Forward-thinking professional with a proven history of leadership, planning, and problem solving. Adept collaboration with professional to accomplish demanding objectives, motivate staff & organize resources. Systematic understanding of maintaining coverage for all operational needs.
Overview
10
10
years of professional experience
3
3
Certifications
Work History
Assistant Manager
Kintech Green Urja Pvt Ltd
Ahmedabad
10.2024 - Current
Led end-to-end execution of a 5 GW greenfield plant, achieving on-schedule commissioning through disciplined infrastructure and resource planning.
Set up & ramped 1 GW cylindrical & prismatic production lines, meeting 100% operational and quality readiness targets.
Implemented plant-wide safety systems, achieving zero major incidents & full OSHA/ISO compliance.
Improved equipment uptime & reliability via IATF/ISO-driven maintenance systems & performance tracking.
Reduced maintenance downtime & costs by optimizing spare parts inventory & critical-spares availability.
Ensured >99% availability of utility systems & 100% statutory compliance through timely calibration & audits.
Assistant Manager
Replus engitech Pvt. Ltd.
Shirwal
04.2023 - 10.2024
Executed end-to-end project management and site execution, coordinating suppliers, vendors & consultants to meet installation and commissioning milestones.
Drove root cause and breakdown analysis using RCA, Fishbone, Kaizen & yield analysis, improving line yield & reduced repeat failures.
Built & sustained a shop-floor safety culture, implementing safety norms & SOPs to achieve 0 major incidents and 100% compliance.
Resolved complex line integration and traceability issues, implementing & optimizing Cognex and Keyence vision systems for scanning & polarity verification, achieving 100% traceability accuracy.
Monitored & controlled IATF documentation & KPIs, including MTTR, MTBF, MIS, spare management, machine installation reports, and skill matrices to drive reliability improvement.
Senior Manager
Esmito Solutions Pvt Ltd
Mumbai
06.2022 - 04.2023
Owned end-to-end maintenance responsibility for 2 production lines achieving line uptime through structured preventive & breakdown maintenance.
Coordinated with OEMs and international vendors to resolve critical breakdowns with minimizing production losses & downtime.
Reduced MTTR through team skill upgradation, critical spare readiness & standardized troubleshooting procedures.
Increased MTBF by eliminating chronic failures using Kaizen & reliability improvement initiatives.
Senior Engineer
Kabra Extrusion technik Ltd (Battrixx division)
Chakan
12.2020 - 06.2022
Oversaw installation and maintenance of 5 cylindrical Li-ion battery production lines, ensuring continuous production and high equipment reliability through proactive maintenance practices.
Strengthened equipment reliability by lowering MTTR and boosting MTBF through Kaizen-driven improvements, technical training, and critical spare-part planning.
Coordinated shop-floor operations and led a team of technicians, driving operational excellence through training, PM adherence & efficient shift management.
Prepared and maintained IATF-compliant documentation (daily/PM check sheets, history cards, MTTR/MTBF, MIS reports, spare management, machine installation records), driving process standardization & continuous improvement.
Coordinated with German and Chinese OEMs/vendors for machine installation, troubleshooting, line integration, and spare-part management, minimizing downtime and production losses.
Maintained ISO/IATF-compliant maintenance documentation (daily logbooks, PM checklists, history cards, MTTR, MTBF) to support audits & process improvement.