Summary
Overview
Education
Skills
Previous employers
Industrial construction experience
PEB,MS steel structure experience
Estimation tendering skills
Quality & Monitoring skills
Extra skills
Last organization
Projects in last organization
Previous employer
Projects in previous employres
Previouse employer2
Projectsinpreviousemployer2
Previousemployer3
Projectsinpreviousemployer3
Previousemployer4
Projectsinpreviousemployer4
Previousemployer5
Projects in previous employer5
Personal Information
Projects
Disclaimer
Software
Languages
Interests
Timeline
Generic
Yogesh Jha

Yogesh Jha

Civil & Structure- Industrial projects
Bikaner

Summary

15 years’ experience in green & brown fields projects and estimation teams on a range of projects with EPC & PMC.

Working as a civil/structural in-charge, I have worked on many projects, including Power Plants, Oil & gas, Refinery project, Chemical Plant, Water treatment plant (ZLD, ETP & STP) the projects being completed successfully and with very positive feedback from the manager team. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

6
6
years of post-secondary education

Education

BE in Civil Engineering - Civil Engineering

Sant Gadge Baba Amravati University
Bhandara, India
08.2007 - 10.2010

Polytechnic Dip in Civil Engineering - Civil Engineering

Technical Board of Jodhpur
Government Collage Of Ajmer Polytechnic
07.2002 - 06.2005

Senior Secondary Education- PCM

Ajmer Education Board
04.2001 - 04.2000

High School -

Ajmer Education Board
07.1996 - 04.1997

Skills

    Monitoring & supervising as lead in charge: - All construction activities include providing technical inputs-ordination with site management activities Preparing and reviewing method statements & work specific quality Implementation of the industrial standards Quality and HSE guidelines Procumbent and equipment tracking, Reviews & tracking of projects planning and schedule

    Leadership control on all project activity as per project team organization chart Coordination: - All drawings before execution consult with our design team, cross functional activity and client technical service Reviews of drawings before approval and GFC & IFC, if any deviation will execute after resolving all IFR, FRQs,Tracking of upcoming drawings DCI, knowing about desired work permits as per requirement of nature of works, safety task analysis, tool boxes, height permit, worker & tools validation, scaffolding procedure, material handling training Cranes & other lifting equipment checklist

    MS-office, PowerPoint, Power-Bi, AutoCAD, SAP Module, MSP

Previous employers

  • Larsen & Toubro
  • Gannon Dunkerley co. Ltd
  • JMC projects Ltd
  • Mott- MacDonald Pvt Ltd ( Design & Consulting PMC)

Industrial construction experience

Heavy Industrial construction including buildings (Green & brown field projects) such as Power plants, Chemical, Fertilizer, Refinery, Water treatment plant (ETP & STP), Specialization in precast technology works including erection, all type piling works, Rotary & static equipment foundation, PEB, Ware houses, Chimney & Silos works, MCC rooms, ESP, Bunker & Boilers, Turbine Building, Distillation columns, all kind of vessels foundations, ITF area, Underground & Overhead tanks, town ships, R&D labs, Cooler EOT cranes, Electrical works which are need to collaborate with projects, Full project execution from Demarcation site development to Handover to process team. All knowledge of OHSE policy.

PEB,MS steel structure experience

Full knowledge of PEB & MS Steel structure fabrication & Erection. Civil front can ready as per equipment delivery. It's very important to customize project Budget & timing. Also have knowing drawings standard as per required chemical, Energy & Power sector construction behalf on past executed Mott-MacDonald designs (PMC & Design field UK based). Expert in contractor comparison & bidding for project cost customize. Various types of experience like EPC, PMC & client side also with very reputed organizations and executed milestone projects.

Estimation tendering skills

Tender, Estimation, Rate analysis of all local areas, Negotiation skills, numerous items related industrial construction are mentioned in BOQ. RFQ rise, Non- tender Item claim procedure, contractor finalize. Expert in purchase order and BOQ making. Project handles 120 Cr. to 360 Cr. Civil work cost (only civil work PO value). Able to mobilize civil & full project team. FIdIC Theory knowledge, Budget & Timeline.

Quality & Monitoring skills

Every day quality checking of site work and performing inspection of the project materials/components. Site test and lab test all type tests as per mention with project contract documents. Prepare QAP & ITP. All tests of minerals fine & coarse aggregate, SWC & CBR value, all type testing of piling. NDT Test. Pre-concrete & Post concrete inspection, Fit up reports, WPS, welding reports in steel fabrication, Knowledge of IS codes and Mott Macdonald- industrial standards. NCR- Non-Compliance Reports.

Extra skills

Steel structural fabrication, slip from works for clarification & thickener tanks, sedimentation tanks, silos, chimneys, Knowledge of site selection, crane position & lifting plan for erection. Concrete precast erection at height.

Last organization

Nu-Vu Corain Pvt Ltd ( Contractual  automation plant of chillers and plastic auxiliary equipments) March-22 to Fab 2024

2nd project - Exepede development & research centre ( Chemical Plant)

Projects in last organization

  • Nu vu Corain Pvt ltd- Automation plant - ( Group industries of Corain group of industries USA based) it was a contractual based assignment. Working as a project Manager for new green field plant of Acitonitrite Navagav, Bareja at Ahmedabad. Its product of drug intermediate, Rubber production use. insecticide Responsible for full project Civil & PEB. Interiors, EOT and JIB cranes installation, HOISTs, Lifts, approval of Drawings, Budget making and tracking. All ware houses and production buildings sheds, Existing STP & ETP repairing.
  • Exepede development & Research center Pvt Ltd - Chemical production Acetonitrile. (Group industries of Jindal worldwide ltd) March 2022-April-2023 10.5 MW CPP project Unit-II- Civil head - TG building, Boiler, coal Hopper, belt conveyors & Chimney, ESP, water treatment plant.

Previous employer

Mott Macdonald Private Limited. July 2016 to March 2022. (5 years 9 months)

Projects in previous employres

  • SRF-( R-22, CMS-2 & PTFE facility Plant. Shriram Foundation group) Dahej- Bharuch. Purpose of Plant-Manufacturing unit for Chloromethane and florin gas, Drug intermediates etc. Involved in construction as lead project manager of CMS2 project Main production building, H2SO4, Cooling tower, Reactors foundations, Distillation column foundations, Pipe rack, Methanol tanks, HCL Tank farm, Storage cell, WTP Plant. MCC building, transformer, Filling station, chlorine toner shed, MTF and C-1 tank farm, MCC building, ITF, Vessel foundation, yard rack with piping, inside road of plant etc. With designs team coordination, tender finalization, billing, and motoring of full plant.
  • 15 MW CPP Plant including ZLD/ STP-Hindalco Industries Limited. (Unit of Gold & Copper refinery- copper plate & hollow tubes manufacturing unit) Dahej. Total 1250 piles foundation, MCC Room, TG Building, ESP foundation, ID & FD fans, Cooling tower, Chimney, boiler, RO plant, Clarifier Circular tank, Sludge tanks, with ZLD project.
  • Indofill Industries limited. Unit-3, Bharuch, Gujarat. Fertilizer Plant Unit-III, GDIC, Dahej. Cap-95 K MTPA SPCD and Mancozeb Zineb) plant, solid and liquid base production plant with all amenities related with plant., Reactors, Vaporization, condensers, scrubbers, granulation drums, prilling. MCC and control room, Responsibilities: Involve work as quality Sr. Engineer with my client's plant inspected all civil work according to designs and quality parameters level of Mott Macdonald & relevant ISI codes. All execution & quality tests relevant to civil construction as per quality inspection test plan. Billing checking also maintains drawing standard work.

Previouse employer2

JMC PROJECTS INDIA LIMITED (1 year 5 months): Fab. 2015 to June 2016

Projectsinpreviousemployer2

RIL- J3 Project -Involve in fabrication & erection of Pile pier, Plate Girder,2 KM Pipe rack & flare cod area & over bridges of steel structure with planning & Execution. Maintain steel records & drawing dates. Total Erection quantity 2600 MT. Precast building cooling tower CT-1 & P4 Pipe rack.

Previousemployer3

GANNON DUNKERLEY COMPANY LTD. (2 years 8 Months) May 2012 to Jan 2015

Projectsinpreviousemployer3

Nirmax Cement Limited Pali Dist. (Unit of Nirma Industries with 3K MTPA) Involve in Civil construction site work as senior engineer fabrication & erection of steel structural (6500 MT) with planning and billing. Maintain steel records & drawing dates. Equipment billing for bucket elevators, rotary equipment and static equipment like Raw & Coal Mill foundations.

Previousemployer4

LARSEN & TOUBRO LIMITED ECC, B&F Delhi- November 2010 to April 2012

Projectsinpreviousemployer4

  • Wonder Cement limited Chittorgarh (Rajasthan) Involve in construction quality work of 1X40 MW Captive power plant with design of Fitchner.TG building, Cable seller room, control room, and 125 Meter height chimney construction with spiral staircase by slip form. 400 meters pipe rack main plant to CPP area.

Previousemployer5

Umesh Construction Company. (2 years job Resume my study 2007 to 2010)

Projects in previous employer5


  • 80 MW CPP at Zawar Mines for TATA PROJECTS LTD & H Z L (Vedanta group). Power sector: - Turbine Generator Building, TG Deck Slab & Raft, Boiler, Bunker, ESP, Raw Water Tank (100X60 Meter), Chimney Raft, Fly Ash Silo, Cooling Tower, WTP & Raw Water & Fire Fighting System, ESP, Control Room Building. 132 KV Switch Yard, etc.

Personal Information

  • Expected Salary: As per industries norms Depend location & company level.
  • Father's Name: Late.Arvind kumar
  • Notice Period: Immediate joiner
  • Date of Birth: 07/20/82
  • Marital Status: Married

Projects

1X80 MW Power Project HZL 1X40 MW CPP Wonder Cement LTD Nirmax Cement LTD 1X12.5 MW CPP at Birla White Cement Reliance Jamnagar J-3 Project Indo-fill Unit-3 Birla Copper Limited Extension unit SRF CMS-2 & PTFE (Chemical) 3 power plants 3 chemical 1 fertilizer plant & Refinery project

Disclaimer

I hereby declare that the above written particulars are true to the best of my knowledge belief.

Software

MSP

Languages

English
Intermediate (B1)

Interests

Travel adventure, cooking, Music, arts

Timeline

BE in Civil Engineering - Civil Engineering

Sant Gadge Baba Amravati University
08.2007 - 10.2010

Polytechnic Dip in Civil Engineering - Civil Engineering

Technical Board of Jodhpur
07.2002 - 06.2005

Senior Secondary Education- PCM

Ajmer Education Board
04.2001 - 04.2000

High School -

Ajmer Education Board
07.1996 - 04.1997
Yogesh JhaCivil & Structure- Industrial projects