Summary
Overview
Work History
Education
Skills
Personal Information
Publications
Timeline
Generic

Anshit Sharma

Jabalpur

Summary

Petroleum Engineer with 12+ years extensive expertise in hydraulic fracturing, stimulation engineering and coiled tubing operations across unconventional and HPHT(High Pressure and High Temperature) reservoirs. Demonstrates strong proficiency in project management, cross-functional collaboration, and software tools such as Meyers Suite, DASTRAC, Cerberus, and Orion. Notable achievements include increasing revenue by 30% through optimized fracturing fluid designs and executing over 1,000 successful frac jobs. Experienced in technical mentoring, risk assessment, HSE compliance, and delivering strategic presentations to senior management and stakeholders. Career focus includes leveraging advanced technologies to enhance production efficiency and drive sustainable growth in energy operations. Published author with an OTC-indexed technical paper on perforation analysis on multistage hydraulic fracturing.

Overview

12
12
years of professional experience

Work History

Service Delivery Manager

Seros Energy Private Limited
Mumbai
09.2022 - Current
  • Engineering lead specialising in well stimulation and well intervention operations designing and execution, with strong P&L responsibility and client management skills as a service delivery manager.
  • Led the deal for SLB subcontracted Well Services operations for Vedanta, timely mobilised multiple CTU units and stimulation packages, and ended the two-year project with a 100% QHSE scorecard.
  • Design and implement innovative fracturing programmes for unconventional reservoirs, optimising frac fluid systems (HVFR and linear gel combinations) that delivered a 30% increase in revenue generation.
  • Develop, review, and own technical documents including well programmes, risk assessments, contingency plans, and HSE procedures, ensuring compliance with industry standards.
  • Negotiated service level agreements with clients, setting clear expectations for service delivery.
  • Led a cross-functional team that improved equipment utilisation across our fracturing and coiled tubing fleets, resulting in significant annual cost savings and increased operational capacity to maintain a smooth revenue flow.
  • Managed emergency response to equipment failure, pipe failure, or any kind of NPT on a critical multi-well pad operation, organising replacement components and technical specialists with appreciable expedience.
  • Mentor and coach junior engineers on fracturing engineering principles, software tools (Meyers Suite, DASTRAC, Cerberus, and Orion), and technical problem-solving.

Lead - Hydraulic Fracturing & Coiled tubing

Superior Energy Services
Gurgaon
01.2020 - 09.2022
  • Responsible for the technical-commercial facets of events such as tendering, pre-bid meetings, tender clarifications, project kick-off meetings, job performance reviews, job design reviews, and post-job analysis.
  • Engineering in charge of production enhancement projects and responsible for engineering design, job execution, and pre/post job simulations for Coiled Tubing, Stimulation, and Nitrogen Pumping jobs for ongoing projects at Vedanta, Schlumberger, and Baker Hughes.
  • Responsible for the management of equipment and crew, and the training of junior engineers.
  • Negotiated with suppliers for the procurement of high-quality materials at competitive prices.
  • Stimulation Engineer for a project under Geo-Enpro to design matrix stimulation using mud acid, and addressing the problem statement of sand production via Zeta Potential reduction.
  • Served as Operations Coordinator for Barmer Base.
  • Project planning and tracking during the preparatory phase of units mobilisation.

Senior Engineer, (Hydraulic Fracturing & Coiled tubing)

Superior Energy Services
01.2016 - 01.2019
  • Project Engineer for Cairn India Limited, Geo-Enpro, Essar Oil Limited, and GEECL.
  • Engineer in charge for Raageshwari deep wells (HPHT), Barmer – While subcontracted under Schlumberger in the IPM project, conducted problem statement analysis, milling, cleanout, and N2 lift job design and execution for wells in Raageshwari, which were due for completion owing to issues such as fishing, tubular integrity, and perforations, with issues of minimum restrictions under HPHT environment.
  • Coiled Tubing Assisted Multistage Fracturing – Job design and execution, sand jet perforation with MCCL correlation, sand cleanout (linear gel and foamed gel), and sand dumping.
  • Selective stimulation using diverters – formation stimulation with different acid recipes, oxidising agents, enzymes, chelating agents, and diverters such as foam, rocksalt, and benzoic and naphthalene-based diverters to achieve conformance.
  • Conventional jobs of coiled tubing include foamed sand cleanout in sub-hydrostatic wells, wellbore cleanout for scale and deposit removal using high impact rotary tools, well unloading using nitrogen, planned and executed fishing jobs, IRBP and inflatable straddle packer setting, cement milling, SSD manipulation, and velocity string installation in gas wells.
  • Delivered detailed technical reports and presentations to senior management, providing insights into project progress, challenges, and solutions.
  • Designed the first-ever and successfully executed 'Selective Acidisation using foam diversion and defoamer' in CBM formation, which increased methane production considerably after treating 15 wells.

Well Stimulation Engineer

Essar Oil Limited
01.2014 - 01.2016
  • Planning simultaneous operations, coordinating with the service company for job execution, and executing Fracturing, Wireline, and Coiled Tubing operations.
  • Coil tubing field operations, which involved correlation of zones using MCCL/gamma tools, jet perforations, planning of sand plug placement for zonal isolation, sand cleanout operations by high flow-low flow MHA, high impact rotary tools, and inflatable straddle packer for acidising jobs.
  • Performed EZ clean jobs assisted by coil tubing to treat shut-in wells, remove guar polymer damage, and regain permeability.
  • Designed and performed a successful ‘Through Tubing Frac Job’ with a hydraulic packer.
  • Conducted preventive and corrective maintenance, PCP system failure detection, performed pump teardowns, space-out jobs, and well performance analyses.

Education

Bachelor of Technology - Petroleum Engineering (Upstream Majors)

Pandit Deendayal Petroleum University
Ahmedabad, GJ
2010 - 2014

Skills

  • Meyers Suite and Jobmaster
  • Well intervention project management
  • Collaborative teamwork
  • Proficiency in NOV software: Dashtrak, Cerberus, and Orion
  • Software skills

Personal Information

Date of birth: 1992-09-05

Publications

Performance Comparison of Sand Jet Perforating to Explosive Perforating for Multistage Hydraulic Fracturing of Coal Bed Methane Wells, OTC-27883-MS, Corresponding Author

Timeline

Service Delivery Manager

Seros Energy Private Limited
09.2022 - Current

Lead - Hydraulic Fracturing & Coiled tubing

Superior Energy Services
01.2020 - 09.2022

Senior Engineer, (Hydraulic Fracturing & Coiled tubing)

Superior Energy Services
01.2016 - 01.2019

Well Stimulation Engineer

Essar Oil Limited
01.2014 - 01.2016

Bachelor of Technology - Petroleum Engineering (Upstream Majors)

Pandit Deendayal Petroleum University
2010 - 2014
Anshit Sharma