Summary
Overview
Work History
Education
Skills
Timeline
Generic

ADARSH ABISHEK

PATNA

Summary

  • Goal-oriented ,Forward-thinking when reviewing project requirements to determine precise solutions. Composed professional when working under tight schedules and limited budgets to achieve innovative designs meeting and exceeding objectives.
  • Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
  • Hardworking and reliable with strong ability Highly organized, proactive and punctual with team-oriented mentality.

Overview

2
2
years of professional experience

Work History

TRACK ENGINEER

AECOM ASIA COMPANY LIMITED
RANCHI
07.2021 - Current
  • Stacking the ballast in railway’s depot and formation cess as required to the project.
  • Testing the ballast as per IRS-GE-1 i.e. aggregate impact value abrasion and water absorption test.
  • Pre welding inspection, preparation of rail joints before welding, the general procedure of welding, Execution of welding and finishing of welded rail joints and acceptance test to ensure quality control.
  • Keeping the record of welds, checking the finishing of welded rail joints by visual inspection. Fusion welding of rails by Alumino-thermate process, preparation of rail joint for AT welding.
  • Welded rail joints test to be like USFD(Ultrasonic Flaw Detection), parameter check of welded rail joints
  • Replacing the old sleeper by trough sleeper renewal and old rail by trough rail renewal & deep screening work.
  • Carried out the marking of points and X-ing as per ESP and laying the track.
  • Placing the Fanshaped turn out assembly as per RDSO drawing and their related fittings.
  • Keeping the record of materials i.e. purchased by RVNL as well as supplied by contractor.
  • Laying of 60 KG and 52 KG switch expansion joints (SEJ) as required in yard and block section.
  • Laying of DS (Derailing switch) as required in loop lines.
  • Preparation of IPC (Interim payment certificate) for supplied items as well as installation work.
  • Construction of various type of Height gauge.
  • Responsible for day-to-day communication with site in-charge.
  • first, second, third machine packing like unimate, duomate packing work.

Education

B.TECH (CIVIL) - Civil Engineering

ICFAI UNIVERSITY
DEHRADUN
11.2019

Skills

  • Project Planning
  • Quality Assurance Control
  • Technical Reporting
  • Process Improvement
  • Project Estimation
  • Project Management
  • Inspections
  • AutoCAD
  • Client Relations

Timeline

TRACK ENGINEER

AECOM ASIA COMPANY LIMITED
07.2021 - Current

B.TECH (CIVIL) - Civil Engineering

ICFAI UNIVERSITY
ADARSH ABISHEK