Summary
Overview
Work History
Education
Skills
Experience In Present Organization
Accomplishments
Languages
Skills, Interests& Achievements
Earlier Expertise and Implementation in current working:
Earlier Projects
Currently Working on Following BAYA Company Projects (Catapult Realty)
Date of Birth and Age
 Certification:
Timeline
Generic
ABHISHEK KINJALE

ABHISHEK KINJALE

Thane

Summary

Dedicated and focused Project Management Specialist with over 14 years of experience excelling at prioritizing, completing multiple tasks simultaneously and following through to achieve project goals. Flexible, detail-oriented and adaptive team player with expertise in equipment operation, staff training and development, customer service and process improvements.

Overview

Work History

Design Engineer

DR. KELKAR DESIGN Pvt. Ltd. & Mr. Rajan Tipnis (Structural consultant)

Duty Manager (Civil)

Cushman & Wakefield Pvt. Ltd. For Reliance Industries Pvt. Ltd.

Project Co-ordinator

M/s Spark Builders & Infra projects Pvt. Ltd. (SPARK GROUP)

Project Co-ordinator

Nahar Excalibur Project Pvt. Ltd. (NAHAR Group/Projects)

Project Manager

The Baya Company

Education

B.E(civil) -

Datta Meghe College of Engineering, Airoli
2010-01

H.S.C -

B.E.S.Jr.College of Com. & Sci., Bhandup (E.)
2006-01

S.S.C -

W.M.M.V. Mulund (E.)
2004-01

Skills

  • Design Verification
  • Technical Support
  • Cost Control
  • Risk Management
  • Work flow planning
  • Logistics Management
  • Resource Allocation
  • Inventory Control
  • Root Cause Analysis
  • Project development
  • Project tracking
  • Project Management
  • Systems implementation
  • Vendor Sourcing
  • Contract Management
  • Project Planning
  • Schedule Management
  • Budget Preparation
  • Building codes and regulations
  • Project Closure
  • Project Coordination

Experience In Present Organization

Overall leadership of The BAYA Company team & ensuring all team members has clarity of their responsibilities & they work in cohesion. Preparation of meeting agenda for Contractor meetings (at least 2 days prior of meeting) & issuing meeting minutes (within 1 day post meeting) Review, comment, clarify on draft GFCs from Consultant Team in coordination with Contractor Team has correct drawings including numbers, versions Ensure Contractors are updating as-built drawings as per site progress & document them on NEPPL drawing set Ensuring Contractor drawing queries shall be closed with an appropriate RFI’s Maintain the Drawing/RFI Log in coordination with Project Engineers/supervisors & PMC Internal expert on Design, Drawings & Documentation Participation & key inputs in all key Design, Engineering, Contractual, Procurement, Billing, Contractor Coordination meetings Coordination with Legal, Architectural, BMC, Structural, Consultants etc. complete for getting approvals Steel Alteration, Column opening, Fibre wrapping, Various Steel/Concrete Test, Third party testing Work commence intimation/completion, Checklist & Certification of work as per contract Site Logistic movement, Tower crane and Passenger hoist installation/Demobilization Implementation of Alu formwork and execution.  

Accomplishments

    1. Gaining knowledge from different technical and social activities. Secured 26th Rank in Mumbai University (BE Civil 2010 batch).

    2. Worked with Director/ Founder of Spark group “Sh. Dattaji Desai Sir “( Ex. Deputy Municipal Commissioner)

    3. Completed more than 10,00,000 Sqft BUA and Total 12 projects completed with an Occupation certificates

Languages

Marathi
First Language
Hindi
Proficient (C2)
C2
English
Proficient (C2)
C2

Skills, Interests& Achievements

  • Driving, Collection of Sea-shells & Trekking, Marathi, Hindi & English, Gaining knowledge from different technical and social activities.
  • Secured 26th Rank in Mumbai University (BE Civil 2010 batch). Worked with Director/ Founder of Spark group Sh. Dattaji Desai Sir (Ex. Deputy Municipal Commissioner).
  • Completed more than 10,00,000 Sqft BUA and Total 12 projects completed with an Occupation certificates,
  • knowledge of MS-Office, C, C ++, ETAB, SAFE, PLANWIN, FRAMEWIN, Auto-CAD and STAAD-PRO

Earlier Expertise and Implementation in current working:

Site Coordination Joint Site visits with Architects, MEP Consultants & Structural Consultants. Reviewing Daily Site Progress Reports and highlighting critical issues if any. Coordinating Project progress review meeting with Site engineers, supervisors & Contractors. Reviewing master program for project execution with the help of architectural & structural drawings. Coordinating with Consultants / vendors for design development, drawing requirements, survey etc. Joint Meeting with Redevelopment project under (SRA 33/10, DCR(33/7) & 33/9) society members for sorting out various issues like amenities, Quality etc. Reviewing of look-ahead program to find out and highlight the recent requirements for project and forwarding the same to the concerned Authorities such as requirement for any consultant / vendor appointment, material purchase, approval required etc. Making of Project Feasibility report incl. costing preparation by taking care of all construction activity & liaising activity as per final architectural drawings. Making Budgetary expenses before starting any construction activity. Making a monthly targets & Schedules as per quality standards. Checking of GFC drawing before issuing on site also regular checking of the same on site. Departmental Coordination Meeting with Liasioning department for status of High rise NOC, MHADA NOC, Aviation, survey remarks, Tree Department, Traffic NOC, SWD, SP P & D, CFO NOC, IOD, CC, OC, MGL,BEST etc. Attending various review meeting viz. Budget, quality & safety. Interlinking their status with the management objective and project completion and highlighting the same to them. Coordinating with Consultants / vendors for design development, drawing requirements, survey etc. during the Pre-construction, On-going and post construction stages. Giving directives to put together the required information for launch, marketing, sales and execution. Attending meeting with architects for planning as view of end users, with Structural consultants for minimizing steel consumption wherever needed, with MEP Consultants/Contractors for reducing future maintenances of end users, with third party quality auditors for gradation of building by adopting green features & finishing beauty of projects. Design Coordination of Post tensioning slabs, Beams & their uses in Residential project for achieving quality product to end users. Coordination for car parking systems such as Car lifts, Puzzle, Stack, Slider etc. Coordination with Liaising architects and Staff for getting Commencement certificate & Occupation certificate compliances Meeting with tenants for their Key Handover Process through MHADA Coordination for BEST Electrical Liaising, Substation Commissioning, Alternate Supply, Meter Installation etc. complete Supplementary Agreement Registration, Society Registration, Rent analysis, Amenity/Finishing Finalization Coordination with MGL for PNG connection enrooting underground pipe laying from road to existing building.

Earlier Projects

1. DR. KELKAR DESIGN Pvt. Ltd.

Residential Buildings-

· Tata Housing residential-‘A’ wing (Basement+G+10) building at Talegaon, pune.

· Aarke Rehab project for ‘Pragtej builder’ (G+10) at Wadala, Mumbai.

· MIG-2 for ‘Kalptaru ‘(Two Basements+stilt+podium+20) at Bandra, Mumbai.

· SPARTA tower (G+15) building at Thane.

· Cosmos Empress (G+16) building at Thane.

· Clubhouse (G+2) at Mulund (E.)

Commercial Buildings-

· Dol Motors Pvt. Ltd., Rabale navi Mumbai.

· IT Park (2 basement+G+8) Storeyed at Thane.

· Sai-Radha Commercial (2 basement+G+15) at Bhandup.

· Vidya Prasarak Mandal College at Ratnagiri.

· Also have knowledge of ‘SITE Inspection’ at Shrishti for Kalpataru (G+14) Mira road, Sale and tenants building at Prabhadevi, K Raheja Infocity industrial complex at Navi Mumbai, Rajesh Jaggi House at Khandala for Peninsula land Ltd. For the interest of work

2. Cushman & Wakefield at Reliance industries-

· Worked on Construction of G+11 Commercial Tower for Reliance 4G and Reliance Telecomm Projects

· Experienced in Civil, Painting, Glass, Roller Blinds, Plumbing & Carpentry Services.

· Have SAP (Admin) Knowledge for making “Annual Rate/Material contract” of services listed above.

· Site set-up and Day to Day working, Quantity Surveying, material procurement

· Site Supervision, checking and maintaining Quality & speed of Construction work on site.

· Checking Measurements and R.A. bills etc.

· Preparation of Bar chart & Guideline to start new site.

· Co-ordination with Clients & consultants, Labour Management.

3. Spark Group-

Completed following Residential Buildings-

· Munjoba CHS rehab (G+20) and Desai Oceanic Sale tower (G+ pit/Podium puzzle Parking+16 floor)at Princess street, Marinline under DCR 33/7

· Kachkarkhana CHS, G. D Ambekar Road, Wadala- Rehab tower 2 wings viz. G+6 & G+20 and sale building (G+ pit/Podium puzzle Parking+16 floor) under DCR 33/7

· Shree Sai Siddhi SRA CHS, Worli Belani Nagar- Rehab (G+11) 175 Flat holders+ 40 Shopkeepers under SRA Scheme 33/10

· Worli Belani Nagar BEST Depot in between Rehab & Sale Tower Including Plot Substation

· Desai Oceanic (Sale Building-G+12)- Post Tensioning slab Residential tower with 4 level puzzle parking completely floating structure

· Mogra Vikas, Andheri pumphouse (Basement+G+12) under Society redevelopment scheme

· Madhusudan(G+9), Laxmisadan (G+6) at vileparle under Society Redevelopment Scheme

· Jyoti Palace, Ghatkopar (2 level basement+G+12) under private property redevelopment

· Besides this worked on MCGM Market Redevelopment and Mulund SRA Scheme in Joint Venture.

4. Nahar Group-

Project Completed (3 Premium residential tower) with an Occupation certificate  and worked on other Residential Commercial Projects

· Sale Building Known as “EXCALIBUR”-Basement+ Ground+ 5 Level Podium+ 20 Upper residential Floors (ht. 117.60mtr) 34 Exclusive luxurious bear shell flats

· Rehab-1 Building- Service Basement+ Ground+ 23 Upper residential Floors (ht. 69.95mtr) 91 Flats including finishing

· Rehab-2 Building- Service Basement+ Ground+ 23 Upper residential Floors (ht. 69.95mtr) 112 Flats including finishing

· Tardeo Birla Property Redevelopment- It consist of two CTS No. 318 & 319 having plot area 4082.80Sqmt. known as Akhil Bharat Bhawan

Scope:- Feasibility Working, Site management, Existing Structure demolition, Area Survey and Demarcation.

· Sector R23 & 24 Development- It consist of two CTS No. 34 & 36 having plot area 4852.50Sqmt. known as Nahar Amrut Shakti, Chandivali

Scope:- Working on IOD Conditions, Feasibility Working for residential cum commercial mix use, Site setup management, Area Survey and Demarcation.

· Oshiwara (Nahar Commercial Plaza Pvt. Ltd.)- Standalone MCGM market building renovation and Facelift of Existing structure

Scope:- Office areas Alterations/Modifications, Fire Fighting System installation, MEP system and Lift work alterations as per approved BMC concession planning.

Currently Working on Following BAYA Company Projects (Catapult Realty)

· BAYA Midtown, Dadar West- (33/7 & 33/10 Development) Rehab Tower G+23 storied 82,500Sqft and Sale Tower G+23 Storied 1 lac Sqft

· BAYA Central, Lower Parel- (Composite 33/7 Development) rehab G+22 Storied 1.1lac Sqft & Sale Building G+3 level Podium+20 storied 1.35lac Sqft

· BAYA Sunrise, Dadar East -(33/9 Cluster Development) rehab G+23 Storied 2 wings 1.1lac Sqft & Sale Building G+41 storied 2.5 lac sqft

· Mohite Patil Nagar SRA Development at Mankhurd Rehab Building G+23 storied 10Lac sqft and sale building G+ 23 Storied 22Lac Sqft

· Gaodevi Marol SRA Development

· Shastri Nagar Wadala SRA Development

DevelopmentByculla 33/7 Developement

Date of Birth and Age

  • 06th Aug 1989. (AGE- 34Yrs.)

 Certification:

I, the undersigned certify that to the best of my knowledge & belief, this CV is correctly described.

(Abhishek D. Kinjale)

Timeline

Design Engineer

DR. KELKAR DESIGN Pvt. Ltd. & Mr. Rajan Tipnis (Structural consultant)

Duty Manager (Civil)

Cushman & Wakefield Pvt. Ltd. For Reliance Industries Pvt. Ltd.

Project Co-ordinator

M/s Spark Builders & Infra projects Pvt. Ltd. (SPARK GROUP)

Project Co-ordinator

Nahar Excalibur Project Pvt. Ltd. (NAHAR Group/Projects)

Project Manager

The Baya Company

B.E(civil) -

Datta Meghe College of Engineering, Airoli

H.S.C -

B.E.S.Jr.College of Com. & Sci., Bhandup (E.)

S.S.C -

W.M.M.V. Mulund (E.)
ABHISHEK KINJALE