Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Projects Handled
Father's Name
Aadhaar No
Personal Information
Profile Summary - Summary
Timeline
Generic
YANDRAPU HARI KALYAN

YANDRAPU HARI KALYAN

Dibrugarh

Summary

With over 26 years of experience in executing various infrastructure projects, including railways, roads, bridges, runways, irrigation canals, and buildings, I am a self-motivated civil engineer. My extensive knowledge of construction materials and modern equipment has contributed significantly to the development of the nation's infrastructure. Building strong relationships with staff and clients has been crucial to my successful track record. I possess decision-making, analytical, problem-solving, leadership, and project management skills. Throughout my career, I have excelled in construction and project management, alignment and engineering drawings, subcontract management, cost control, billing, and closeout processes. Additionally, I am skilled in utilizing modern survey instruments to ensure compliance with specifications set by national authorities such as the National Highway Authority of India, MSRDC, Airport Authorities, and Railway (DFCCIL, RVNL & IRCON).

Overview

27
27
years of professional experience

Work History

Project Manager Civil

KEC international Limited
08.2024 - Current
  • Client: IRCON
  • Name of the Project: Design, Supply, Installation, Testing & Commissioning of Railway Electrification work for Lumding – Dibrugarh Via Tinsukia and Simaluguri – Dibrugarh Sections (497 RKM/650 TKM) of Northeast Frontier Railway (NFR) (Package No. 6) on Engineering, Procurement and Construction (EPC) Mode.
  • Project Cost: 521.00 Cr
  • · Organizing / participating in project review meetings for evaluating project progress & de- bottlenecking
  • · Liaising with Consultants, Clients, Sub-contractors & External Agencies for determining technical specifications, approvals and obtaining statutory clearances
  • · Working in close coordination with clients, architects and consultants; obtaining approvals from client as well consultant, from time to time during execution of project
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Provided detailed project status updates to stakeholders and executive management.
  • Planned, designed, and scheduled phases for large projects.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Coordinated material procurement and required services for projects within budget requirements.

Dy. Project Manager

KEC International Limited
11.2023 - 08.2024
  • Client : Dhamra Port Company Limited
  • Name of the Project: Engineering Procurement & Construction Contract for Dhamra Railway Doubling- Phase 2 from Manthai River (Including) to Bhatatira and track linking and OHE works for phase 1B for new main line from DTY to Manthai river with new loop line at Bansara & DTY and up gradation of existing looping line to main line at Gurdaspur yard on Bhadrak – Dhamara Port Non- Government Railway system of Dhamra Port Company Limited at Dhamra, Odisha
  • Project Cost : Rs.402.07 Cr
  • Collaborated closely with Project Managers on all aspects of planning, execution, and monitoring of projects to ensure success.
  • Negotiated contracts with vendors, securing favorable terms for the organization and improving overall project profitability.
  • Conducted detailed analyses of budgets, schedules, and resources to optimize resource allocation for maximum efficiency.
  • Cultivated strong relationships with clients, resulting in repeat business and increased referrals.
  • Ensured timely completion of projects by effectively delegating tasks and prioritizing milestones.

Dy. Project Manager

KEC International Limited
03.2021 - 08.2024
  • Client : Dhamra Port Company Limited
  • Name of the Project: Construction of Doubling track between Vanchi Maniyachichi(MCJ) to Nagercoil (NCJ) (Via Tirunelveli) 102.490 KM – Construction of road bed, Minor bridges, platforms, Buildings, Water Treatments, Wagon/ Coaching maintenance infrastructure, supply of ballast, Installation of track, General Electrical, Provision of OHE, Signalling and Telecommunication works in Madurai & Thiruvananthapuram Divisions of Southern Railway, Tamil Nadu
  • Project Cost : Rs.668.94 Cr
  • Evaluated completed projects'' outcomes against established objectives and created detailed reports on lessons learned for future reference.
  • Collaborated closely with Project Managers on all aspects of planning, execution, and monitoring of projects to ensure success.
  • Enhanced communication among team members with regular meetings, progress reports, and status updates.
  • Negotiated contracts with vendors, securing favorable terms for the organization and improving overall project profitability.
  • Conducted detailed analyses of budgets, schedules, and resources to optimize resource allocation for maximum efficiency.
  • Cultivated strong relationships with clients, resulting in repeat business and increased referrals.
  • Ensured timely completion of projects by effectively delegating tasks and prioritizing milestones.

Manager

Afcons infrastructure limited
04.2019 - 03.2021
  • Client: Maharashtra State Road Development Corporation (MSRDC)
  • Name of the Project : · Constructions of Missing Link with viaduct from Km 0+000 to 13+300 & Upgrade to 8 Lane from 32+800 to 38+660 Under capacity augmentation of Mumbai Pune Expressway in the state of Maharashtra under EPC Mode
  • Project Cost: 1331.00 Cr
  • Accomplished multiple tasks within established timeframes.
  • Managed and motivated employees to be productive and engaged in work.
  • Maintained professional, organized, and safe environment for employees and customers.
  • Developed and maintained relationships with customers and suppliers through account development.
  • Developed detailed plans based on broad guidance and direction.
  • Controlled resources and assets for department activities to comply with industry standards and regulations.

Dy. Project Manager

TATA Projects Limited
03.2013 - 04.2019

Client: DFCCIL

Project Name: Design & Construction of Civil, Structures and Track Works for Double Line Railway involving formation in Embankments/Cuttings, Ballast on Formation, Track works, Bridges, Structures, Buildings, including Testing and Commissioning on Design – Build Lump Sum basis for Bhaupur – Khurja Section of Eastern Dedicated Freight Corridor

Project Cost : 1330.00 Cr

Associate Manager

GMR Infrastructure Pvt.
05.2006 - 03.2013

Project - 3: Rehabilitation and up gradation of existing 2 lane road to 4/6 lane divided carriageway configuration of Hyderabad – Vijayawada Km 40.00 to 105.350 of National Highways Authority of India (NHAI) DFBOT Road Projects – NH-9 in Andhra Pradesh

Project - 2: Rehabilitation of Runway 10/28, Indira Gandhi International Airport, New Delhi

Project - 1: Rehabilitation & upgradation of existing 2 lane road to 4/6 lane divided carriageway configuration of Tindivanam – Ulundurpet Km121.00 to 192.25 of National Highways Authority of India (NHAI) BOT Road Projects – NH-45 in Tamil Nadu

Surveyor

Wilbur Smith Associates Pvt. Ltd.
02.2006 - 05.2006

Tamil Nadu Road Development Company, ITEL (IT Expressway Limited Supervision and monitoring of improvement works on IT Corridor)Company Overview: Bangalore

Surveyor

Feedback Turnkey Engineers Pvt. Ltd.
02.2004 - 01.2006
  • Company Overview: New Delhi
  • Project - 3: • Gujarat State Highway Projects (GSHP) package 11 (Falla to Jamnagar and Jamnagar to Khambhalia)
  • Project - 2: Engineer of GMR Tuni – Anakapalli Expressways Pvt. Ltd., Bangalore: Rehabilitation and upgradation of existing 2 lane road to 4/6 lane divided carriageway configuration of Tuni – Anakapalli Km 300.00 to 359.2 of National Highways Authority of India (NHAI) Annuity Road Projects – NH-5 in Andhra Pradesh
  • Project - 1: Engineer of GMR Tambaram - Tindivanam Expressways Pvt. Ltd., Bangalore: Rehabilitation & upgradation of existing 2/4 lane road to 4/6 lane divided carriak2geway configuration of Tambaram to Tindivanam Km. 28.00 to 121.00 of National Highways Authority of India (NHAI) Annuity Road Projects – NH-45 in Tamil Nadu

Surveyor

K M International AB, Sweden (JV) With Secon Surveys (P) Ltd.
09.2001 - 02.2004
  • Company Overview: Bangalore
  • Rehabilitation & upgradation of 2 existing lane road to 4/6 lane divided carriageway configuration of Kavali to Ongole Km 222 to 291 of NH-5 in Andhra Pradesh.

Site Engineer

M/s Pondla Construction
03.2000 - 08.2001
  • Company Overview: Bangalore
  • Bangalore

Technical Supervisor

M/s Nandh Construction
05.1998 - 03.2000
  • Company Overview: Nellore
  • Nellore

Education

Bachelor of Civil Engineering - Civil Engineering

Karnataka State Open University
Hyderabad
01.2015

Certification course in Construction Management - Construction Management

NICMAR
Hyderabad
01.2012

Diploma in civil -

Government Polytechnic College
Gudur, Andhra Pradesh
01.1998

Skills

  • Experienced in AutoCAD Design
  • Expertise in MS Office Suite
  • Single Lane MX-Road Expertise
  • Power Rail System
  • Effective Project Management
  • Project Monitoring

Accomplishments

  • Successfully Completed Commission of Railway Safety (CRS) 3 Section, 7 Stations/yards and 57.5 KM Length in Southern Railways
  • Successfully completed Track laying & linking of 120 Km of Two Lines in EDFCC Project
  • Commission of Railway Safety (CRS) approval for Modification of Existing Indian Railway Yards 5 Nos for EDFCC Project in NCR
  • Completion of Non-Inter Link (NI) for Modification of Existing Indian Railway Yards three Nos in North Central Railways
  • Successfully completed & Handed over the following 3 projects and involved since from conceptual planning of Project

Languages

Telugu
English
Hindi
Tamil

Projects Handled

  • KEC International Limited, Rs. 714 Cr, Construction of Doubling track between Vanchi Maniyachichi(MCJ) to Nagercoil (NCJ) (Via Tirunelveli) 102.490 KM - Construction of road bed, Minor bridges, platforms, Buildings, Water Treatments, Wagon/ Coaching maintenance infrastructure, supply of ballast, Installation of track, General Electrical, Provision of OHE, Signalling and Telecommunication works in Madurai & Thiruvananthapuram Divisions of Southern Railway, Tamil Nadu
  • Afcons Infrastructure Limited, Rs. 1331 Cr, Constructions of Missing Link with viaduct from Km 0+000 to 13+300 & Upgradation to 8 Lane from 32+800 to 38+660 Under capacity augmentation of Mumbai Pune Expressway in the state of Maharashtra under EPC Mode
  • TATA Projects Limited, Rs. 1330 Cr, Design & Construction of Civil, Structures and Track Works for Double Line Railway involving formation in Embankments/Cuttings, Ballast on Formation, Track works, Bridges, Structures, Buildings, including Testing and Commissioning on Design - Build Lump Sum basis for Bhaupur - Khurja Section of Eastern Dedicated Freight Corridor
  • GMR Infrastructure Pvt. Ltd., Rs. 850 Cr, Rehabilitation and up gradation of existing 2 lane road to 4/6 lane divided carriageway configuration of Hyderabad - Vijayawada Km 40.00 to 105.350 of National Highways Authority of India (NHAI) DFBOT Road Projects - NH-9 in Andhra Pradesh
  • Wilbur Smith Associates Pvt. Ltd., Rs. 200 Cr, Tamil Nadu Road Development Company, ITEL (IT Expressway Limited Supervision and monitoring of improvement works on IT Corridor)
  • Feedback HSS integrated Pvt. Ltd., Rs. 295,416 Cr, Engineer of GMR Tuni - Anakapalli Expressways Pvt. Ltd., Bangalore: Rehabilitation and upgradation of existing 2 lane road to 4/6 lane divided carriageway configuration of Tuni - Anakapalli Km 300.00 to 359.2 of National Highways Authority of India (NHAI) Annuity Road Projects - NH-5 in Andhra Pradesh

Father's Name

Yandrapu Kanakalingeswara Rao

Aadhaar No

5257 9569 5489

Personal Information

Date of Birth: 08/26/78

Profile Summary - Summary

Self-motivated civil engineer with over 26 years of rich experience in Execution of Railway, Roads / National Highways, Bridges, Runways, Irrigation canals and buildings with extensive knowledge of construction materials and modern construction equipment for Nation Infrastructure Projects. Record of accomplishment of building strong relationships with staff and clients. Strong decision-making, analytical, problem-solving, leadership and project management skills. Experienced in Construction & project management, Alignment & Engineering drawings, execution, subcontract management, cost control, billing, and close out. Skilled in handling the modern survey instrument for formulating the jobs in accordance with MOST/MORTH, CAR & RDSO specifications of National Highway Authority of India, Airport Authorities and Railway (RVNL & DFCCIL) respectively.

Timeline

Project Manager Civil

KEC international Limited
08.2024 - Current

Dy. Project Manager

KEC International Limited
11.2023 - 08.2024

Dy. Project Manager

KEC International Limited
03.2021 - 08.2024

Manager

Afcons infrastructure limited
04.2019 - 03.2021

Dy. Project Manager

TATA Projects Limited
03.2013 - 04.2019

Associate Manager

GMR Infrastructure Pvt.
05.2006 - 03.2013

Surveyor

Wilbur Smith Associates Pvt. Ltd.
02.2006 - 05.2006

Surveyor

Feedback Turnkey Engineers Pvt. Ltd.
02.2004 - 01.2006

Surveyor

K M International AB, Sweden (JV) With Secon Surveys (P) Ltd.
09.2001 - 02.2004

Site Engineer

M/s Pondla Construction
03.2000 - 08.2001

Technical Supervisor

M/s Nandh Construction
05.1998 - 03.2000

Diploma in civil -

Government Polytechnic College

Bachelor of Civil Engineering - Civil Engineering

Karnataka State Open University

Certification course in Construction Management - Construction Management

NICMAR
YANDRAPU HARI KALYAN