Summary
Overview
Work History
Education
Skills
Certification
Languages
Roles And Responsibilities
Personal Information
Work Availability
Accomplishments
Work Preference
Software
Interests
Affiliations
Timeline
Generic
A VENKATA SUBRAMANYAM

A VENKATA SUBRAMANYAM

Vontimmitta

Summary

21 years of experience in Quality Assurance/Control of various projects like High raised residential, commercial building in MIVAN shuttering and Conventional shuttering. Experience in Real Estate,TNHB, Railway project buildings, Power plant buildings.

Overview

22
22
years of professional experience
1
1
Certification

Work History

Sr. AGM QAQC Lead @ Head

M/s.Colliers International (India) Property services Pvt Ltd.
12.2023 - Current
  • Project:- Construction of Radiant Institute of Technology (RIT) Jeddipally, FAIR FINISHED Structures with Doka Shuttering 05 Residential Blocks, Academic Block, Auditorium, Training Center, Kitchen and Dining Hall, STP etc……… (G+4) Multi Storied Institutional Buildings with Doka shuttering
  • The fair-faced concrete produced with the fair-faced concrete form work construction technology can be formed at a time and is not decorated externally at all, the natural color of concrete is directly adopted as the decorating color, and it is required that beam columns and plates are flat and smooth in surface like Glassy fillings
  • Fair-faced concrete, or decorative concrete, is mixed with aesthetic beauty in mind
  • It's often smoother and lighter than traditional concrete mixes
  • This ensures that the natural beauty of concrete can shine through
  • It doesn't need veneers or paint

QAQC Lead @ AGM

M/s. TATA Projects Ltd.
06.2019 - 12.2023
  • Project :- Handling Present 2 Projects @ Quality Control services Tata serein:- 1,@ Mumbai 04 towers G+29/31 with Mivan shuttering, Residential high raised housing project is located at West Thane, Mumbai
  • As a QAQC Head

QA/QC Head @AGM

M/s. Janapriya Engineers and syndicates Pvt Ltd
01.2017 - 05.2019
  • Project: Residential building 2Basements+ G + 10 Floors Sitara A1 Towers in Sanikpuri, Hyderabad.Construction of Concrete shear wall Technology PERI Form work system (Germany Technology)
  • Construction of Orchids classic Apartments Block-1 Block 2A,Block 2B Structure and Finishing works.To the Total shear wall concrete structures, Structure and Finishing works in Moti Nagar, ERRAGADA, Hyderabad

QA/QC Head AGM

M/s. Indu Projects Limited
11.2012 - 12.2016
  • Project: Construction of 1016 residential flats High Raise Apartments B+G+20, 9 Towers (TNHB) Chennai
  • Structure and Finishing works
  • All BOP Civil buildings, cement roads, BT Roads Reservoir pipeline work, (ETP)water treatment plant works, fore bay channel works, pump house drains
  • Construction of RTPP(1X600MW), at Kadapa, AP

Dy. Project Manager QA/QC

M/s. High Raised buildings ECCI LTD
07.2010 - 11.2012
  • Project: Construction of MADHUCON HEIGHTS HIGH RAISE BUILDING- 3 Basements+G+22 Floors
  • Structure works DOKA Shuttering (L & T Shuttering)

Sr. Engineer QA/QC

M/s. IVRCL Infrastructures and Projects ltd
06.2003 - 07.2010
  • Project: Construction of Railway Quarters SECR Package - 1 & 2, Type 1 & Type 2 Officers Residential Individual Houses, Villas and including Club House
  • Structure and Finishing works
  • Railway GM SECR Zonal- GM ADMIN- multistorey Building total G+6, ABCD - Blocks
  • Railway town ship package Structure and Finishing works for Officer quarters, staff quarters, club house
  • Golf course
  • STP 0.5 Mld x 3nos SEWER LINE WORKS

Education

B.Tech. -

Skills

  • MS Office
  • Computer skills

Certification

  • ISO 9001 QMS Lead auditor & IRCA Certified
  • Member of The Institution of Engineer’s (India)
  • National Institute of Construction and Research - NICMAR

Languages

English
Hindi
Telugu
Tamil

Roles And Responsibilities

  • Develop and Implement Quality Management Systems
  • Quality Control and Assurance
  • Root Cause Analysis and Corrective Actions
  • Continuous Improvement
  • Quality Training and Development
  • Quality Metrics and Reporting
  • Regulatory Compliance
  • Cross-functional Collaboration

Personal Information

  • Father's Name: A Anjaneyulu
  • Date of Birth: 06/01/82
  • Marital Status: Married

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Accomplishments

  • Achieved [Result] by completing [Task] with accuracy and efficiency. yes
  • Supervised team of [Number] staff members.100
  • Used Microsoft Excel to develop inventory tracking spreadsheets.yes
  • Achieved [Result] through effectively helping with [Task].Management
  • Collaborated with team of [Number] in the development of [Project name].QMS
  • Documented and resolved [Issue] which led to [Results].As per ISO Standards.
  • Achieved [Result] by introducing [Software] for [Type] tasks.MS Office.
  • Resolved product issue through consumer testing.Yes

Work Preference

Work Type

Full Time

Location Preference

On-Site

Important To Me

Company CultureFlexible work hours

Software

MS offIce,

Interests

Construction

Affiliations

  • ISO 9001-2015 & Institution of Engineers India@ Member

Timeline

Sr. AGM QAQC Lead @ Head

M/s.Colliers International (India) Property services Pvt Ltd.
12.2023 - Current

QAQC Lead @ AGM

M/s. TATA Projects Ltd.
06.2019 - 12.2023

QA/QC Head @AGM

M/s. Janapriya Engineers and syndicates Pvt Ltd
01.2017 - 05.2019

QA/QC Head AGM

M/s. Indu Projects Limited
11.2012 - 12.2016

Dy. Project Manager QA/QC

M/s. High Raised buildings ECCI LTD
07.2010 - 11.2012

Sr. Engineer QA/QC

M/s. IVRCL Infrastructures and Projects ltd
06.2003 - 07.2010

B.Tech. -

A VENKATA SUBRAMANYAM