AAMIR HASAN

AAMIR HASAN

Angul

Summary

Experience Engineer with demonstrated history of working 6 years in coal gasification plant of Sulfur Recovery Unit(SRU)/Amine Treating Unit(ATU)/ Tail Gas Treatment Unit (TGTU)/Sour Water Stripper Unit (SWSU) and RECTISOL Unit. Strong Engineering Professional with focused in Chemical Engineering from BIT SINDRI. Currently Working in Coal Gasification Plant as Assistant Manager Since 30th June 2018, A diligent professional with 5.11 years of experience in Panel officer, Production Engineer and Shift In-charge in above Unit.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Assistant Manager Coal Gasification Plant

JSP
10.2019 - Current
  • Capable of smooth startup and smooth shutdown of Plant without zero LTI.
  • Safe startup and safe Operation of Aqui-sulf Section by ensuring H2S Concentration is below 2ppm.
  • Troubleshooting of Oxy-clause Reactor e.g Abnormal Pressure increase , established free draining of produced sulfur from sulfur seal-pot.
  • Plugging of claus catalysts e:g AL2O3 and TIO2 or sulfur separators demister with solid particles.
  • Capable of managing entire production operations with key focus on top line & bottom-line profitability by ensuring optimal utilization of resources through DCS.
  • Safe startup and shutdown of Incinerator and its associates e:g air blower .
  • Capable of managing troubleshooting in operation e:g Flooding, weeping, foaming, high discharge pressure of Compressor and high pressure in Claus reactor.
  • Catalyst Loading and unloading from Claus and Hydrogenation Reactor.
  • Capable of planning shutdown of plant and how to handover Heat Exchanger and Column to Maintenance department
  • Monitoring process parameter and equipment/machinery performance and taking corrective action as required
  • Operating DCS of Plant with all environmental norms e:g Sox, NOx and Stripped water must be in range
  • Calculating Selectivity of claus Reactor and percentage of conversion.
  • Maintains concentration of MDEA Solvent 30wt% by avoiding degradation and foaming.
  • Formation of Sox and unconverted H2S treated in TGT unit where remaining 5% Unconverted H2S get converted into Molten Sulfur.
  • Proper coordination with field Engineer, Field coordinator ,Shift In charge, Instrumentation, Electrical and Mechanical team.

GET Coal Gasification Plant

JSP
06.2018 - 09.2019
  • I started professional career after successfully completion of Chemical Engineering on 30th June 2018 in Coal Gasification Plant of JINDALl Steel& Power
  • First one year worked as Field Engineer where learnt plant operations startup , shutdown and abnormal behavior of unit operation e:g: Flooding, Weeping, decommissioning of Heat Exchanger, Absorption Column, Distillation column, all types of control valves ,centrifugal pump , Centrifugal compressor and sample collection from sample cooler.

Education

BTECH - Chemical Engineering

BIT SINDRI
Dhanbad, JH
06.2018

Higher Secondary Examination - Intermediate of Science

KRMMV Inter College
Giridih ,JH
07.2012

Secondary Examination - General

Giridih High School
Giridih, JH
08.2009

Skills

  • Sulfur Recovery Unit (SRU)
  • Amine Treating Unit (ATU)
  • Acid Gas Enrichment Unit (AGE)
  • Tail Gas Treating Unit(TGTU)
  • Sour Water Stripping Unit (SWSU)
  • RECTISOL/UNISOL Unit

Safety Trainings

Road Safety • Electrical Safety • Lock out Tagout(LOTO) • Work at height • Confined space entry • First aid • Permit to work

Accomplishments

  • Decrease the Load of ETP Plant by 45% by designing Reboiler for Stripping Column instead of Live LP Steam
  • Raise the Revenue of Syn Gas by 50000INR per day by giving MOC for using Flash gas instead of Syn Gas as a Fuel in Sulfur Recovery Unit
  • Giving MOC for caustic dosing Pump for preventing fouling in Reboiler

Languages

English
Upper Intermediate
Hindi
Advanced

Certification

IOCL BARAUNI, 2017, Summer training in CDU and VDU unit from IOCL Barauni, AVU-1, AVU-II


Timeline

Assistant Manager Coal Gasification Plant

JSP
10.2019 - Current

GET Coal Gasification Plant

JSP
06.2018 - 09.2019

BTECH - Chemical Engineering

BIT SINDRI

Higher Secondary Examination - Intermediate of Science

KRMMV Inter College

Secondary Examination - General

Giridih High School

IOCL BARAUNI, 2017, Summer training in CDU and VDU unit from IOCL Barauni, AVU-1, AVU-II