Summary
Overview
Work History
Education
Skills
Timeline
Software
Certification
Generic
Narashima Pulipati

Narashima Pulipati

Senior Manager
Hyderabad

Summary

Strategic Senior Manager - Powering Excellence in Turbines, Generators & Rotatory Equipment,Dampers, Windbox etc... - Driving Business Growth & Efficiency through Innovative Implementation - Cultivating Open Culture - Seeking Thrilling Next Career Chapter with a Growth-Oriented Force

Overview

15
15
years of professional experience
3
3
Languages
17
17
years of post-secondary education
3
3
Certificates

Work History

Service Manager

Zed engines India private limited
Libya
05.2022 - Current

My responsibilities:

  • Estimating project costs, enhancing financial acumen and bid competitiveness.
  • Aligning project scopes and schedules with POs, ensuring seamless flow.
  • Leding comprehensive project management, overseeing construction and milestones.
  • Conducted regular project meetings, assessing progress and assigning tasks.
  • Ensuring flawless equipment installation, compliance, and meticulous documentation.

Project Handed in M/s Zed Engines Pvt Ltd:

  • ⌚ (May 2023 - Till date)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: GECOL (Ecco)
    πŸ—οΈ Location: 375MW Alkhalij Power Plant Sirte, Libya (North Africa)
    πŸ”§ Job: Replacement of critical components in boiler system, including Wind box, Soot blowers, Bottom Hopper, and two Boiler Feed Pumps (BFPs).
  • ⌚ (Oct 2022 - Mar 2023)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: M/s SEC (Saudi Electrical Company)
    πŸ—οΈ Location: PP-13 Power Plant Dhurma, KSA
    πŸ”§ Job: Modification and reinforcement of 6 Nos (six) diverter dampers.
  • ⌚ (May 2022 - Sep 2022)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: M/s SEC (Saudi Electrical Company)
    πŸ—οΈ Location: PP-14 Power Plant Riyadh, KSA
    πŸ”§ Job: Modification and reinforcement of 6 Nos (six) diverter dampers.

Construction Project Manager

M/s Biswas Engineering Company
Chhattisgarh
09.2020 - 09.2021

My Responsibilities Includes:

  • Verified completed projects met approved time, quality, and cost estimates.
  • Managed construction schedules to achieve adequate project labor coverage.
  • Improved cost control through effective allocation of subcontractors and site resources.

Project Handled at M/s Biswas Engineering Private Limited are:

  • ⌚ (Sep 2021 - Oct 2021)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: DVC (Damodar Valley Corporations)
    πŸ—οΈ Location: 2x500mw Kodarma Thermal Power Plant, Kodarma, Jharkhand
    πŸ”§ Job: Major Overhaul of BHEL (KWU) 500 mw Steam Turbine (1 Unit)
  • ⌚ (Mar 2021 - Sep 2021)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: DVC (Damodar Valley Corporation)
    πŸ—οΈ Location: 3x250mw Chandrapura Thermal Power Plant, Chandrapura, Jharkhand
    πŸ”§ Job: Major Overhaul of BHEL (KWU) 250 mw Steam Turbine (1 Unit)
  • ⌚ (Dec 2020 - Mar 2021)
    πŸ‘·πŸ» Role: Project Manager πŸ‘¨πŸ»β€πŸ’Ό
    🏒 Client: Vedanta
    πŸ—οΈ Location: 2x250mw Vedanta Thermal Power Plant, Jharsuguda, Orissa
    πŸ”§ Job: Major Overhaul of Siemens 250 mw Steam Turbine (1 Unit)

Engineer to Assistant Manager

M/s Power Mech Projects Limited
Hyderabad
05.2008 - 01.2020

Power Projects Limited is ISO 2008 CERTIFIED India’s leading Company involved in Erection and commissioning activities in Power, Oil & Gas and Infrastructure industry.

Project Handed at M/s Power Mech Pvt Ltd:

  • ⌚ (Sep 2019 - Jan 2020)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: πŸ’‘ Mitsubishi Hitachi Power Services
    πŸ—οΈ Location: 🏭 2x45mw ADNOC refining (gup) takreer, AI Ruwais, Abu Dhabi UAE (Middle East)
    πŸ”§ Job: Overhaul of MHPS 45MW steam turbine (1 Unit) & Power Cycle Piping service maintenance
  • ⌚ (Mar 2017 - Apr 2017)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: πŸš€ Siemens LLC – PG Power and Gas
    πŸ—οΈ Location: 🏭 744Mw Sohar2 IPP (CCGT), Oman - (Middle East)
    πŸ”§ Job: Forced Outage of SIEMENS V94.3 (1 unit)
  • ⌚ (Jan 2017 - Feb 2017)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: 🏭 Siemens LLC – PG Power and Gas
    πŸ—οΈ Location: 🏭 Barka2 IWPP, Barka(CCGT), Oman-(Middle East)
    πŸ”§ Job: Overhauling of SIEMENS V94.2 (1 unit)
  • ⌚ (Oct 2016 - Dec 2016)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: 🏭 Siemens LLC – PG Power and Gas
    πŸ—οΈ Location: 🏭 Barka3 & Sohar2 IPP(CCGT), Oman -(Middle East)
    πŸ”§ Job: Overhauling of SIEMENS V94.3 (2 units)
  • ⌚ (Jan 2016-Mar 2016)
    πŸ‘·πŸ»β€β™‚οΈ Role: Project Manager
    🏒 Client: βš™οΈ Alstom (GE) Power
    πŸ—οΈ Location: 🏭 4x165 Mw (Gas based power plant) Ruwais Takreer Refinery, Ruwais, Abu Dhabi, UAE-(Middle East)
    πŸ”§ Job: C-Inspection of ALSTOM GT13E2 (1 unit)
  • ⌚ (Nov 2015-Jan 2016)
    πŸ‘·πŸ»β€β™‚οΈ Role: Project Manager
    🏒 Client: 🌊 GE Water & Electricity
    πŸ—οΈ Location: 🏭 6x250 Mw (Gas based power plant) Sabiya Power Plant, Kuwait-(Middle East)
    πŸ”§ Job: Major Inspection(1 unit), CI (5 units) of GE Frame 9FA
  • ⌚ (Apr 2015-Sep 2015)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: πŸŒ€ Gecol (Algec)
    πŸ—οΈ Location: 🏭 4x150 Mw (Gas based power plant) Al Khums, Libya-(North Africa)
    πŸ”§ Job: C-Inspection of ALSTOM GT13E1 (2 units)
  • ⌚ (Dec 2014-Apr 2015)
    πŸ‘·πŸ»β€β™‚οΈ Role: Deputy Manager
    🏒 Client: βš™οΈ BHEL (Bharat Heavy Electrical Limited)
    πŸ—οΈ Location: 🏭 4X100 Mw (Gas based power plant) MARIB Power Plant, Marib, Yemen-(Middle East)
    πŸ”§ Job: Erection of SIMENS V94.2 (1 unit) & Turbine auxiliaries and piping
  • ⌚ (May 2013-Dec 2014)
    πŸ‘·πŸ»β€β™‚οΈ Role: Manager
    🏒 Client: 🏭 SEPCO-I (Power China)
    πŸ—οΈ Location: 🏭 3X660 Mw Thermal Power Plant at Talwandi Sabo, Punjab
    πŸ”§ Job: Erection & Commissioning of SEPCO-1(DONGFENG) 660MW & Turbine house (Turbine, Generator, Condenser, TDBFP, Turbine Aux(Rotary, Static) & Turbine Piping (L.P Piping , H.P Piping , Integral Piping)
  • ⌚ (Feb 2011-May 2013)
    πŸ‘·πŸ»β€β™‚οΈ Role: Deputy Manager
    🏒 Client: βš™οΈ BHEL (Bharat Heavy Electrical Limited)
    πŸ—οΈ Location: 🏭 2 X 500 Mw Thermal Power Plant at Mouda, Nagpur
    πŸ”§ Job: Erection & Commissioning of BHEL(KWU) 500MW & Turbine house (Turbine, Generator, Condenser, TDBFP, Turbine Aux(Rotary, Static), Turbine integral Piping, Full shutdown & overhauling of Turbine Unit-I
  • ⌚ (May 2008-Feb 2011)
    πŸ‘·πŸ»β€β™‚οΈ Role: Engineer
    🏒 Client: 🏭 M/s Reliance Energy Limited (Shanghai Electrical Power Corporation Limited)
    πŸ—οΈ Location: 🏭 2 X 600 Thermal Power Plant RGTPP, HPGCL at Haryana
    πŸ”§ Job: Erection & Commissioning of SEPCL(SEPCL) 600MW & Turbine house (Turbine, Generator, TDBFP, Turbine Aux(Rotary, Static) Turbine integral Piping

Education

Bachelor of Technology -

Koneru Lakshmaiah College of Engineering
Tenali
03.2002 - 03.2006

Board of Intermediate Education -

Modern Junior College
Guntur
03.2001 - 03.2003

SSC - Secondary Education

Board of Secondary Education
Guntur
03.1990 - 03.2001

Skills

    Proficient in Primavera P6

undefined

Timeline

Service Manager

Zed engines India private limited
05.2022 - Current

Construction Project Manager

M/s Biswas Engineering Company
09.2020 - 09.2021

HSE CP -21 By Adnoc

01-2019

Primavera P6

01-2018

PTW CardHolder

05-2017

Engineer to Assistant Manager

M/s Power Mech Projects Limited
05.2008 - 01.2020

Bachelor of Technology -

Koneru Lakshmaiah College of Engineering
03.2002 - 03.2006

Board of Intermediate Education -

Modern Junior College
03.2001 - 03.2003

SSC - Secondary Education

Board of Secondary Education
03.1990 - 03.2001

Software

Primavera P6

Ms Projects

All Ms Office Products

Certification

Primavera P6

Narashima PulipatiSenior Manager