Piping Engineering professional with expertise in piping layout design and project execution. Delivered optimized layouts and efficient engineering solutions in oil & gas projects through advanced knowledge of relevant codes and standards. Holds a Post Graduate Diploma in Piping Engineering and a Bachelor's degree in Mechanical Engineering.
Overview
15
15
years of professional experience
Work History
Discipline Lead (Piping)
L&T Technology Services limited
03.2024 - Current
Working as a Piping Layout Engineer Preparation of Detail Engineering Proposal
Preparation of Tie-In Schedule, Tie-In List.
Review of Process P&ID and Process Line List
Finalize the Piping routing with help of Lasser Scan and E3D& SP3D.
Review of all Isometrics of Diesel Segregation DED Projects
Compiled material take-off to ensure accurate project resource allocation.
Developed and updated project piping material class specifications.
Preparation of Nozzle Orientation, Equipment layout.
Preparation of Piping GAD.
Conducted 30%, 60%, and 90% model reviews with ExxonMobil client.
Developed scope of work to clarify project objectives and tasks.
Preparation of PMS for Pipeline project EMPco Mid land project.
Review engineering drawing and reference of engineering standards for the contract.
Conducted turnaround meetings to finalize work scope and preparations
Works closely with clients and other disciplines on resolution of piping related issues and close the site related query
Asst. Manager
VCS Quality Services Pvt LTD
03.2024 - Current
Working as Piping Engineer Preparation of Piping GAD, MTO, and Plot Plan.
Preparation of Piping & Pipeline Design Basis
Preparation of Equipment Layout and Nozzle orientation drawings.
Preparation of Equipment Layout of Tank installation
Finalize the piping routing.
Hydrostatic Calculation of Pipeline/piping
Piping routing on new pipe rack as per standard.
Thickness calculation of Pipe as per ASME B.31.3 and Branch connection
Calculated line pipe thickness according to ASME B 31.3.
Development of technical, design and purchasing specifications for all bulk piping component
Pipeline documentation include Design Basis, Installation and Construction Specifications
Preparation of technical tender of Piping and pipeline project.
Preparation of Pipeline tender.
Preparation of SOR (Schedule of rates) for all Piping and pipeline components.
Prepared technical documents for tender submissions to support project bidding process.
Evaluated technical bid analysis to ensure compliance with project specifications and technical queries from various bidders.
Managed piping documentation for efficient tracking and accessibility throughout project lifecycle.
Review of QAP, Valve data Sheet.
Buoyancy control methodology and calculation procedures.
Works closely with clients and other disciplines on resolution of piping related issues
Project Engineer
MECON Limited
11.2017 - 08.2022
Working as Project Engineer from project management consultant (PMC) side for GAIL LNG line laying project in Kerala. Managed the planning, execution, inspection, and testing of pipeline laying and station piping for the RLNG pipeline project Kochi-Kootanad - Bangalore - Mangalore (30"- 96 Km & 24" - 388Km).
Reviewed and inspected mainline hydrotest of pipeline per ASME B31.4.
Review and inspection of Magnetic gauging of Pipeline and Inline Inspection and EGP of natural gas Pipeline.
Inspected pipeline and piping, identified materials, verified MTC, fit-up of weld joints, conducted welding inspections, examined and witnessed destructive and non-destructive testing, performed post-weld heat treatment as per specifications and applicable codes, conducted final visual and dimensional checks, and executed hydro and pneumatic pressure testing, along with surface preparation and painting.
Created comprehensive technical specifications for pipeline laying operations..
Developed detailed technical specifications to guide mainline hydrotesting..
Created detailed drawings to secure PESO approval for pipeline projects.
Preparation of Piping GAD and isometrics for Intermediate Pigging Station, SV Station and Dispatch terminal.
Developed alignment sheets to ensure proper pipeline installation.
Pipeline design as per ASME B 31.8 and ASME B31.4.
Preparation of Crossing Drawing of natural gas pipeline like Railway Crossing and NH/SH Crossing.
Performed load assessments for pipeline crossings to maintain safety standards..
Execute the Longest HDD in KKBMPL Ph II Project 30" x 2.1 Km.
Preparation of HDD Profile
Design review of HDD calculation.
Design and Profile review of Microtunnling HDD.
Thickness Chart preparation of Laying of Natural Gas Pipeline.
On the basis of ILI report I can analyze of Pipeline life.
Risk Life assessment of Pipeline.
Equipment layout finalization of HPL terminal Bhatinda.
Coordinated with interdisciplinary teams to resolve piping-related issues.
Review the Process P&ID and line list.
Model review with the client.
Model review with the client.
Site Engineer
Pioneer E Solution Pvt Ltd
02.2017 - 11.2017
Working as site engineer for LNG pipeline laying project(Jagdishpur-Haldia Project) representing GAIL team for daily planning and execution and co-ordination with project management consultant EIL team.
Reviewed project status with GAIL project control team and PMC (EIL), prepared status reports, and implemented necessary follow-up actions to address project challenges.
Review the engineering drawing, execution of pipeline as per drawing and quality control starting from positive material identification (PMI), Inspection of welding starting from consumables, welder qualification and successful pipeline laying as per approved drawing and specification in line with applicable code and standards.
Developed comprehensive crossing drawings for NHAI Railways and other crossings, facilitating accurate project execution.
Designed crossing drawings for the installation of the natural gas pipeline, ensuring alignment with project standards.
Prepared 3(1) and 6(1) notifications to acquire ROU for laying pipeline, ensuring compliance with regulatory requirements.
Compiled daily progress reports for natural gas pipeline construction, providing insights to track project milestones and facilitate timely decision-making.
INSPECTION ENGINEER
Bonace Engineers Pvt Ltd
11.2016 - 01.2017
Conducted inspections of piping works according to drawings and line isometrics, ensuring compliance with quality standards.
Executed installation of MDPE and HDPE pipelines, ensuring adherence to project specifications.
Resolved technical issues during installation of equipment and valves on-site.
Managed effective resource utilization at construction site, including daily progress reporting.
QUALITY ENGINEER
Larsen and turbo (L&T)(ECON)
05.2014 - 05.2016
Excellence in effective utilization of available resources at project construction site including daily progress report.
Gained hands-on experience in pipeline erection within process units, including crude distillation and delayed coker units, contributing to successful construction and commissioning outcomes.
Executed fit-up, welding, and non-destructive testing (NDT) of piping at construction sites, ensuring adherence to project specifications and quality standards.
Inspected piping works against drawings and line isometric, performing preliminary checks on fittings and small bore connections to verify compliance and quality.
Familiar with International Design codes & standards ASME, ASTM, API & their application.
Knowledge of Shielded Metal Arc Welding (SMAW) and Gas Tungsten Arc Welding (GTAW) including electrodes for various steels.
Inspection of PMI of Material.
INSPECTION ENGINEER
ENGINEERS INDIA LIMITED
08.2011 - 09.2013
Inspected piping welds according to ASME B31.3 at various stages including fit-up, during welding, and after welding.
Witnessed pressure tests of pressure vessels and hydrocarbon process lines, ensuring compliance with safety and performance standards at MRPL-ONGC.
Prepared Procedure Qualification Record (PQR) and qualified welders' performance according to ASME Sec IX for various steel grades.
Internal Inspection of pressure vessel, heater and boilers in Oil & Gas & Power plants in MRPLONGC.
Compiled detailed material lists for construction, facilitating accurate procurement and efficient project execution.
Resolved technical challenges during equipment and valve installation, ensuring successful integration and functionality.
Education
Post Graduate Diploma -
Suvidya Institute of Technology
Mumbai
01-2016
Bachelor degree - Mechanical Engineering
MJP ROHILKHAND UNIVERSITY
BAREILLY, UTTAR PRADESH
01-2011
Skills
Bulk MTO preparation
Construction isometrics preparation
Checking of Isometric Drawings
Final MTO preparation
Pipe rack design
Tank farm design
Pressure Part Calculation
Preparation of PMS
Preparation of WPS & PQR
Pipe thickness calculation
Technical tender preparation
Pipeline hydrostatic calculation
Induction bend calculation
Road Crossing Calculation
HDD calculation
Pipeline Stacking Calculation
Pipeline anti-buoyancy calculation
Reinforcement calculation
Pressure drop calculation
Piping GAD preparation
Review of all type of QAP
Technical specification preparation
Piping Components and their Use
Separation Process Design
Process Equipment's and Instruments
Control System Integration
Utility Systems Design
Pump System Design
ASME SEC IX
Pipeline Components and their uses
Piping codes knowledge
Plot Plan Development
ASME B318
Pipeline Safety Standards
Operational Safety Standards
Environmental Safety Guidelines
Welding Standards Compliance
Pipeline Integrity Standards
Welding Procedure Development
Pressure Vessel Standards
Caesar II
PDMS
MS Office
SP3D
Primavera P6
MSP
E3D
Laser Scanning Technology
Ultrasonic Testing
Pipeline Management Software
3D Modeling Software
Disclaimer
I hereby declare that all the information given above are true to the best of my knowledge and that I have taken extreme care in mentioning all of them.
Personal Information
Date of Birth: 01/11/89
Profile
Post Graduate Diploma in Piping Engineering, Suvidya Institute of Technology, Mumbai, 2016, Bachelor degree in Mechanical Engineering, MJP ROHILKHAND UNIVERSITY, BAREILLY, UTTAR PRADESH, 2011, Completed NDT LEVEL II, 15 years' 5 Months experience in oil and gas industry.