers & storage to coal yard as required.
  • Being a shift charge engineer, responsible for effective co-ordination with main plant operation & various other internal interested parties like Mechanical maintenance, electrical maintenance, Planning dept, Contracts & materials functions etc.
  • NTPC is India's largest energy conglomerate. NTPC ranked 14th in “Great Place to work” ranking for India and being consistently featuring in the list top performers for last 11 years in a row.

Executive Trainee

NTPC Ltd.
Shaktinagar
08.2007 - 08.2008
  • Company Overview: NTPC is India's largest energy conglomerate. NTPC ranked 14th in “Great Place to work” ranking for India and being consistently featuring in the list top performers for last 11 years in a row.
  • I was inducted in NTPC Ltd as an ET (Executive Trainee) in August-2007 after that I undergone 1-year rigorous training then got posted in NTPCs flagship project as Operation Executive (FM)
  • NTPC is India's largest energy conglomerate. NTPC ranked 14th in “Great Place to work” ranking for India and being consistently featuring in the list top performers for last 11 years in a row.

Education

Master of Technology - Power System & Drives

Aligarh Muslim University
01.2007

Bachelor of Technology (B.Tech) - Electrical & Electronic

United College of Engineering & Research
01.2004

Skills

  • O&M experience in Thermal Power plant
  • Presentation skill
  • Writing skill
  • Advanced Excel
  • Software knowledge
  • C
  • Python
  • Leadership skills
  • Operation & maintenance of thermal power plant
  • Renewable energy development
  • Grid integration
  • Energy storage solutions
  • SAP ERP system
  • Contracts & Material knowledge
  • Procurement of Material & services

Certification

  • Certified Visual Basic programmer.
  • Certified Project management.
  • Certified by CBIP (Central Bureau of Irrigation & power) in Renewable energy development & Grid integration along with Energy storage solutions.

Accomplishments

  • Accomplished several tedious jobs single-handedly like negotiating the Borrowing of GT of rating 200MVA from State Power utility by mobilizing resource, manpower and was able to showcase my exhaustive inter-personal skills by handling several external parties like CISF, HR, Site O&M, C&M and bring back 500MW unit in record low time & saved almost 6-8 Million unit of loss.
  • Accomplished 7 Nos 200MVA GT Repair at BHEL (Bharat Heavy Electricals Ltd, a Maharatna company of India) & complete transportation, Erection & Commissioning.

Additional Information

The enthusiastic learners and trouble shooter., Extensive experience of Mechanical maintenance where I was responsible for maintenance of various 'Heavy earth Moving Equipments' like Dozer, Hydra, pay loader etc. and responsible for various R&M (Renovation & modernization) activities., Several capital projects got completed under my supervision like Procurement of 06 Nos. of BD 355 BEML make Heavy equipment Dozers, DFDS system installation in Crusher house, MVW based Fire detection & prevention system in Stackers/Reclaimers, New Electronic Belt weighers, Revival of heavy dozer engines with BEML (Bharat Earths Movers ltd.).

Languages

Hindi
English
Urdu

Awards And Accolades

  • Received 'HOP (Head of Plant)' Meritorious award 7 Times in 15 years of service.
  • Conferred with Power excellence award, among one of the prestigious award by NTPC management.
  • Received Multiple appreciation letters for outstanding works accomplished within stipulated time.
  • Was recognized for my creative skill to develop 'Heavy machinery' engine protection circuit from scrap materials and was appraised by highest authorities.

Timeline

Electrical Maintenance Manager

NTPC Ltd.
05.2018 - Current

Operation & Maintenance Executive

NTPC Ltd.
08.2008 - 05.2018

Executive Trainee

NTPC Ltd.
08.2007 - 08.2008

Master of Technology - Power System & Drives

Aligarh Muslim University

Bachelor of Technology (B.Tech) - Electrical & Electronic

United College of Engineering & Research
Waseem Hashmat