Sincere and versatile professional with experience of approx 12 years in Electrical Project, Erection & Commissioning, Operation, Maintenance, Installation, Breakdown Analysis, Troubleshooting, Electrical Functions, Safety and Management. Focused and hardworking professional equipped with thorough knowledge & Technical understanding coupled with an analytic identifying problems of equipment that may cause interruption in smooth running of plant and carry out modification to minimize downtime & increase efficiency of system. An effective communicator with execellent management skills and strong analytical, leadership, decision making, problems solving & organizational abilities.

Overview

12
12
years of professional experience

Work History

Deputy Manager E&I

BNK POWER SOLUTION PRIVATE LIMITED
08.2023 - Current

CLIENT :: ALKYL AMINES CHEMICAL LTD.

  • Responsible For Complete Electrical Operation and maintenance of 32 & 30 TPH Boiler.
  • Responsible for monitoring, Operation and maintenance of 3nos of 2500kva Transformer.
  • Responsible for ESP Operation and Maintenance.
  • Responsible for VCB AND ACB Operation and Maintenance .
  • Responsible for HT,LT motors and HT ,LT Panels.
  • Responsible for Electrical Preventative Maintenance Work.
  • Analyzed and reported performance data, translating findings into practical improvement actions.
  • Conferred with customers each day to maintain current understanding of needs and preferences, resolve issues, and promote brand loyalty.
  • Created reports and analyzed and interpreted data.
  • Enhanced supervisory and leadership abilities by working closely with supervisor.
  • Supported general manager in loss prevention efforts.

Senior Electrical Engineer

N J Renewable Energy Pvt.Ltd.
12.2022 - 07.2023

CLIENT :: CEAT LTD.

  • Responsible for Commissioning of Dry and oil type transformer.
  • Responsible for Commissioning of HT and LT panels.
  • Responsible for Commissioning of HT and LT motors.
  • Responsible for Commissioning of 6.6kv HT switchboard.
  • Responsible for Commissioning of VFD panels.
  • Responsible for Commissioning of ESP transformer and ESP panel.
  • Responsible for Commissioning of MIGI RAPPER PANEL.
  • Produced detailed performance reports from analysis data, delivering targeted solutions to electrical system faults.
  • Coordinated site setup, managing electrical installers.
  • Supported construction and commissioning processes, developing robust, reliable electrical and electromechanical designs.
  • Provided innovative, good-value electrical solutions to niche project requirements, enhancing client satisfaction and loyalty.
  • Identified and investigated recurring electrical issues, seeking prompt resolutions to minimise further disruption.

Manager cum Director

Pasa Power Energy Solutions PVT.LTD
04.2018 - 06.2021
  • Managed a team of employees, verifying compliance with company regulations and ensuring that Projects were completed
  • Time and with in budget
  • Oversaw the annual Financial audit and assist with budget
  • Responsible for Erection and Commissioning of new 11kv line and 33kv line
  • Responsible for Erection and Commissioning of 25 KVA to 100 KVA transformers
  • Strengthening work of 11 kv and 33 kv line
  • Ensure for proper safety during work.

Senior Electrical Engineer at

ENGINEERING AND CONSULTANCY SERVICES
07.2016 - 03.2018
  • Commissioning and Maintenance of 2.5MW Generator
  • Commissioning and Maintenance of HT & LT motors
  • Commissioning and Maintenance of HT & LT Panels
  • Responsible for monitoring the running equipment
  • Commissiong and Maintenance of VFD panel
  • Responsible for done the Maintenance of Electrical equipments in shut down condition
  • Ensure the proper safety during work.

E&I Engineer

PT.IOT EPC, Indonesia.
12.2015 - 06.2016
  • INDONESIA, 75000
  • CBM DIESEL STORAGE TANK., Sangatta, kalimanthan timur, Erection and Commissioning of 1250kva transformer
  • Erection and Commissioning of Dry type transformers 100kva and 30kva
  • Erection and Commissioning of 11kv HT panel
  • Erection and Commissioning of various types of LT panels
  • Erection and Commissioning of Automatic power factor controller panel 400kvar
  • Commissioning of UPS panel.
  • Ensure proper safety during work.

E&I Engineer

IOT INFRASTRUCTURE & ENERGY SERVICES LTD
07.2014 - 12.2015
  • Commissioning of 370mva, 400/24 kv Generator transformer, 31 mva 24/6.9kv
  • Commissioning of 2.5mva 6.6/4 kv dry type transformer
  • Commissioning of 6.6/4 kv oil type transformer
  • Commissioning of HT and LT panels
  • Commissioning of HT motors up to 6 mw & LT motors
  • Commissioning of FBT panels
  • Commissioning of Rectifier transformer in ESP
  • Ensure proper safety during work.

Electrical Engineer

VANDANA VIDHYUT LTD.
03.2012 - 01.2014
  • Involvement in Commissioning and Synchronization of Generator 135 MW.
  • Involvement in Testing and commissioning of 180 MVA, 420/13.8 KV Generating transformer ONAF type, 25 MVA, 13.8/6.9 KV UAT, 40 MVA,420/6.9 KV station transformer, 2 MVA distribution transformers.
  • Testing and commissioning of Generator and turbine Auxiliaries.
  • Commissioning of AVR panel, synchronization panel, generator relay protection panel (ERL make).
  • Commissioning and load transfer with Fast bus transfer system of Aartech make (BTS 2000).
  • Commissioning of HT & LT panels (L&T make) from local and DCS with Logic checking and modification and control drawing modification both.
  • Testing and commissioning of HT motors up to 2600 KW and LT motors (both AC and DC type).
  • Commissioning of gravimetric feeders.
  • Testing and commissioning of L&T ungears VD4 VCB HT breaker of 12KV up to 4000A.
  • Commissioning of ESP transformers, TRCC panels, PLC system (Allen Bradley), rapping schemes for ESP. Contractor and manpower management.

Education

Bachelor of Technology - Electronics and Instrumentation

DR. B.C ROY ENGINEERING COLLEGE
Durgapur, WB
07.2010

Skills

  • Time Management
  • Leadership Skills
  • Ability to Multitask
  • Fast Learner
  • Computer Skills
  • Communication Skills
  • Ability to Work in a Team
  • Microsoft Word
  • Instrumentation
  • Microsoft Excel
  • Team Management
  • Courses
  • Three weeks training on PLC Programming

Timeline

Deputy Manager E&I

BNK POWER SOLUTION PRIVATE LIMITED
08.2023 - Current

Senior Electrical Engineer

N J Renewable Energy Pvt.Ltd.
12.2022 - 07.2023

Manager cum Director

Pasa Power Energy Solutions PVT.LTD
04.2018 - 06.2021

Senior Electrical Engineer at

ENGINEERING AND CONSULTANCY SERVICES
07.2016 - 03.2018

E&I Engineer

PT.IOT EPC, Indonesia.
12.2015 - 06.2016

E&I Engineer

IOT INFRASTRUCTURE & ENERGY SERVICES LTD
07.2014 - 12.2015

Electrical Engineer

VANDANA VIDHYUT LTD.
03.2012 - 01.2014

Bachelor of Technology - Electronics and Instrumentation

DR. B.C ROY ENGINEERING COLLEGE
Anup Patel (Electrical Engineer)