Summary

Results-driven professional with 30+ years in power projects, specializing in electrical maintenance, HV switchyard erection, and commissioning from 33kV to 400kV. Expertise in project planning, scheduling, and execution, ensuring on-time and within-budget delivery. Skilled in implementing predictive and preventive maintenance practices, optimizing equipment availability, and managing critical spare inventories.

Overview

33
33
years of professional experience

Work History

Sr.GM(E&I)

M/S. Lloyds infrastructure and construction limited a group of Lloyds Metals and Energy limited
03.2026 - Current
  • Led green field project for 1x400/132KV and 1x400/220KV substations, 220KV extension, 185 KM 400KV transmission line, and 4x180 MW power plant as head of electrical.
  • Reported to Senior Vice President of Engineering and Infrastructure
  • Directed large-scale infrastructure projects, ensuring alignment with strategic objectives and industry standards.
  • Streamlined operational processes, enhancing efficiency and reducing project timelines across multiple initiatives.
  • Led cross-functional teams to deliver complex construction projects within budget and scheduled deadlines.

Sr.GM (E&I)

M/S. Shyam Metallics and Energy limited
07.2024 - 02.2026
  • Led E&I department overseeing 2X90MW power plant project, 132KV substation, and steel plant; managed O&M for 163MW power plant, steel unit, utility, automation, and EHV 132KV to 6.6KV power system, while heading Central Electrical department.
  • Designed and commissioned high and low tension power systems.
  • Led operational strategy to enhance production efficiency and reduce costs across multiple departments.
  • Oversaw development and implementation of safety protocols, ensuring compliance with industry regulations.
  • Mentored management team, fostering leadership skills and enhancing overall departmental performance.

GM (E&I)

M/S. Ramsarup Industries ltd
11.2022 - 07.2024
  • Led the E&I department of the plant, managing the power plant and steel unit, and overseeing the greenfield project that included the power plant, sponge, blast furnace, DIP, rolling mill, pellet plant, SMS, and sinter plant.
  • Directed operational strategies to enhance overall production efficiency and minimize costs.
  • Implemented quality control measures, resulting in improved product standards and customer satisfaction.
  • Managed cross-functional teams to streamline workflows and optimize resource allocation.
  • Directed operational strategies to enhance production efficiency and reduce costs.
  • Implemented quality control measures to ensure product excellence and compliance with industry standards.
  • Led cross-functional teams to achieve strategic objectives and improve overall business performance.
  • Developed comprehensive business plans aligned with organizational goals and market trends.
  • Streamlined supply chain processes, optimizing inventory management and reducing lead times.
  • Fostered a culture of continuous improvement through training programs and performance evaluations.
  • Established KPIs to monitor departmental performance and drive accountability across teams.
  • Cultivated relationships with key stakeholders, enhancing collaboration and aligning business interests.
  • Managed budget implementations, employee reviews, training, schedules, and contract negotiations.
  • Managed a diverse team of professionals, fostering a positive work environment and high employee satisfaction.
  • Cultivated strong relationships with clients, vendors, and partners to ensure long-term success and loyalty.
  • Managed budget development, forecasting, and financial reporting processes to track progress towards organizational objectives accurately.
  • Monitored financial performance, set budgets and controlled expenses to provide financial stability and long-term organizational growth.
  • Managed budget implementations, employee evaluations, and contract details.
  • Increased overall company efficiency by streamlining operations and implementing innovative managerial strategies.
  • Established comprehensive employee training programs to develop skills, improve productivity, and maintain compliance with industry regulations.
  • Negotiated with suppliers to secure better pricing, reducing operational costs while maintaining product quality.
  • Trained and guided team members to maintain high productivity and performance metrics.
  • Observed each employee's individual strengths and initiated mentoring program to improve areas of weakness.
  • Reported issues to higher management with great detail.

GM Electrical

M/S. Jai Balaji steel ind ltd
07.2017 - 11.2022
  • Led the Electrical department of the power plant and managed the operation and maintenance of electrical equipment including transformers, LT&HT panels, chiller units, cooling towers, UPS, LT&HT motors, cranes, and DG sets.
  • Planned maintenance schedules, managed spare parts, and developed budget plans while implementing condition-based maintenance practices.
  • Completed the 33KV grid synchronization project and progressed the 35-ton BFG boiler expansion project to the contract stage.
  • Reported directly to the VP of Electrical and the VP of the Power plant.

AGM Electrical

M/S.V S Lignite power
09.2015 - 07.2017
  • As a Head of Electrical department & take care of Electrical O&M of 10MW Solar plant & 135MW thermal power plant & looking after all day-to-day maintenance in whole plant with 220Kv switch yard and transmission line including technical & commercial responsibilities.
  • Liaisoning with Rajasthan Grid authority as routine job.
  • Key Achievement - Independently overhauling Generator.
  • A group of M/S.KSK ENERGY VENTURES LTD
  • Demonstrated respect, friendliness, and willingness to help wherever needed.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Developed and maintained courteous and effective working relationships.
  • Used critical thinking to break down problems, evaluate solutions, and make decisions.
  • Identified issues, analyzed information, and provided solutions to problems.
  • Resolved problems, improved operations, and provided exceptional service.
  • Goal-oriented professional with proven success in applying analytical skills to solve complex problems and overcome challenges. Dedicated to enhancing team performance and driving business success.
  • Organized professional with expertise in managing resources and optimizing performance. Proficient in providing valuable insights and supporting decision-making processes. Committed to enhancing productivity and contributing to overall success.

Dy.Chief Engineer

M/s. Jai Prakash Power Ventures Limited
09.2012 - 08.2015
  • As section head taking care of BTG & Switchyard Electrical Maintenance and troubleshooting, maintenance planning review of BTG & 400KV Switchyard area including all Power Transformers, Generator, scada system, 11KV/6.6KV/3.3KV HT boards, HT Motors, UPS, Battery charger, all Boiler & Turbine Aux. equipment, synchronizing system, protection system of switchyard and boiler HT motors, Power transformers, DG set, all protection system of Transformer, HT equipment, Switch yard and myself initiated and established modern Testing lab equipped with all testing equipment at site and all testing of equipment under my supervision and liaising with Power grid authority.
  • Oversaw project execution for the BTG area of a 2X660MW supercritical thermal power plant and its 400KV switchyard.
  • Led engineering teams to execute complex power generation projects on time and within budget.
  • Developed and implemented operational strategies to enhance efficiency and reliability of power systems.
  • Oversaw compliance with industry regulations, ensuring adherence to safety and environmental standards.
  • Led engineering teams in project execution, ensuring alignment with safety and quality standards.
  • Developed and implemented maintenance strategies to enhance operational efficiency and reliability of equipment.
  • Oversaw design reviews and engineering analyses, driving continuous improvement in technical specifications.
  • Managed procurement processes for critical engineering materials, optimizing cost-effectiveness and supply chain logistics.
  • Collaborated with cross-functional teams to align engineering objectives with organizational goals, enhancing project outcomes.
  • Conducted risk assessments for engineering projects, identifying potential issues and implementing mitigation strategies.
  • Enhanced team performance through regular training, mentoring, and professional development opportunities.
  • Strengthened relationships with clients by consistently delivering exceptional service and maintaining open lines of communication throughout each project''s lifecycle.
  • Led cross-functional teams to successfully complete complex projects within budget and on schedule.

Site Manager

ABB Limited
01.2010 - 01.2012
  • Managed execution and commissioning of power plant, including erection of power transformers, distribution transformers, 6.6KV MV panels, bus duct, generator circuit breaker, power and control cabling, LT and HT motors, plant illumination, and earthing system.
  • Shouldered the responsibility for handling all the executions & commissioning of power plant included erection & commissioning of power transformer, Distribution transformers, 6.6KV MV Panels, Bus duct, Generator circuit breaker, power & control cabling, LT & HT motors, plant illumination, earthing system.
  • Led erection and commissioning of 132KV and two 400KV switchyards, overseeing equipment erection, testing, and commissioning of all equipment including SCADA system.
  • Coordinated HR and legal compliance activities to ensure alignment with project schedule completion.
  • Fully accountable to liaise HR & legal compliances with project schedule completion.

Sr. Manager – Power Plant Electrical

Adhunik Metaliks Limited
01.2006 - 01.2010
  • Coordinated successfully to complete 2x17MW Power Plant with 5 nos 10 Tph WHRB Boiler with 1 No 130 Ton CFBC boiler.
  • Drawn up plans to manage overall responsibilities of Electrical Maintenance of 34MW coal-based power plant equipped with 130T CFBC Boiler, 132KV switchyard as well as monitored the electrical Operation & maintenance of power plant.
  • Managed erection and commissioning of switch gears, including generator transformer, CT, PT, ESP panel, turbine control panel, AVR panel, MCC panel, and coal handling plant, along with installation and testing of relays and transformers.
  • Led a team to perform preventive and breakdown maintenance while planning for maintenance tasks.
  • Independently handled electrical maintenance, overhauling of LT, HT motors, Transformers, Panels, VVF drives, EOT crane, Lift, Generator, soft starter panels, compressors, HT & LT DG set.
  • Oversaw construction and commissioning of 2x17MW power plant, ensuring adherence to specifications.

Sr. Engineer (Power Plant – Electrical)

DLF Power Limited
01.2000 - 01.2006
  • Significantly headed the electrical operations & maintenance of all equipment of 3x11 MW of the coal fired FBC Boiler & BHEL Generator.
  • Looking after maintenance of Power & distribution transformers, HT & LT Motors, Panels, HT & LT Breakers, all types of MOVs, VFD drives, Generator, Exciter, EOT Cranes, DC Motors, all switchyard equipment.
  • Efficiently brought about 10- 20% reduction in downtime as well as increase in PLF from 70% to 90% (increase in productivity).
  • Oversaw project for 11/33 KV switchyard.
  • Accredited for preventive & breakdown maintenance of 33 KV switchyard.
  • Project-3x11MW Power plant.

Assistant Engineer (Power Plant – Electrical)

Orient Paper Mills Limited
01.1994 - 01.2000
  • Participated in the erection and commissioning of a 25 MW power plant that included a 75 TPH BHEL make boiler and a 50 TPH BHEL make stroker fired boiler.
  • An Erection team member active participation, right from Project Planning to successful Erection & Commissioning of all electrical equipment (HT & LT) of 75 TPH Recovery boiler.
  • Troubleshooting and Schedule maintenance of all the Electrical equipment of Power plant of 25 MW capacity which included Coal Fired Boilers, Turbine Section and Auxiliaries and stroker fire Boiler Section after successful commissioning of the Plant.
  • Led installation of variable voltage frequency drives (VVFD) in plant to optimize energy efficiency.
  • Participated in the preventive and breakdown maintenance of electrical systems in the power plant.

Education

Diploma - Electrical

Rourkela Institute of Technology
Rourkela, odisha
01-1992

Skills

Power plant operations

Erection & commissioning

Testing/Protection system

Energy conservation

Power generation optimization

SCADA automation

Project Management

Planning

Maintenance

Fault Analysis

Performance monitoring

Risk assessment

Statutory compliance

Compliance adherence

Budget planning

Operations management

Infrastructure management

Cross-functional collaboration

Team leadership

Strategic leadership

Client management

Client engagement

Strategic planning

Strategic partnerships

Workforce planning

Profitability optimization

Condition maintenance

Problem-solving

Decision-making

Judgment skills

Time management

Staff training

Leadership skills

Interests

cricket and badminton

Training

  • Programming of Numerical Relays at New Delhi
  • Energy conservation seminar
  • Training of Plant Maintenance on SAP PM Module
  • Training of management skills at Kolkata
  • Training of HT Breaker at Kolkata Siemens
  • Training of VVFD system at Bangalore, ABB Training centre

Personal Information

  • Passport Number: P9960839
  • Notice Period: 30 days

Custom Section

  • Electrical Operations
  • Testing
  • Maintenance
  • Project Management
  • Automation

Permanant Adress

Nehru Nagar-7th lane, Berhampur, Ganjam, Odisha

Timeline

Sr.GM(E&I)

M/S. Lloyds infrastructure and construction limited a group of Lloyds Metals and Energy limited
03.2026 - Current

Sr.GM (E&I)

M/S. Shyam Metallics and Energy limited
07.2024 - 02.2026

GM (E&I)

M/S. Ramsarup Industries ltd
11.2022 - 07.2024

GM Electrical

M/S. Jai Balaji steel ind ltd
07.2017 - 11.2022

AGM Electrical

M/S.V S Lignite power
09.2015 - 07.2017

Dy.Chief Engineer

M/s. Jai Prakash Power Ventures Limited
09.2012 - 08.2015

Site Manager

ABB Limited
01.2010 - 01.2012

Sr. Manager – Power Plant Electrical

Adhunik Metaliks Limited
01.2006 - 01.2010

Sr. Engineer (Power Plant – Electrical)

DLF Power Limited
01.2000 - 01.2006

Assistant Engineer (Power Plant – Electrical)

Orient Paper Mills Limited
01.1994 - 01.2000

Diploma - Electrical

Rourkela Institute of Technology
Amulya SabatSR.GM-ELECTRICAL