Alok Chakrabarti

Alok Chakrabarti

Construction Director
Navi Mumbai

Summary

Dynamic construction professional equipped for high-stakes roles, with extensive experience in managing complex construction projects from inception to completion. Proven track record of ensuring adherence to quality standards and deadlines while cultivating a collaborative work environment. Recognized for strong leadership, adaptability, and expertise in project management and site supervision, consistently delivering innovative solutions. Eager to embrace a full-time role that challenges professional capabilities and leverages exceptional interpersonal skills, effective time management, and problem-solving acumen.

Overview

34
34
years of professional experience
4
4
Languages

Work History

Construction Director

IPS-Mehtalia Pvt. Ltd.
Mumbai
08.2023 - Current
  • As Project lead (site based) performing Project & Construction management.
  • As a PMC lead implementing of company standards, ethics, and values.
  • Project risk identification and escalation / mitigation.
  • Part of steering committee team and performing overall project control.
  • Coordination with client, IPSM-Engineering & site team and contractors.
  • Conducting of weekly / monthly meetings and reporting to top management.
  • Engineering & site clash mitigation and provide solutions to stakeholders.
  • Project planning and executing works maintaining HSE, QC & Progress.
  • Google Data Centre – 120Mw (Juinagar) – Navi Mumbai
  • Overall project & construction management for
  • G+4 Infrastructure development of Data Centre building
  • GIS – Substations, pump houses and other required utilities.
  • Steel structures, Mechanical, Firefighting, HVAC, Electrical, Instrumentation, and ELV system installations
  • Marvel - Brownfield Expansion (Mondelez-Sricity). – Andra Pradesh.
  • Overall project & construction management for
  • Chocolate manufacturing units – 14 buildings and Infrastructure development of 220 Acres of land.
  • Civil, Steel structures, Mechanical, Firefighting, HVAC, Electrical, Instrumentation, and process system installations.

Operations Manager

Enskab Construction & Trading LLC.
Manama
01.2022 - 01.2023
  • Business Development and contract negotiations.
  • Project Bidding / Estimations / Budgeting and control
  • Multi project operations and management.
  • Engineering coordination and submittal clearances.
  • Construction operations management and site execution
  • ALBA- Block 4 modifications and phase expansion. – Bahrain
  • Installation of Steel structures (1000 T).
  • In-plant piping fabrication & installation. (50,000-inch dia.).
  • BAPCO Modernization Program- Green field TTSJV – (Chilled water piping system) – Bahrain
  • Installation of Pipe supports inside plant rooms.
  • Chilled water piping fabrication & installation. (48,000-inch dia.).

Project Manager

Mabani Steel LLC.
Manama
01.2020 - 01.2022
  • Overall Project planning, execution & management.
  • Project evaluation and co-ordination with Head-office / Site team Client & Consultants.
  • Engineering coordination’s and submittals clearances.
  • Project Budgeting & cost control of site resources.
  • New Exhibition Convention Centre – Bahrain
  • Installation of Steel structures (PEB & HRS) for Commercial buildings. (10,000 Tons).
  • Super critical and tandem lifting works for modular steels of 140-meter-long cantilever canopies.

Site Manager

Arabian International Company
Jeddah
01.2014 - 01.2020
  • Overall site planning, execution & management.
  • Project evaluation and co-ordination with site team & client.
  • Budgeting & cost control of site resources.
  • Mansourah-Massarah - Gold-Project –Saudi Arabia
  • Installation of site fabricated Storage Tanks 47 nos.
  • Installation of PEB structures (2,000 Tons)
  • Emergency walkways – Line 1& 2 Riyadh Metro Line –Saudi Arabia
  • Installation of emergency walkways – 38 kms. (Steel supports, Fire pipeline, cable trays, Sound Barriers, Fencing, FRP covers)
  • Surface Stations (BACS) – Line 2 Riyadh Metro Line – Saudi Arabia
  • Installation of steel structures (2,200T) - for 6 metro stations.
  • Elevated station canopy works (FAST) - Line 4 & 6 Riyadh Metro Line – Saudi Arabia
  • Installation of canopy structure over elevated stations – for 10 metro stations. (Canopy modules – 6,000 Tons)
  • Elevated Metro Stations (ANM) - Line 3 Riyadh Metro Line – Saudi Arabia
  • Installation of steel structures (3200T) - for 8 metro stations.
  • Shuqaiq Steam Power Plant – Phase A (Power plant) – Saudi Arabia
  • Installation of Boiler, STG & BOP steel structures (51,000T) - for 4x560MW power plant.
  • Strand jacking works for boiler structures above 500T along with flue gas ducts and boiler vessels.
  • Super critical lifting and tandem lifting works for modular structural lifts through luffing jib cranes and performing inspection works through man baskets.
  • Yanbu – Phase 3 (Desalination and power plant) – Saudi Arabia
  • Pipe rack and Boiler, STG Steel Structure installations (62,000 T) – for 5x615MW power plant.
  • Modular lifting works – 500t to 750t of modules through strand jacking systems along with boiler vessels and flue ducts.
  • Preparation of lifting plans and carrying out critical lifting works of boiler structures.
  • Super critical lifting above 90 meters through tandem lifting procedures and carrying out inspections through man baskets.

Manager – Project Operations

Gage Contracting & Trading WLL.
Doha
01.2011 - 01.2014
  • Overall site execution & management.
  • Multiple site operations & management.
  • Project evaluation and co-ordination with site team, client & consultant
  • Budgeting & Contract negotiations.
  • Business Development.
  • Oil & Gas Based projects -
  • Oryx GTL MOC Projects – Ras Laffan, Qatar
  • MOC 0698 - Small Bore Piping
  • Process & Utility Piping and equipment installations.
  • MOC 0921 - Fire Water Line replacement in unit 84
  • Fire water network installation, underground and above ground Pump station equipment installations.
  • MOC 1346 - Liquid fuel line upgrade / Replacement in unit 40
  • In plant and pipe rack - pipe installations.
  • MOC 1317 - N2 piping for 130-ES-201
  • Utility& process piping’s for condensers / heat exchangers
  • MEP Based projects -
  • Rayyan Mineral Water Company – Al Rasheeda, Doha - Qatar
  • Building structures (2000T) and Utility Piping, equipment installations.
  • North Gate Mall – Doha, Qatar
  • Chilled Water pipelines &Equipment installations.
  • Structure steel works for cooling towers.
  • Musheireb (Doha Land) – Doha, Qatar
  • Chilled water pipeline & Fuel line Installation.
  • NDIA (New Doha International Airport) – Doha, Qatar
  • Airport access facility building structures (4000T)
  • Chilled Water District Cooling Network Installation. & Chiller Installation
  • Qatar University Student Housing Facility – Doha, Qatar
  • Chilled Water District Cooling Network Installation.
  • Qatar Petroleum District – Doha, Qatar
  • Equipment’s and chilled water piping for plantroom & high-rise buildings.
  • Sidra Medical & Research Centre– Doha, Qatar
  • Chilled water Piping and duct Installation.
  • Qatar Aluminum - Doha, Qatar
  • Pipe rack structures for steam and gas turbines (3500T)

Manager – Mechanical Projects

Spark Engineering Building Construction LLC.
Sharjah
01.2008 - 01.2011
  • Overall site execution & management.
  • Multiple site operation management.
  • Project evaluation and co-ordination with site team, client & consultant
  • Budgeting & Contract negotiations.
  • Coca Cola – Goblej - Ahmdabad, India
  • Factory buildings & Piperack structures (5,000T)
  • Process & Utility piping for bottling plant.
  • Qatar Museum – Doha, Qatar
  • Modular system installation for complete MEP works including cables, chilled water & other utility pipes, instrumentation tubing, HVAC ducting’s all enclosed in pre-installed pipe racks.
  • Energy City – Lusail, Qatar
  • Pre-insulated underground piping for district cooling system 15kms.
  • Emirates Aluminum (EMAL) – Abu Dhabi, UAE
  • Gas Turbine and Generator installations. - 6 nos.
  • In-plant piping for Gas Turbine & Generator.
  • Turbine building structures and Piperack installations (8000T)
  • Etihad Towers – Abu Dhabi, UAE
  • District cooling plant – Installation of main & intermediate plants with equipment and piping. High Rise building piping and interconnections.
  • Ferrari World – Abu Dhabi, UAE
  • HVAC Package installation and Ducting works.
  • CHW piping installation and plant room packages.
  • Yas Marina Circuit – Abu Dhabi, UAE
  • HVAC Package installation and Ducting works.
  • JW Marriott – Abu Dhabi, UAE
  • ETS room – Heat exchanger installation and connected piping, both external and internal.
  • Metro Railway (DURL) –Dubai, UAE
  • Cross country piping (22kms) for chilled water system. - District Cooling system
  • Jebel Ali Airport – Dubai, UAE
  • District Cooling Plant – In plant piping and equipment installation.
  • Business Bay Executive Towers – Dubai, UAE
  • District Cooling Plant – In plant piping and equipment installation
  • Jebel Ali Free Zone -2 (JAFZA) – Dubai, UAE
  • External Buried piping for chilled water system. – 10 kms. – District Cooling system.

Manager – Projects

H’reck Engineering Company Pvt. Ltd.
Muscat
03.2007 - 07.2028
  • Multiple site operations
  • Site execution and co-ordination.
  • Budgeting & Contract negotiation.
  • ENOC Refinery (IInd Phase Expansion) – Jebel Ali Port, Dubai
  • Unit building and Piperack structure installations (12000T)
  • In-plant piping in refinery expansion project. Approx. 200,000-inch dia. of piping works of various metals.
  • Installation of Storage tanks (pertaining to API 650) – 4nos.
  • Installation of heavy static equipment’s and connecting piping works.
  • Installation of process skids and connecting piping works.
  • Sohar Aluminum, (Green Anode & Liquid Pitch) – Sohar, Oman
  • Unit building and Piperack installations (3500T)
  • In-plant piping and heavy static equipment installations
  • Modular system installations and process skids installations.
  • Drinking water facility – Saham & Khabura, Oman
  • External buried piping (DI & HDPE) for drinking water facility within city of Saham & Khabura, Approx 250 kms of piping works involved with multiple pump station installation.
  • Oman Formaldehyde Plant – Sohar port, Oman
  • Unit building and Piperack installation (2000T)
  • In-plant piping and rotary equipment erection.
  • Installation of static equipment and connecting piping works.
  • Installation of process skids and connecting works
  • Daleel Petroleum – (Div. of PDO) – Daleel, Oman
  • Storage Tanks – (API 650)- 12 nos. for crude oil. Interconnecting piping of tanks for crude oil distribution.

Projects Head

Kudos Chemie Limited.
Chandigarh
07.2006 - 07.2026
  • Overall Project Planning & technical team management.
  • Co-ordination with plant operations / consultants / contractors.
  • Project Budgeting and Contract preparations & negotiations.
  • Conducting Monthly Stake holder’s meetings.
  • Preparation & submission of project delivery reports to boards.
  • Scheduling & Follow ups with procurement for project deliveries.
  • Periodic plant maintenance and follow-ups with all technical teams.
  • Preparation of plant expansion surveys for capacity buildups through design consultants.
  • Maintain plant discharge as per environment policies & pollution control laws.
  • Conduct and maintain DQ/IQ/OQ records and systems along with operations / design and construction teams.
  • Inspection of newly installed equipment’s for handing over to operations teams.
  • Arrange periodic audits through various government bodies such as civil defense / pollution boards / IBR of existing and new facilities.
  • Plant expansions / modifications and facility maintenance.
  • Modification / close-out and follow-ups to meet as per USFDA audits for caffeine production.
  • Installation of process equipment’s like heat exchangers / various reactors, pumps, agitators, centrifuges, FBD’s, Unit & process piping’s, steel structures, pipe racks, cooling towers, compressors, boilers etc.
  • Installation of sewage systems, and storm water systems.
  • Installation and maintenance of all electrical and power systems for plant.
  • Installation & maintenance of HVAC systems including ducting / piping / chillers / AHU’s / FCU’s & clean room applications.
  • Installation & maintenance of man / material login and logout systems.
  • Installation of site storage tanks.

Mechanical Engineer

Mott Macdonald
Mumbai
03.2005 - 07.2026
  • Project Management.
  • Overall site management.
  • Technical evaluations and co-ordination with design team.
  • Inspection of all facilities installed.
  • Testing and validation of facilities with operation team.
  • Bluescope Infrastructure Pvt. ltd. – Hinjewadi, Pune, India
  • Factory building structure installations (3700T).
  • Piping & Equipment installations for assembly line.
  • Mansi Wakal Drinking Water Facility – Jhadol, Udaipur, India
  • Overall, in-charge for project execution and site management
  • Co-ordination with site engineers, contractors, and design team for technical evaluation of below facilities.
  • Cross country piping for drinking water facility terminating between Mansi Wakal Dam and water reservoir at Udaipur city. 1000mm dia. MS Piping of 18 kms. laid through extreme mountains and forest. Total Elevation difference of 625 mtrs.
  • Installation of Pump room with various pumps and other ancillaries. Construction of infrastructure like pump rooms, switch yard, service roads and water bays.
  • Electrical installation of 130KVA Switch yard equipment’s and terminations. Laying of cables, panel installation and various HV & LV terminations.
  • Inspections & Testing-
  • Hydro-testing of pipeline
  • Inspection and alignment of pumps.
  • Electricals pre-installation inspections and logical checks.
  • Civil / Infrastructure works levels verifications and quality checks and verification of QC reports.
  • Pre-commissioning of total facilities.
  • Co-ordination & submitting reports to various government representatives & client for facilitating the works.

Project Engineer

B. Mehtalia Consultants Pvt. Ltd.
Mumbai
06.2004 - 06.2026
  • Co-ordination with various design teams.
  • Co-ordination with site management & clients.
  • Provide / generate drawings, design documents / reports and back-up site team.
  • Inspection of equipment’s at vendor’s facility and prepare reports before dispatch.
  • Technical evaluation of queries generated by site team.
  • Contract negotiations.
  • Sandoz, Bulk Drug Facility – Mahad, India
  • SKOL Breweries – Aurangabad, India
  • Colgate Palmolive – Haryana, India

Site Engineer

B. Mehtalia Consultants Pvt. Ltd.
Mumbai
12.1999 - 06.2026
  • Project Management and site execution
  • Inspection of installed facilities and prepare reports
  • Site co-ordination with Contractor and Client.
  • Co-ordination with design team for technical clearance.
  • Validation of installed systems.
  • Testing & pre-commissioning of systems/facilities.
  • Frito Lays – Pune, India
  • Installation of In-plant piping, Process & utility equipment’s, Pump, HVAC, & Firefighting system.
  • Fabrication & installation of 2500 tons of Steel Structure for factory building.
  • Alembic Limited (API Div.), Bulk Drug Facility – Panelav, Gujarat, India
  • Installation of In-plant piping, Process & utility equipment’s, Pumps. HVAC, BMS system & Firefighting system.
  • Piperack and unit buildings steel structures. Storage tanks for liquor ammonia – 2 nos.
  • Alembic Limited (Formulation Div.) – Panelav, Gujarat, India
  • Installation of In-plant piping, Process & utility equipment’s, Pumps. HVAC, BMS system, Firefighting system & pipe racks.
  • Flamingo Pharmaceuticals (Formulation Div.) – Taloja, Mumbai, India.
  • Installation of In-plant piping, Process & utility equipment’s, Pumps. HVAC, BMS system & Firefighting system
  • Proctor & Gamble Ltd. – Mandideep, Bhopal, India
  • Installation of In-plant piping, Pumps & Firefighting system
  • Fabrication & installation of 2500 tons of Steel Structure for factory and warehouse.

Site Engineer

Reliance Industries Limited
Jamnagar
03.1998 - 11.2026
  • Project Management & execution
  • Co-ordination with various contractors & design consultants.
  • Inspection of installed systems.
  • Preparation of site reports.
  • Testing and pre-commissioning of systems.
  • Reliance Petroleum Limited (Pipe fab shop & PRU Unit) –Motikhavdi, Gujarat, India
  • Installation of unit and Piperack steel structures (8000T)
  • Grit blasting and painting of raw pipes. Prefabrication of piping spools.
  • Installation of in-plant piping (160,000 Inch dia.).
  • Installations of storage tanks – for various petroleum products pertaining to API 650
  • Installation of Heavy static equipment’s (fractional distillation columns) weighing 1000T lifting x 100 Meter height with tandem lifting procures.
  • Installation of heavy skids and rotary equipment like pumps and gas compressors along with steam turbines.
  • Installation of various allied works like insulation & painting of piping systems etc.

Asst. Construction Engineer

Shrinivas Plates & Structures Ltd.
Chembur
03.1995 - 06.2026
  • Site execution and installation
  • Prepare site reports
  • Testing and pre-commissioning of installed systems.
  • Cochin Refinery Limited (CRL) – Ambalamugal, Kochi, India
  • Installation of Piperack structures (4000T)
  • Installation of In-plant piping and pumps for crude oil distribution.
  • Installation of storage tanks for Naphtha & crude oil. (API 650, Tank dia. 92 meters x 6 nos.).
  • Gujarat State Fertilizer Company (GSFC) – Sikka, Jamnagar, India
  • Installation of storage tanks for liq. ammonia and benzene (API 650).
  • Installation of piping for tankage interconnections.
  • Indian Oil Corporation Limited (IOCL) – Mathura, India
  • Shutdown activities including installation of in-plant piping and static equipment installation.
  • Indian Oil Corporation Limited (IOCL) – Panipat, India
  • Installation of FFC unit and pipe-rack structures (6500T).
  • Installation of in-plant piping. – 40000-inch dia.

Fabrication Engineer

Century Rayon
Kalyan
09.1994 - 09.1995
  • Manage teams involved in fabrication of tanks, vessels & equipment’s at workshop.
  • Prepare shop reports.
  • Inspection of fabricated systems as per drawing.
  • In house expansions and maintenance works.

Education

Doctor of Business Administration - Business Administration And Management

ESGCI
France
12.2028

Post Graduate Diploma - Operations Management

Welingkar Institute of Management Development & Research
Mumbai, India
08.2019

Advance Diploma - Business Management

Welingkar Institute of Management Development & Research
Mumbai, India
08.2017

Diploma in Engineering - Fabrication Technology

Bombay Technical Education
Bandra, Mumbai, India
08.1994

Skills

Decision-making

Site management

Subcontractor management

Team collaboration

Construction management

Work Planning and Prioritization

Project management

Stakeholder communication

Problem-solving

Health and safety compliance

Critical thinking

Software

Windows Office

Autocad

Tekla

Timeline

Construction Director

IPS-Mehtalia Pvt. Ltd.
08.2023 - Current

Operations Manager

Enskab Construction & Trading LLC.
01.2022 - 01.2023

Project Manager

Mabani Steel LLC.
01.2020 - 01.2022

Site Manager

Arabian International Company
01.2014 - 01.2020

Manager – Project Operations

Gage Contracting & Trading WLL.
01.2011 - 01.2014

Manager – Mechanical Projects

Spark Engineering Building Construction LLC.
01.2008 - 01.2011

Manager – Projects

H’reck Engineering Company Pvt. Ltd.
03.2007 - 07.2028

Projects Head

Kudos Chemie Limited.
07.2006 - 07.2026

Mechanical Engineer

Mott Macdonald
03.2005 - 07.2026

Project Engineer

B. Mehtalia Consultants Pvt. Ltd.
06.2004 - 06.2026

Site Engineer

B. Mehtalia Consultants Pvt. Ltd.
12.1999 - 06.2026

Site Engineer

Reliance Industries Limited
03.1998 - 11.2026

Asst. Construction Engineer

Shrinivas Plates & Structures Ltd.
03.1995 - 06.2026

Fabrication Engineer

Century Rayon
09.1994 - 09.1995

Doctor of Business Administration - Business Administration And Management

ESGCI

Post Graduate Diploma - Operations Management

Welingkar Institute of Management Development & Research

Advance Diploma - Business Management

Welingkar Institute of Management Development & Research

Diploma in Engineering - Fabrication Technology

Bombay Technical Education
Alok ChakrabartiConstruction Director