Summary
Overview
Work History
Education
Skills
Job Responsibilities:
Extra-Curricular Activities :
Interests
Disclaimer
Timeline
Generic

Amit Kumar Saini

Project Manager
Global Heights, Sohna, Gurugram

Summary

I am seeking a challenging work in an esteemed organization requiring multi-dimensional skills and providing an opportunity to learn more and skills in accomplishing each job. I undertake to the utmost under your able guidance for mutual benefit.

Overview

15
15
years of professional experience
2
2
Languages

Work History

Project Manager - HVAC

Comfonomics Design Venture LLP
11.2022 - Current
  • Working as a Project Manager with M/s Comfonomics Design Venture LLP., Gurugram from 19th Nov. 2022 to till now on the projects of :-


1) Web Werks Data Center, MIIIDC, Rabale, Navi Mumbai (MH)


2) Sify Infinity Space Ltd., T5 Data Center, MIIIDC, Rabale, Navi Mumbai (MH)


3) Navi Mumbai International Airport Ltd, Navi Mumbai (MH)

Sr. Engineer - HVAC/MEP

Varindera Construction Ltd.
09.2021 - 03.2022
  • Worked as a Sr. Engineer – HVAC/MEP with M/s Varindera Construction Ltd., Sec- 17, Gurugram from 15th September 2021 to 31st March 2022 on the project of :-


1) Rafele Hanger, Airforce Station, Hasimara (West Bengal)


2) SU 30 Hanger, Airforce Station, Chabua (Assam)

Project Engineer - HVAC

Sharad Insulations and Interiors (India) Pvt. Ltd.
08.2020 - 09.2021
  • Worked as a Project Engineer HVAC with M/s Sharad Insulations and Interiors (India) Pvt. Ltd., Lajpat Nagar, New Delhi from 15th August 2020 to 10th September 2021 on the projects of :-


1) Bharma Bestech Athena, Sec -16,Gurgram (HR)


2) AMB Selfie Street Mall, Sec-93 Gurugram (HR)

Project Manager - HVAC / MEP

Sanvik Engineers (India) Pvt. Ltd.
10.2011 - 12.2019
  • Worked as a Project Manager with M/s Sanvik Engineers (India) Pvt. Ltd., New Delhi from 10th Oct. 2011 to 15th Dec. 2019 on the projects of :-


1) Ireo Mixed Use Project, Grand Hyatt, Sec – 58, Gurugram (HR)


2) Tower – A& B, Unitech Signature Tower – II, Sec – 15 part 2, Gurugram (HR)


3) JMD Megapolis, Sohna Road, Gurugram (HR)


4) Tower – 2, 3, 4 & 5, Unitech Reality Project Ltd., Infopark (CANDOR), SEZ, Sec-48, Tikri, Gurugram (HR)


5) Uniworld Commercial Tower – b, Sec – 48, Gurugram (HR)


6) Uniworld Garden -II, Sec - 47, Gurugram (HR)


7) Uniworld Resorts - The Residensies, Sec - 33, Gurugram (HR)


8) Block-8, Unitech Developers&Projects Ltd., Gurgaon Infospace (CANDOR) Ltd., SEZ, Sec-21, Gurugram (HR)


HVAC Engineer Trainee

Blue Star Ltd.
07.2010 - 09.2011
  • Worked in M/s Blue Star Ltd. on the contract basis of M/s S.B. Infrabuild Pvt. Ltd. as a HVAC Engineer Trainee from 1st July 2010 till 30th Sep. 2011 on the site of DAEMPL (Delhi Airport Express Metro Pvt. Ltd.) project in Dwarka Sec -8, New Delhi.

Education

Degree in Mechanical Engineering -

B.S.A. College of Engineering & Technology
Mathura (UP)
01.2010

Skills

  • I am punctual and flexible in my approach and adjust to any kind of situation
undefined

Job Responsibilities:

  • Detailed study of specification, drawing & scope of work.
  • Estimation of materials & items to install as per approved drawings & submittals.
  • Preparation of work schedule and mobilization of material & technician’s team at site.
  • Installation of Equipment like Condenser & Chilled water pipes, Condensate drain pipes, air ducts, AHUs, CAHUs, PACUs, FCUs, Cooling tower, valves, pumps(Primary, Secondary & Condenser), Chillers, fans(fresh air & exhaust), Heat Recovery units, Air Washer & scrubber, grilles, diffusers, electrical panels, VFDs etc.
  • Coordination with other MEP services & civil construction at site.
  • Material and man power planning & handling.
  • Approvals getting from client for Technical Submittals, Drawings, material Inspection request, Banch marks, Installation requests etc.
  • Reconcile & Amendment the quantity require of equipment, accessories & material required for execute the site.
  • Site progress monitoring and providing reports and allotting manpower as per site conditions.
  • Controlling the material movement.
  • Check the quality of work done by subcontractor frequently.
  • Coordination with the subcontractors and their bill processing cost evaluation.
  • Certification of running bills from client to maintain the smooth cash flow.
  • Carry out pre-commissioning & pre-checks of all HVAC system.
  • Carry out the testing & commissioning of all HVAC system.
  • Preparation of handing over documents with testing & commissioning documents, as built drawings and operation & maintenance manuals.
  • Carry out the maintenance of all HVAC equipment in the project.

Extra-Curricular Activities :

  • Industrial Training for 4 weeks from B.H.E.L Haridwar in Fabrication Block.
  • One month summer course on Catia & Uni Graphics in CITD Hyderabad.
  • Made a Project in college on An Amphibian Vehicle.
  • Achieved N.C.C. ‘B’ Certificate.

Interests

Travelling, Listening music

Disclaimer

I consider myself-familiar with Mechanical Engg. aspects. I am also confident of my ability to work in team. I hereby declare that the information furnished above is true and are best of my knowledge.

Timeline

Project Manager - HVAC

Comfonomics Design Venture LLP
11.2022 - Current

Sr. Engineer - HVAC/MEP

Varindera Construction Ltd.
09.2021 - 03.2022

Project Engineer - HVAC

Sharad Insulations and Interiors (India) Pvt. Ltd.
08.2020 - 09.2021

Project Manager - HVAC / MEP

Sanvik Engineers (India) Pvt. Ltd.
10.2011 - 12.2019

HVAC Engineer Trainee

Blue Star Ltd.
07.2010 - 09.2011

Degree in Mechanical Engineering -

B.S.A. College of Engineering & Technology
Amit Kumar SainiProject Manager