ALOK RANJAN  SAHOO

ALOK RANJAN SAHOO

CIVIL ENGINEER With 10+ Years Experience
MUMBAI

Summary

Dynamic and accomplished Civil Engineer with over 10 years of expertise in Railways, Highways, Billing, Planning, Managerial, Interface Management etc. Proven track record of successfully overseeing complex projects, ensuring efficient planning, and delivering high-quality results. Seeking a challenging role to leverage my extensive experience and contribute to the success of innovative engineering projects.

Overview

11
11
years of professional experience
7
7
years of post-secondary education
2
2
Certifications
3
3
Languages

Work History

Deputy Resident Engineer/Civil

RODIC Consultants Private Limited
Mumbai
08.2022 - Current

Client:- Mumbai Railway Vikas Corporation Ltd. (MRVCL)

Project:-Providing General Consultancy Services (GC) for MUTP III Project covering Bid Process Management and Project Management Services for Quadrupling of Virar-Dahanu Road (64 Km) on Western Railway.

ROLES AND RESPONSIBILITIES

Overall Details of Project is as follows:-

• Standard of Construction: Group ‘A’ – 25 MT Axle Load

• Design Speed : 160 KMPH

• Stations : All Existing 9 Stations. Proposed Future Stations- 8.

• Bridges : Important 2 Nos. , Major 16 Nos., Minor 66 Nos.

• Level Crossings : Existing- 10 Nos. , 8 to be Replaced by RUB & 2 by ROB

• Extension of RUBs : 8 Nos. in lieu of existing L.C. No. 44,45,46,53

• ROB : 1 No. in lieu of L.C. No. 55A Km 120/3

• Project Cost : 3570 Crore


Overall Planning, Supervision & Monitoring of Civil works i.e Bridge work, Earthwork, Buildings & Station Development etc. in 3 nos of Package:-

1. Construction of Major bridges, Minor Bridges, Drains, retaining wall,extension of Limited height Subway/RUB, Ballast supply and Earthwork in the section from Ch. 2060 to Ch. 8800 and From Ch.16800 to CH. 30000 between Virar (Excluding) and Palghar(Excluding). Cost of Pkg- INR 227.83 Crore

2. Construction of Station Buildings, Service Buildings, New Platforms, New FOBs, Staff quarters, Tower Wagon shed, extension of existing platforms, existing FOBs Bridges, Earthwork for Railway formation including associated General Electrification works and OHE works, and dismantling of existing structures at various stations in connection with Quadrupling of Virar – Dahanu Road through 3-LOTs. LOT I – All proposed structures in the section between Virar (Including) and Vaitarana (Including) Stations”. Cost of Pkg- INR 203.56 Crore

3. Construction of Station buildings, service buildings, New Platforms, New FOBs, Staff quarters, Tower wagon shed; Extension of existing platforms, existing FOBs, bridges; earthwork for Railway formation; and dismantling of existing structures at various stations in connection with Quadrupling of Virar-Dahanu Road of balance 2 LOTs. Lot-II: All proposed structures in the section between Vaitarana (Excluding)- Palghar (Including) Stations. Cost of Pkg- INR 208.42 Crore

Deputy Resident Engineer/Civil

Aarvee Associates
Kota,Rajasthan
10.2015 - 08.2022

Client:-Rail Vikas Nigam Limited (RVNL)

Project:-Project Management Consultancy for “construction of roadbed, major & minor bridges, track linking (excluding supply of rails and main line PSC sleepers), S&T, OHE, TSS & general electrical works in connection with doubling between Kota and Bina (282.576 kms in three packages) excluding Ruthiyai-Guna section on Kota and Bhopal divisions of west central railway in the state of Rajasthan and Madhya pradesh, India”

ROLES AND RESPONSIBILITIES

Role:

Overall Planning, Supervision & Monitoring of Civil works i.e Bridge work ,Earthwork, Buildings & Station Development etc. in Package-1 of Kota-Bina Doubling Project .The details of project is as under:-

Detail Estimate Project Cost: INR. 1417.74 Crore

Revised Project Cost: INR. 2476.42 Crores

Total Route Length : 282.58 Kms

Track Structure: 60 Kg,90 UTS,1660 PSC Sleeper

Traffic: Passenger & Freight

Loading Standard: 25 T Axle Load

Total Route Length(Pkg-1) : 89.00 Kms

Earthwork In Filling(Pkg-1): 9 Lacs Cum

Blanketing(Pkg-1): 2.5 Lacs Cum

Ballast Supply(Pkg-1): 2.65 Cum

Major Bridges(Pkg-1): 13 Nos

Minor Bridges(Pkg-1): 64 Nos

Stations (Pkg-1): 12 Nos.

LC gates(Pkg-1): 31 Nos

Staff Quarter(Pkg-1): 71 Units

Foot Over Bridges(Pkg-1): 6 Nos

Specific Achievement During the Tenure:-

Successful CRS inspection & Speed Trail of Baran-Salpura section (40.2 Km)in Dec- 2018 being Overall in-charge for Formation & Bridge work for One Block Section. Additional responsibility of overall documentation work during CRS & presentation.

Successful CRS inspection & Speed Trail of Sogaria-Bhonra section in Feb-2020 (28.3 Km) being Overall in-charge for Formation & Bridge work for One Block Section. Additional responsibility of overall documentation work during CRS & presentation.

Successful CRS inspection & Speed Trail of Bhonra-Bijora section in April-2021(25.70 Km) being overall in-charge for Civil work for One Block Section. Additional responsibility of overall documentation work during CRS & presentation.

Successful Renovation & Redevelopment of Sogaria Station as a satellite station of Kota Jn. with direct supervision. The redeveloped Sogaria station was innagurated by Hounerable Lok Sabha speaker on dtd 05.01.2022.

Successful CRS inspection & Speed Trail of Bijora-Baran section in Mar-2022(13.2Km) being overall monitoring In-charge for Civil/P-way work.

Preparation & subsequent finalization of revised estimate of kota-Bina Doubling Project.

Preparation of estimate for approx 84 nos of works (approx 150 crores) of kota-Bina Doubling Project.

Certification of RA bills of all Contractors of Pkg-1 from PMC.

Preparation of PVC & GST impact bills of Pkg-1 Contracts.

Successful load testing Bridge no.14 & 18 (major) in SGAC-BON Section & preparation of final report.

Resolution of contractual matters with client & contractors and settlement of disputes amicably.

Design calculation of bridges & earthworks for submission to CRS.

Finalization of NS items, Variations in all the different contracts.

Assistant Engineer (Civil,Billing & Planning)

Era Infra Engineering Limited
Nagpur,Maharastra
06.2013 - 10.2015

Client:-National Thermal Power Corporation Limited (NTPC)

  • Bharat heavy Electricals Limited (BHEL)
  • National Highway Authority of India (NHAI)

Projects:- i) Mauda Super Thermal power Project (Main plant & Offsite civil works package for Mauda Stage-I 2 X 500 MW), NTPC, NAGPUR.

North Chennai Thermal Power Station,Stage-II, (BHEL Athipattu Tamilnadu 2 X 600 MW)

Four Laning Of Haridwar Highway from Muzaffarnagar to haridwar Section of NH-58 from 131+000 to 211+000 UP & Uttarakhand.

ROLES AND RESPONSIBILITIES

Role:

● Review of bills of quantities and item lists.

● Value engineering to achieve functionality, safety, speed of execution and quality at lower costs by evaluation of different options.

● Preparation and certification of bills and invoices from Client.

● Construction supervision of civil works at site, including safety, quality and timeschedule.

● Analysis of variation claims by contractors /vendors and closing of the same.

● Contracts Administration and enforcement at site. Coordination with own team to ensure smooth execution and handover detail information.

Responsibilities:

● Prepare Preliminary Estimates at proposal stages.

● Prepare Detailed Bill of Quantities estimates.

● Prepare Green Book as per estimated quantity & planning for execution of the same.

● Inspection and Verification of Works Measurements.

● Processing the invoice as per terms and contracts.

● Rate Analysis, Bill Estimation, Costing.

● Preparation of bill of quantities (BOQ).

● Preparation of Certifications.

● To support PM in billing & generating cost related reports and documentation.

● Checking measurements

● Quantity estimation

● Bill certification

● Preparing reconciliation statements

● Preparing monthly & weekly cost reports

● Knowledge on Computer operation.

● Preparation of Estimation and Costing.

● Preparation of Monthly Budget, Weekly Budgets with Estimates of Requirement of Material & manpower.

● MIS reporting - daily, weekly & monthly reports etc

Education

Bachelor of Science - Data Science & Applications

IIT Madras
Chennai
10.2023 - Current

Bachelor of Technology - Civil Enigineer

Gandhi Institute of Engineering & Technology
Gunupur
08.2009 - 06.2013

+2 Science -

Kendrapara Autonomous College
Kendrapara
07.2007 - 06.2009

Matriculation -

M.N. High School
Pattamundai
06.2006 - 03.2007

Skills

    Railway Construction Works

undefined

Software

ERP

SAP

MSP

AUTOCAD

MS OFFICE

Certification

Autocad 2012 from Autodesk

Timeline

Bachelor of Science - Data Science & Applications

IIT Madras
10.2023 - Current

Deputy Resident Engineer/Civil

RODIC Consultants Private Limited
08.2022 - Current

Deputy Resident Engineer/Civil

Aarvee Associates
10.2015 - 08.2022

Assistant Engineer (Civil,Billing & Planning)

Era Infra Engineering Limited
06.2013 - 10.2015

STAAD Pro. from CTTC, Bhubaneswar

05-2012

Autocad 2012 from Autodesk

01-2012

Bachelor of Technology - Civil Enigineer

Gandhi Institute of Engineering & Technology
08.2009 - 06.2013

+2 Science -

Kendrapara Autonomous College
07.2007 - 06.2009

Matriculation -

M.N. High School
06.2006 - 03.2007
ALOK RANJAN SAHOOCIVIL ENGINEER With 10+ Years Experience