Summary
Overview
Work History
Education
Skills
Personal Information
Languages
Disclaimer
Industries
Summary Of Experience
Certification
Languages
Websites
Timeline
Generic

Anurag Gautam

Rewa

Summary

Dynamic Senior Engineer with extensive experience at Megha Engineering & Infrastructures Ltd, specializing in pump installation and commissioning. Proven track record in project management and quality assurance, successfully executing complex hydraulic systems. Adept at team collaboration and client engagement, ensuring safety compliance and operational excellence in high-stakes environments.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Senior Engineer E&M

Megha Engineering & Infrastructures Ltd
Hyderabad
04.2021 - Current
  • Erection and Testing and Commissioning work Flowmore make Vertical turbine pumps 2.1 MW X 3 Nos and 1 MWX 3 Nos Single stage and 3 stage vertical turbine pumps Primary filtration work for delivery system and 2.2 Meter dia manifold, filtration system and flowmeter erection work doing in Lower suktel Odisha site.
  • And maintenance work Horizontal pumps and Micro-Klein filtration at Jajpur DMF Cluster site.
  • Project completed- (1) DMF Cluster Project Odisha (10 site) (2) Lower Suktel Project UGPL Balangir Odisha
  • Our key role in under E&M department taking responsibilities site electro-mechanical execution work
  • Monitoring Pump erection panel erection filtration system and Force water lubrication system execution work.
  • Prepare material requirement list as per drawings and send material requirement to planning and HO
  • Testing and Commissioning pump motor EOT crane and filtration system, and all other E&M Equipment's.
  • Doing site execution work like stop log gate, sluice gate and semi- gantry crane Erection work.
  • Preparing work progress report and sent to planning department day by day for E&M Billing purpose.
  • Maintain proper records material reconciliation and daily DPR.
  • Working effectively with contractors, engineers and clients to ensure quality and safety standards are met.

Engineer E&M

Megha Engineering & Infrastructures Ltd
Hyderabad
07.2017 - 04.2021
  • Operation & Maintenance 24 no's Vertical turbine pump make Kirloskar & wpil Pump Capacity 10m3/sec and synchronous motors of 4.7 mw BHEL & SHANGAI motors.
  • And other Hydraulic OPU system power pack and cooling water system.
  • 8 MLD & 4 MLD WTP plants Erection and maintenance work.
  • Project completed- (1) Pattisam LIS Andhra Pradesh (2) Chintalpudi Lift irrigation scheme AP
  • Carried out the Erection testing and commissioning vertical Turbine pumps of capacity 10m3/sec and synchronous motors of 4.7 mw BHEL & SHANGAI motors.
  • Carried out the Maintenance of cooling water system WTP plant other pump set. 8mLD & 4 MLD
  • Carried out the 2000mm BF Valves assembly and Hydraulic OPU system Testing, & commissioning.
  • Carried out 2070 M3/hr vertical turbine pump erection and commission work.
  • Carried out 2 meter length 1.5 width sluice gate trash rack gate erection.
  • Supervised MS pipe DI pipe line work and HDPE pipe laying work.
  • Report the Daily Progress to concern HOD.
  • Have a good knowledge about processing Equipment's.

Mechanical Engineer

Hydro Power Services
Hyderabad
12.2014 - 06.2017
  • Erection, Testing and Commissioning of 3 x 7.5 mw Kaplan turbine, from Pathri site Haridwar Ganga Canal and Maintenance work of 3 x 42 mw vertical Francis turbine from Myntdu leshyka hydro power project, Meghalaya.
  • Testing and commissioning of Hydraulic OPU Systems, cooling water system, Dewatering pumps and Fire and safety controls Equipment'.
  • Project Name - 1- Pathri hydroelectric Project UGVNL Haridwar Utharkhand 2- Myntdu Leshyka Hydroelectric Project Meghalaya
  • Possess strong experience in Erection of Kaplan turbines of 7.5 MW (ANDRITZ) to hydroelectric project and its auxiliaries.
  • Carried out the Erection testing Kaplan turbines and alignment of 24 guide vane and Set up the Runner gap from bottom Ring to Runner Blade.
  • Alignment of Thrust Collier and Thrust bearing and Final assembly of Oil header System for opening and closing the runner blades.
  • Setup the servomotor system for opening and closing of guide vanes.
  • Possess Experience of making of cooling water system to heat exchanger and water Flow pressure system.
  • Synchronous motors and guide and thrust bearing of Hydro Project.
  • Carried out the erection alignments of Draft tube liners spiral casing and pit liner.
  • Possess the Experience in erection, testing commissioning of firefighting system.
  • Carried out the Installation of thrust bearing and guide bearing Instrument like RTD.
  • Responsible for material handling & manpower planning.
  • Possess interpersonal skills to co-ordinate with other section heads.
  • Enplaning the work details to foremen and Technicians to do the work in safe manner.
  • Reviewing of applicable documents like Drawing Quality Assurance, plans and Measurements.

Education

B.Tech - Mechanical Engineering

RGPV University
Bhopal, MP
06-2014

Intermediate -

MP Board
REWA, MP
03-2009

SSC -

Board of Secondary Education
REWA
03-2007

Skills

  • Pump installation and commissioning
  • Equipment maintenance and testing
  • Filtration and hydraulic systems
  • Project management and reporting
  • Quality assurance and safety compliance
  • Technical documentation and drawings
  • Team collaboration and management
  • Time management and problem solving
  • Client relations and engagement
  • Technical proficiency and expertise
  • System integration and engineering design
  • Process improvement strategies

Personal Information

  • Date of Birth: 02/07/93
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Languages

  • Hindi
  • English

Disclaimer

I hereby declare that the above written particulars are true to the best of my knowledge and belief.

Industries

  • Hydro Power Projects
  • Lift Irrigation Projects
  • WTP Plants
  • Drinking water projects
  • STP plant

Summary Of Experience

Having a period of 11 years of direct experience in the field of Mechanical systems. I dealt with Installation, testing commissioning and maintenance of Vertical Turbines Pumps Flowmore make 500KWx4, and Jyoti make Induction motors kirloskar(KBL) make VT pumps of 4.7MWx24 no's and its Synchronous BHEL Motors. Planning and scheduling of various maintenance and operational jobs for the concern Hydro Electric Project of hosting Company& VT pumps. Supervised HDPE DI Pipe Line laying Work, MS pipe line work and 1 Meter Dia BF valve Installation and MS pipe line hydro testing work. I have also done Erection, Testing and Commissioning of 3 x 7.5 mw Kaplan turbine, from Pathri site Haridwar Ganga Canal and Maintenance work of 3 x 42 mw vertical Francis turbine from Myntdu Leshyka hydro power project, Meghalaya. Testing and commissioning of Hydraulic OPU Systems, cooling water system, Dewatering pumps and Fire and safety controls Equipment.

Certification

  • Project management
  • SAFETY ACCOMPLICE
  • QUALITY ASSURANCE

Languages

Hindi
First Language
English
Advanced (C1)
C1

Timeline

Senior Engineer E&M

Megha Engineering & Infrastructures Ltd
04.2021 - Current

Engineer E&M

Megha Engineering & Infrastructures Ltd
07.2017 - 04.2021

Mechanical Engineer

Hydro Power Services
12.2014 - 06.2017

B.Tech - Mechanical Engineering

RGPV University

Intermediate -

MP Board

SSC -

Board of Secondary Education
Anurag Gautam