Summary
Overview
Work history
Education
Skills
Languages
Timeline
Generic
Aravinth Tiruchengodu Subramaniam

Aravinth Tiruchengodu Subramaniam

Bengaluru,India

Summary

Experienced in plant operations management with a strong focus on parts and product inventory management. Demonstrates expertise in budgeting and estimating capacity, ensuring operational efficiency through advanced process optimisation. Skilled in machine maintenance, contributing to seamless production workflows. Aims to leverage operational budgeting competence to drive strategic improvements and enhance productivity within dynamic industrial environments.

Driven professional with knack for strategic planning and team leadership, well-suited for Operations Manager role. Skilled in project management and process optimisation, with strong communication and problem-solving abilities. Ready to streamline operations and elevate organisational performance.

Overview

22
22
years of professional experience

Work history

Senior manager

Reliance Consumer Products Limited
Bengaluru, Karnataka
2025.09 - Current
  • Managed end to end greenfield backward integration project implementation with preforms, closure and blown film lines for 2 sites
  • Worked closely with procurement and operations to understand volume requirements for beverage lines
  • Defined technical scope of supply for all backward integration equipment as per required volumes
  • Worked closely with OEMs to select most suitable machine as per requirements
  • Contributed to budget preparation for backward integration project
  • Worked closely with OEMs to finalise optimised layout for equipment’s
  • Worked with cross functional teams to finalise building design, electrical design and utility design
  • Designed new greenfield backward integration plant with

- Approved budge of $35 million

- India’s first 160 cavity preform machines and 96 cavity closure machines at each site

- Conversion capacity of 28000MT (2 billion) PET preforms, 3600MT (1.3 billion) HDPE closure and 5700MT shrink film at each site

- 4x160 cavity preform machine, 3x96 cavity closure machines and 1x700kg/hr blown film line for each site

- Fully integrated backward integration plant with beverage plant

- Fully automated FG handling from backward integration machines till beverage plant

- RM handling direct from truck to silo and silo to machine

- Silo to handle 960MT PET, 250MT HDPE and 300MT blow film resins

  • Directed project management activities for timely delivery of projects.
  • Facilitated cross-functional collaboration leading to improved pr timelines.
  • Negotiated major contracts, achieving favourable terms for company.
  • Oversaw complex engineering projects for successful and timely completion.
  • Collaborated with operations team to provide specialist technical advice on backward integration project.

Operations manager

Future Plast Industries
Abu Dhabi, UAE
2019.09 - 2025.08
  • Managed plant operations covering production maintenance and production planning daily.
  • Mentored QC team members to strengthen quality checks and follow-through.
  • Led reporting lines: 2 section heads, 2 supervisors, 8 operators, 52 helpers.
  • Ran 6 x 96-cavity Husky HPP 4.0 and HPP 5 preform machines.
  • Achieved 30000 mt per year preforms output using Husky machines.
  • Operated 4 x 64-cavity and 2 x 32-cavity SACMI closure machines.
  • Achieved 5500 mt per year closures output from SACMI machines.
  • Tracked KPIs covering OEE, machine availability, quality, hold, and scrap.
  • Built yearly production forecast using sales forecast inputs for planning.
  • Prepared production budget and maintenance budget for department approval.
  • Produced daily and monthly production reports and created action plans.
  • Improved low-OEE machine performance using daily and monthly planning actions.
  • Planned daily and monthly production schedules aligned to sales forecast.
  • Scheduled preventive maintenance using production forecast requirements and timing.
  • Troubleshot breakdowns and performed root cause analysis with teams.
  • Supported supervisors and technicians during troubleshooting for faster recovery.
  • Investigated PET performs and closure process troubleshooting to optimise cycles.
  • Reduced cycle time through process optimisation across PET and closure lines.
  • Optimised manpower utilisation by coordinating with all internal departments.
  • Coordinated with OEMs for new machine and mould installations.
  • Coordinated with OEMs and suppliers for breakdown support and scheduling.
  • Scheduled service technicians with OEMs and suppliers using root cause analysis.
  • Delivered support for OEM new projects, new product drawings.
  • Managed new product approval and FAT approvals with OEMs and teams.
  • Handled general plant maintenance across production and support areas.
  • Implemented general plant improvements for material flow and finished goods flow.
  • Partnered with QC team to identify and fix finished product quality issues.
  • Set yearly objectives and evaluated performance on half-yearly reviews for teams.
  • Planned training and OJT based on individual needs across technicians.
  • Reviewed new talent during probation and acted on review outcomes.
  • Maintained ERP accuracy with section heads and production transactions.
  • Matched monthly stock quantities for RM, PM, and FG with system records.
  • Collaborated with HSE team and local teams for safety compliance.
  • Ensured compliance with FSSC 22000 version 5 standards at all times.

Operations manager

Empak Africa Ltd
Port Louis, Mauritius
2018.08 - 2019.09
  • Manage plant operations, production maintenance, quality, safety, and administration under GM.
  • Report plant performance and manage business development activities across operations.
  • Lead 3 production junior managers, 1 maintenance junior manager, and QC lead.
  • Manage HR administrator and coordinate 7 operators, 4 technicians, and 4 QC technicians.
  • Run 3 72-cavity Husky HPP machines and 1 48-cavity SACMI closure system.
  • Operate rotary pad printing and laser marking machines for promotional closure output.
  • Deliver 60 mt/day preforms and 4 mt/day closures while monitoring OEE.
  • Maintain 95% OEE by aligning production plan execution with maintenance scheduling.
  • Keep 0 quality complaints by applying stability, tooling, and quality protocols.
  • Optimise production by coordinating sales and planning with preventive maintenance.
  • Secure raw material availability with planning to match production timelines.
  • Optimise manpower utilisation, overtime control, and transportation cost with department managers.
  • Meet shipping deadlines by coordinating with SCM for production-plan alignment.
  • Achieve monthly tonnage budget by coordinating shipping completion and raw-material availability.
  • Set yearly objectives and review performance every 6 months for JMs and technicians.
  • Plan training and OJT based on individual needs across team members.
  • Conduct probation reviews and apply actions based on review outcomes.
  • Maintain accurate ERP usage by ensuring all transactions follow production requirements.
  • Verify monthly RM, PM, and FG stock matches ERP system quantities.
  • Implement safety policies through collaboration with HSE and local teams.
  • Maintain local approvals by coordinating with government departments for permits and renewals.
  • Shortlist, interview, and support offers for new Jkts, operators, and technicians.
  • Support FSSC 22000 version 4.1 compliance across quality systems.
  • Maintain facilities and safety equipment with landlords and local contractors.
  • Process supplier payments by coordinating with finance on payment terms.
  • Plan training for all team members with targeted schedules.
  • Deliver local projects and facility improvements through contractor coordination.
  • Maintain expat accommodation by optimising occupancy based on expat headcount.
  • Approve local expenses and invoices below $ 5000 with delegated controls.

Production and maintenance manager

Oasis Flower Plant for Plastics
Al Kharj, KSA
2017.06 - 2018.07
  • Managed plant operations covering production and maintenance activities daily.
  • Led 6 section heads, 6 supervisors, 10 operators, and 35 helpers.
  • Oversaw 13, 96, and 144 cavity HPP 4 and HPP 5 machines.
  • Managed 8, 72, and 96 cavity Hycap machines with closure support.
  • Coordinated 10 Corvaglia closure moulds achieving 220mt preforms daily.
  • Tracked KPIs including OEE, machine availability, quality, hold, and scrap.
  • Built yearly production forecasts from sales forecast inputs.
  • Prepared production and maintenance department budgets for upcoming periods.
  • Compiled daily and monthly production reports and action plans for low OEE.
  • Planned daily and monthly production schedules against sales forecast requirements.
  • Scheduled preventive maintenance using production forecasts and machine priorities.
  • Investigated breakdowns through troubleshooting and root-cause analysis support.
  • Assisted supervisors and technicians during troubleshooting activities for faster recovery.
  • Diagnosed preform and closure process issues to remove recurring faults.
  • Optimised cycle time by improving preforms and closure workflow.
  • Planned manpower and allocated shifts based on production plans and overtime.
  • Managed overtime carefully to match production targets and staffing needs.
  • Worked with OEMs to coordinate new machine and mould installations.
  • Coordinated OEM and supplier troubleshooting support and service technician scheduling.
  • Conducted root-cause analysis with OEMs during service interventions.
  • Collaborated with OEMs on new projects, drawings, and product approvals.
  • Managed drawing reviews and FAT approvals for new products.
  • Oversaw general plant maintenance to keep equipment running steadily.
  • Improved material flow for plant areas and finished goods movement.
  • Worked with QC team to reduce quality issues on finished products.

Service manager

Husky Injection Molding Systems
Jakarta , Indonesia
2007.03 - 2017.06
  • Managed customer support relationships and resolved service requests daily.
  • Led a team of 12 people across South East Asia.
  • Handled KPI ownership: mean time to repair, first time fix, service revenue.
  • Managed spare parts revenue tracking and replenishment follow-up.
  • Coordinated refurbishments, upgrades, and retrofits across customer sites.
  • Executed refurbishments successfully through technician scheduling and site readiness.
  • Scheduled technicians and coordinated customer visit timings.
  • Identified potential refurbishment needs during plant visits.
  • Identified asset renewal opportunities to reduce repeat service issues.
  • Supported engineering team and project engineer for refurbishment orders.
  • Defined refurbishment scope with engineering team during order planning.
  • Managed service team management, team building, and development activities.
  • Set regional service strategy for consistent delivery and accountability.
  • Identified training needs and planned training sessions for teams.
  • Coordinated cross-functional work to align service delivery plans.
  • Drove permanent fix work to resolve recurring issues permanently.

Service engineer

Larsen and Tubro Ltd
Coimbatore, India
2006.09 - 2007.03
  • Installation of injection molding M/C’s from 40 to 800 tons & auxiliary equipment, central conveying systems
  • Handling customer complaints
  • Handling warranty service
  • Handling non-warranty services
  • Spare order generation
  • Auxiliary equipment sales
  • Sales of injection molding M/C’s
  • Critical spare maintenance in office
  • Design of central conveying
  • Design of plant layout as per customer requirement

Sales and Service Engineer

Excel Services
Coimbatore , India
2004.01 - 2006.08
  • Installation of injection molding M/C’s from 40 to 800 tons & auxiliary equipment, central conveying systems
  • Handling customer complaints
  • Handling warranty service
  • Handling non-warranty services
  • Spare order generation
  • Auxiliary equipment sales
  • Sales of injection molding M/C’s
  • Critical spare maintenance in office
  • Design of central conveying
  • Design of plant layout as per customer requirement

Education

B Tech - Mechanical Engineering

Rajasthan Vithiyapeth

Skills

  • Greenfield project design
  • Greenfield project execution
  • Plant operations management
  • Parts inventory management
  • Product inventory management
  • Budgeting and estimating capacity
  • Operational budgeting competence
  • Machine maintenance expertise
  • Advanced process optimisation

Languages

English
Fluent
Hindi
Fluent
Tamil
Native

Timeline

Senior manager

Reliance Consumer Products Limited
2025.09 - Current

Operations manager

Future Plast Industries
2019.09 - 2025.08

Operations manager

Empak Africa Ltd
2018.08 - 2019.09

Production and maintenance manager

Oasis Flower Plant for Plastics
2017.06 - 2018.07

Service manager

Husky Injection Molding Systems
2007.03 - 2017.06

Service engineer

Larsen and Tubro Ltd
2006.09 - 2007.03

Sales and Service Engineer

Excel Services
2004.01 - 2006.08

B Tech - Mechanical Engineering

Rajasthan Vithiyapeth
Aravinth Tiruchengodu Subramaniam