Summary
Overview
Work History
Education
Skills
Certification
Timeline
Projects
Global Visit
Generic
Anandhan Muniasamy

Anandhan Muniasamy

Production And Manufacturing Operations Specialist
Chennai

Summary

Manufacturing leader directing rubber mixing and component output with close control over planning, manpower deployment, and floor discipline. Supports the Production Manager scope through machine utilization, troubleshooting, and Lean methods that improve flow and cut waste. Builds consistent execution by coaching operators, validating new compounds, keeping compliance work on schedule, and using SAP.

Overview

3
3
Languages
9
9
Certifications
16
16
years of professional experience

Work History

Assistant Manager - Operations

Freudenberg-NOK Ltd
Chennai, TAMIL NADU
10.2021 - Current
  • Enhance manufacturing efficiency by analyzing production layouts and leading process improvement projects.
  • Improve workflow performance by identifying and resolving production bottlenecks across multiple lines.
  • Coordinate with 28 manpower by balancing manpower deployment with production needs and safe work practices.
  • Produce 3-ton compound per shift through disciplined machine planning, manpower deployment, and shop-floor coordination.
  • Manage production execution by aligning machine availability, manpower, and floor coordination to meet planned monthly and daily targets.
  • Lead insourced compound development, validation trials, troubleshooting, and process improvements across mixing and molding operations.
  • Implement lean manufacturing through 5S, LPMS , OEE ,visual workplace, standard work, SMED, flow improvement, and waste reduction.
  • Handle audit preparation, compliance documentation, and IATF 16949, ISO 14001, and ISO 45001 system requirements while supporting a safe work environment.
  • Strengthen workforce capability through operator training, classroom sessions, on-the-job coaching, and global best-practice sharing.
  • Execute the production planning and shop floor order release activities and update the BOM and routing in SAP.
  • Lead and execute CAPEX projects to support future business growth.
  • Collaborated effectively with global teams to troubleshoot and resolve production and process issues

Executive

Apollo Tyres Ltd.
09.2010 - 02.2021
  • Managed 270 tons of compound production per shift, leading a team of 45 personnel to ensure consistent output in a high-volume manufacturing environment
  • Supported production continuity through machine utilization and safe work practices.
  • Coordinated production planning with cross-functional teams to align quality checks and customer requirements.
  • Reinforced quality adherence by monitoring process discipline and reducing rework through careful issue follow-up.
  • Execute for process scrap reduction.
  • Carry out continuous improvement activities in the manufacturing process.

Education

Diploma - Rubber Technology

IIT
Kharagpur
05-2019

Bachelor of Technology - Mechanical Engineering

SRM university
Chennai
05-2016

Diploma - Mechanical Engineering

KLN polytechnic College
Madurai
05-2009

Skills

Rubber Mixing , Compounding , Preform Extrusion and Molding

Production planning

Inventory control

SAP

Lean manufacturing

OEE

5S

SMED

KPI reporting

Root cause analysis

Downtime analysis

P&L management

Change management

Certification

Gold Award in the Quality Circle Forum of India

Timeline

Assistant Manager - Operations

Freudenberg-NOK Ltd
10.2021 - Current

Executive

Apollo Tyres Ltd.
09.2010 - 02.2021

Diploma - Rubber Technology

IIT

Bachelor of Technology - Mechanical Engineering

SRM university

Diploma - Mechanical Engineering

KLN polytechnic College

Projects

1.Project Title - SMED in Preform Extruder (Mar 2024)

  • SMED-based changeover improvement project for the Preform Extruder, eliminating non-value-added setup activities and streamlining changeover procedures.
  • Reduced changeover time by 57% (35.3 min to 15.3 min), improving equipment availability and production flexibility.
  • Delivered ₹1.4 million annual cost savings through reduced downtime and enhanced asset utilization.

2.Project Title - 3P layout modification in Intemixer (May 2025)

  • 3P and Single Piece Flow process improvement project for the Intermixer, optimizing layout and work flow to eliminate non-value-added movement.
  • Reduced operator walking distance by 67% (15 m to 5 m per batch) and improved filler exhaust system effectiveness through workplace redesign.
  • Implemented a U-shaped layout, enabling smoother single-piece flow and enhancing productivity, ergonomics, and operational safety.

3.Project Title - Standard Work Productivity Improvement in Preform Extruder1 (Sep 2025)

  • Standard Work productivity improvement project on Preform Extruder-1, eliminating non-value-added activities and optimizing material handling.
  • Reduced walking distance by 88% (72 m to 8 m), cycle time by 33% (45 min to 30 min), and manpower requirement from 1.5 to 1 operator.
  • Increased output from 10 to 15 batches and generated ₹10.7 million annual savings through process standardization.

Global Visit

Global Best Practice Benchmarking Visit – Europe (Germany)

  • Participated in a cross-functional visit to European manufacturing facilities to observe and benchmark global best practices in Lean Manufacturing, Operational Excellence, Safety, and Productivity Improvement.

Thanks & Regards

ANANDHAN.M

Anandhan Muniasamy Production And Manufacturing Operations Specialist