Summary
Overview
Work History
Education
Skills
Affiliations
Accomplishments
Languages
Achievement as Division Planning, Commercial & Contracts Head :
Timeline
Generic
ANUPAM SENGUPTA

ANUPAM SENGUPTA

Planning, Commercial and Contracts Manager
KOLKATA

Summary

Results-oriented construction industry professional with over 24 years of experience. Specializing in project site management, particularly in Underground Metro, D&B Tunnel and PSP projects as a planning and commercial engineer. Demonstrated expertise in handling planning, commercial, and contract management for a division over the past 18 years. Currently serving as the DIV Planning, Commercial & Contract Head at ITD Cementation India Limited since 2013, overseeing underground Metro projects, TBM tunneling, Micro Tunneling, D&B tunneling, Hydro projects, Roads and Flyover Projects. Skilled in project management, resources allocation, budgeting, costing, claim management, audit handling, contracts and subcontract management. Extensive experience in insurance claim management and realization for CAR and TPL policies.

Overview

23
23
years of professional experience

Work History

Planning, Commercial & Contracts Head (Division)

ITD CEMENTATION INDIA LIMITED
KOLKATA
02.2013 - Current

Projects executed or being executed during the periods:

a) Under Metro Projects :

1. Design and Construction of Tunnels by Shield TBM, Palam, and I.G.D. Airport underground Stations by Cut & Cover Method between Palam (including) and Shankar Vihar (excluding) on Janakpuri West - Kalindi Kunj Corridor under Delhi MRTS Project of Phase III”-Client: Delhi Metro Rail Corporation Ltd

2. Design and construction of underground section under UG2 package for realigned portion from Esplanade to Sealdah west end - Client: Kolkata Metro Rail Corporation Limited.

3. Design and Construction of Underground Section, including Three Underground Stations at Siddhi Vinayak, Dadar, and Shitladevi Temple, and Associated Tunnels - Client: Mumbai Metro Rail Corporation Ltd.

4. Execution of civil engineering works for underground construction of R.C.C. Box tunnel in underground Biman Bandar Station yard using Diaphragm wall, H-pile, plunge pile, etc. and other allied works (from Ch.6411m to Ch.6873m) in connection with extension of Metro Railway from Noapara to Barasat via Biman Bandar -Client: Metro Railway Kolkata

5. Execution of Civil Engineering works for underground construction of RCC Box Tunnel, including Bimanbandar station, using diaphragm wall, H-pile, plunge pile, etc. and allied works from Ch:5.780Km to Ch:6.411Km by Cut & Cover method (Top Down) for Four to Five tracks in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar-Client : Metro Railway Kolkata

6. Design & Construction of Underground structures (Tunnels & Stations) of length 4.591 Km (approx.) from South of Tannery Road station to North Ramp (Ch. 16,822.521 m to Ch. 21413.298 m) including allied works and 4 Nos. Of UG Metro Stations, viz., Tannery Road, Venkateshpura, Arabic College, and Nagawara in Reach-6 line of Bangalore Metro Rail Project, Phase-2. Client: Bangalore Metro Rail Corporation Limited.

7. Execution of Civil Engineering works for Construction of underground RCC box Subway, dispersals (entry/exit facility) and allied works to provide Subway connectivity from underground Bimanbandar station to terminal building of NSCBI, Airport (Airport Portion), including Finishing, fire suppression & other allied works in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar-Client: Metro Railway Kolkata

8. Construction of Under Ground stations at Light House, Kutchery Road, Alwarpet, Bharathidasan Road including underground stabling yard and cross over at Light House Station and associated Twin tunnel, project start from chainage 0+001m to end chainage 5+150m (Down line)-Client: Chennai Metro Rail Ltd

9. Construction of Under Ground Stations at Boatclub, Nandanam, Panagalpark, Kodambakkam, Kodambakkam flyover including Underground Cross Over at Panagal Park Station and Associated Twin Tunnel, Cut & Cover Box, U Section and Ramp Project start from Chainage 5+150m to end chainage 10+027m (Down line)-Client : Chennai Metro Rail Limited

b) Micro Tunnel :

1. Providing and Laying 1400mm diameter. / 1800mm dia. RCC Jacking pipe Drainage Gravity Line on BPC Road (Gorwa APS to Shrenik Park Cross Road) by Micro-Tunneling Method -Client : Vadodara Municipal Corporation

2. Providing and Laying Sewage Trunkmain by Micro Tunnelling Method on Ashram Road from Wadaj Circle to Existing RCC Box on Riverfront of AMC Area - Client: Ahmedabad Municipal Corporation

3. Construction of sewer tunnel and allied works from Jai Bharat pumping station to Bandra IPS along Swami Vivekanand road by Segmental Tunneling (MSDP Stage II - Priority Works)-Client : Municipal Corporation of Greater Mumbai

4. Laying of Water Trunk Main from Garden Reach Water Works to Taratala Valve Station and Laying of Sewer Line along Diamond Harbour Road by Microtunneling Method - Client: Kolkata Municipal Corporation.

5. Development of S&D Network in Churial Extension Canal sub basin in Borough XIII & XVI (Part of Ward No. 122, 123, 124) including laying of main trunk sewer by Microtunnelling method and construction of Churial Extension Pumping Station -Client : Kolkata Municipal Corporation/KEIIP,

6. Laying of Trunk Sewer along James Long Sarani by Microtunneling Method - Client: Kolkata Municipal Corporation/KEIIP

c) D&B Tunnel :

1. Construction of Balance Work of Tunnels T-6, T-10, T-11, T-12 & T9 between Kauri and Dugga (Km 51.9 to KM 61.0) On Katra-Dharam section of Udhampur-Srinagar-Baramulla New BG Railway Line project, J&K State-Client: Konkan Railway Corporation Ltd

2. Construction of Adits 6 (1131m Long) on Tunnel T-11, 6A (392m Long) on Tunnel T-12 and Adit 7 (709m Long) on Tunnel 13 in connection with New Single Broad Guage Rail Link between Rishikesh and Karanprayag (125km) in the state of Uttarakhand, India -Client : Rail Vikas Nigam Limited,

3. Construction of balance tunneling works of Tunnel T-1 from KM 30.000 to KM 33.160, including construction of Br. No. 34, hydraulic protection measures of the Nallah at the T1 Adit portal and drainage of the T1 Adit on the Katra Dharam Section of Udhampur-Srinagar-Baramulla Rail Link Project in the State of Jammu and Kashmir. Client: Konkan Railway Corporation Ltd.

4. Construction of Tunnel T9-T10 (T9 between Km 27+587 to 28+140 (approx.) and T10 between Km 28+196 to Km 33+312 (approx.) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project-Client: Ircon International Limited,

5. Construction of Tunnel T-3 (between Km 6+123 to 7+391 (approx.) and Tunnel T-4 (between Km 7+526 to Km 11+494 approx.) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project-Client: Ircon International Limited,

6. Construction of T-6 (between Km 14+904 to Km 18+816 approx.) on Sivok (West Bengal) to Rangpo (Sikkim) New Single line BG Railway Line Project-Client: Ircon International Limited.

7. Civil and Hydro-Mechanical Works of 500 MW Chitravathi Pumped Storage Project at Peddakotla Village in Anantapur District of Andhra Pradesh. Client: Adani Renewable Energy Forty-Two Limited.

d) WTP Projects :

1. Rehabilitation and Refurbishment of Water Works at Palta and Garden Reach - Client: Kolkata Municipal Corporation, KEIIP.

Took charge as the Commercial Head of ITD Cementation India Limited in 2013. Currently responsible for overseeing Planning, Commercial, and Contract management tasks for various projects, including underground Metro, TBM Tunnelling, Micro Tunnelling, D&B tunnelling, Hydro projects, and PSP project.

Project management, resource allocation, project monitoring, budgeting, costing, claim management, subcontract management, cost to complete of the projects, financial audit, contract management, subcontract management, tender risk management, cost flow, and cash flow, and insurance claim. Overall responsibility of Top Line and Bottom line of the Division.

YEARLY REVENUE OF DIV -1: Around Rs. 2200 Cr in YE 2023-24

Planning and Commercial Engineer (Division Office)

ITD CEMENTATION INDIA LIMITED (Skanska Cementation India Limited)
KOLKATA
03.2004 - 01.2013

Projects monitored during the periods:

a) Marine Projects:

1. Construction of Coal Berth & Approach at Ennore Port - Client: Chettinad International Coal Terminal Pvt. Ltd ,

2. Design and Construction of Container Terminal at South Port Mundra, Client: Adani Port.

3. Design and Construction of Terminal-12 (T12) and part of Terminal-13 (T-13) at Mundra Port, Mundra -Client: Adani Port

4. Development of North Cargo Berth II, Tuticorin - Client: Tuticorin Port.

5. Gangavaram Port Expansion – 2011 - Client: Gujarat Adani Port Limited

6. Ship lift civil works for the project Seabird - Client: The Indian Navy, The President of India.

7. Construction of Container Yard at Mundra - Client: Adani Port.

8. Construction of the 10th Cargo Berth at Kandla Port - Client: Kandla Port Trust.

9. Construction of 'Container Berth and Bulk Liquid Jetty Ltd at Pipavav - Client: Pipavav Port.

10. Construction of One Multipurpose Berth (Berth No.: 13), Haldia -Client: Kolkata Port Trust),

11. Construction of 'Container Berth and Bulk Liquids Jetty - Client: Gujarat Pipavav Port Ltd.

12. Construction of Marine Liquid Jetty at Ennore -Client: Ennore Tank Terminal Limited

13. Modernization of Jawahar Dock Berths in Chennai Port - Client: Chennai Port Trust

14. Construction of 9th Cargo Berth at Tuticorin - Client: Tuticorin Port Trust

15. Reconstruction of Damaged Portion of 380 mtrs Wharf at Chennai, Client: Chennai Container Terminal Private Ltd.

16. Phase-II modernization at GRSE-Main Unit-Client: Garden Reach Shipbuilders and Engineers Ltd

17. Construction of Integrated Cargo Terminal Facility at Jaigad - Client: Jaigad Ports Infrastructure Private Limited.

18. Marine civil works comprising construction of Jetty and Approach at Kharo Creek - Client: Jaiprakash Associates Limited.

19. Construction of Coal Berths 3 and 4 at Karaikal Port - Client: M/s MARG Limited.

20. Construction of Wet Basin at Mazagon Dock, Client: Mazagon Dock Limited.

21. Design and construction of offshore Civil Superstructure Tuticorin Coal Handling Plant, Client: Larsen & Toubro Limited.

22. Development of Second Container Terminal at Chennai Port - Client: Chennai International Terminal Pvt. Ltd,

23. Design & Detailed Engineering, Supply of materials, Construction, Commissioning and Test Run for off-shore(jetty) and on-shore Civil Works for the Iron Ore port Terminal at Ennore Port -Client : Sical Iron Ore Terminals Limited

b) Road Projects:

1. Construction of Elevated road from Jagraon Bridge to Chand Cinema on old GT road at Ludhiana including its connections (Municipal Corporation, Ludhiana), Widening to 4-Lanes and rehabilitation of existing 2-Lane carriageway of Pallikonda- Ranipet section of NH-46 (KR 3): Package 5 (Km 100.00 to Km 144.2 & 7.5Km)-Client: NHAI

2. Widening to 4 lanes and Rehabilitation of existing 2 lane carriage way of Vaniyambadi to Pallikonda section on NH-46, from km: 50+112 to 100+872 (NHAI), Four laning of km 420.000 to km 44 7.000 of Purnea-Gayakota sub-section of NH-31 in the state of Bihar, Contract Package No: EW/ 12- (BR.) -Client: NHAI

3. Construction of Lock Gate Flyover (Intersection No. 9 ) under Calcutta Transport Infrastructure Development Project -Client : Hooghly River Bridge Commissioners

4. Improvement including strengthening and widening of existing 2-Lane road to 4-lane Dual carriageway I) Km 5+735 to Km 39+960 of NH-22 and ii) Km 0+000 to Km 0+870 of NH21(Ambala -Chandigarh section) in the states of Hariana and Punjub -(Flyover, Bridges & Under Pass works-Client : M/S Gmr Projrct Private Limited

5. Widening and strengthening of existing NH from two lane to four lane from KM 255.02 to KM 223.0 of Assam Border to Gairkatta section of NH31C in the state of West Bengal (Contract Package No.EW-II (WB-1)-Client: NHAI

c) Industrial Projects :

1. Civil Works for construction of three elevated stations Dwarka –I, Dwarka –II and Dwarka –III (DMRC), Civil & Architectural finishing works for Construction of elevated viaduct of length 0.50 km (Approx), one elevated station, one at- Grade station, Ramp, Formation for main line and Stabling yard including Boundary wall for extension of Dwaraka sub city line of DMRC from Sector -9 to Sector -22-Client : DMRC

2. Piling, Civil and Special and finishing items of civil works for Construction of Main Plant & off site civil works for FGUTPP, Unchahar, Stage-III (1x220MW)-Client : M/s Hindustan Steel works Construction Limited/NTPC

3. Construction of Road-Bridge from Amona to Khandola at Goa for PWD Client: The Executive Engineer, Goa.

d) D&B Tunnel Projects & Hydro Project :

1. Leshka Hydroelectric Project, Construction of New Umtru H.E. Project (2X20 MW) in Ri-Bhoi District Meghalaya – Package-1(Civil Works) –Client : Meghalaya Energy Corporation Limited

e) Micro Tunnel Projects :

1. Tallah Palta 64” dia (OD) Dedicated Transmission Main -Client : The Kolkata Municipal Corporation

Assignments: Cost monitoring, Preparation of Budget, Preparation of Monthly result TO & SM, MIS, Subcontract, preparation of CTC, preparation of contractual claim, Extension of Time monitoring, Project management, financial Audit, bank guarantees management, Project Insurance, Coordination & monitoring Site Daily Activities, follow up with sites for progress, periodical site visit for planning & commercial support to the projects under Div-1.

YEARLY REVENUE OF DIV -1: Around Rs. 260 Cr in YE 2013

Engineer (Site)

SKANSKA CEMENTATION INDIA LIMITED (Formerly Kvaerner Cementation India Limited)
CHENNAI
07.2002 - 02.2004
  • Project: Repair and Strengthening of Wharf Structure at Chennai Container Terminal.
  • Client: Chennai Container Terminal
  • Handled various responsibilities including site execution and planning,
    quantity surveying tasks,
    commercial operations management,
    billing procedures coordination,
    subcontractor supervision
    and contract administration.

Graduate Trainee Engineer (Site)

SKANSKA CEMENTATION INDIA LIMITED (Formerly Kvaerner Cementation India Limited)
MUMBAI
12.2001 - 06.2002
  • Project: Widening of existing 600m Wharf by 5m and Supply & Installation of additional bollards along NSICT quay line at NSICT.
  • Client: Nhava Sheva International Container Terminal
  • Executed site assignments involving planning, quantity surveying, commercial tasks, billing activities, subcontracting responsibilities, and contract management.

Education

B.E-CONSTRUCTION ENGINEERING -

JADAVPUR UNIVERSITY
KOLKATA
01-2001

Higher Secondary Education -

W.B.C.H.S.E
INDAS, BANKURA
01-1996

Secondary Education -

W.B.B.S.E
INDAS, BANKURA
01-1994

Skills

  • Adaptability
  • Time Management
  • Relationship Building
  • Professionalism
  • Contract Negotiation
  • Project Budgeting
  • Cost Estimates
  • Construction Management
  • Contract Administration
  • Subcontractor Management
  • Value Engineering
  • Cost Control Management
  • Revenue Forecasting
  • Cost Control
  • Project Planning
  • Claim Management
  • Insurance Claim under CAR & TPL

Affiliations

  • Sports : I have done black belt in Karate. Participated many tournaments.

Accomplishments

  • Sports :. Participated many tournaments and owned Awards

Languages

Bengali
First Language
English
Advanced (C1)
C1
Hindi
Elementary (A2)
A2

Achievement as Division Planning, Commercial & Contracts Head :

a) REVNUE growth from YE’2013 to YE 2023-24 : 900%

b) Site Margin Growth from YE’2013 to YE 2023-24 : 1500%

c) Net Cash Growth from Feb 2013 to YE 2023-24 : Substantial growth

d)  Order Booking growth from Feb’2013 to YE 2023-24 : 1000 %

e) Variation and Claims realization:

1. Claim & Variation Realization of Goa Bridge Contract

2. Claim & Variation Realization of KR2 & KR3 Projects

3. Claim & Variation realization of UG2, Kolkata Metro Project

4. Claim & Variation realization of BMRCL, Bangalore Metro Project

5. Insurance claim realization of Umtru Project : Rs. 200 L

6. Insurance Claim realization of T1 Katra Tunnel : Rs. 800 L

7. Insurance Claim realization of UG2, Kolkata Metro Project : Rs. 20 Cr and in process

Timeline

Planning, Commercial & Contracts Head (Division)

ITD CEMENTATION INDIA LIMITED
02.2013 - Current

Planning and Commercial Engineer (Division Office)

ITD CEMENTATION INDIA LIMITED (Skanska Cementation India Limited)
03.2004 - 01.2013

Engineer (Site)

SKANSKA CEMENTATION INDIA LIMITED (Formerly Kvaerner Cementation India Limited)
07.2002 - 02.2004

Graduate Trainee Engineer (Site)

SKANSKA CEMENTATION INDIA LIMITED (Formerly Kvaerner Cementation India Limited)
12.2001 - 06.2002

B.E-CONSTRUCTION ENGINEERING -

JADAVPUR UNIVERSITY

Higher Secondary Education -

W.B.C.H.S.E

Secondary Education -

W.B.B.S.E
ANUPAM SENGUPTAPlanning, Commercial and Contracts Manager