Summary
Overview
Work History
Education
Skills
References
Spouse
Personal Information
Certification
Timeline
Generic
Avinash Sharma

Avinash Sharma

Baran

Summary

Dynamic Senior Manager with extensive experience at Adani Power Limited, excelling in maintenance management and cross-functional team coordination. Proven track record in optimizing safety procedures and enhancing operational efficiency. Skilled in budgeting and vendor management, with a strong focus on achieving key performance indicators and fostering team leadership.

Overview

18
18
years of professional experience
2
2
Certifications

Work History

Senior Manager

Adani Power Limited
Kawai & Raipur
01.2019 - Current
  • Managed 660 MW Supercritical Boiler maintenance activities, ensuring optimal performance through precise parameter monitoring.
  • Oversaw operations of 685 MW Doosan Boiler at Raipur site.
  • Successfully managed departmental budgets and allocated resources to maximize productivity and profitability.
  • Enhanced safety procedures, resulting in safer working conditions for all personnel.
  • Lead – Safety Task Force for High-Risk activities at Plant, SPOC for departmental safety, employee engagement & coordinator for successful implementation of 5S.
  • Trained personnel in equipment maintenance, fostering key skill development and increased team competency.
  • Establish team priorities, maintained schedules and monitored performance.
  • Communicated clearly with team, suppliers and stakeholders to keep everyone on same page and working toward established business goals.
  • Development of Standard Maintenance procedure for each equipment.
  • Root-cause analysis of breakdown and rectification of causes for eliminating repetitive breakdown.
  • Maintenance of Low NOx and Low SOx Burners, Pressure part joint, Critical piping, Torisihima BCP.
  • Modified system and maintenance plans based on project needs and approvals.
  • Responsible for Vendor Development and Spare Planning.
  • CAPEX Scheduler & SPOC for start to end procurement and implementation for MMD.
  • Recording of various parameters and maintain data-bank of breakdown and preventive maintenance for ensuring minimum breakdown and cost optimization.
  • IBR Documentation and Liaisoning with IBR office – Raipur.
  • Exercised leadership capabilities by successfully motivating and inspiring others.

Associate Manager

GMR Chhattisgarh Energy Limited
Raipur
03.2016 - 09.2019
  • Managed a team of engineers and executives along with contract workers for routine and breakdown jobs.
  • Oversaw maintenance of 685 MW supercritical PF boiler pressure parts and ESP, ensuring operational reliability.
  • Established vendor relationships and coordinated spare parts planning to support maintenance activities.
  • Planned execution of maintenance activities.
  • Coordinated with IBR office in Raipur for documentation, ensuring compliance and timely processing.

Assistant Manager

Jindal Power Limited
Tamnar, Raigarh
05.2011 - 03.2016
  • Managed maintenance for 250 MW and 600 MW BHEL PF Boilers and auxiliaries, executing maintenance activities and optimizing operational parameters.
  • Planned and organized manpower, materials, and spares for routine maintenance activities and annual overhauls, ensuring resource availability and efficiency.
  • Executed planning and work during boiler tube leakages and breakdowns to ensure quality outcomes and timely resolution of critical issues.
  • Executed work according to the plan and standard operating procedures.
  • Monitoring the condition of utilities and services to avoid major breakdowns.
  • Ensuring all safety norms during execution of jobs.
  • Executed the monthly action plan to ensure operational efficiency.
  • Managed the Department Integrated Management System (IMS) and contributed as a team member in 5S initiatives.
  • Supervised team of GETs, junior executives, and contractor supervisors.
  • Facilitated monthly meetings with AMC contractor and management for work reviews.

Engineer

SEPCO-1
Bhatinda TSPL
12.2010 - 04.2011
  • Planning, scheduling, monitoring & timely execution of erection and commissioning of mechanical related work.
  • Coordinated with the planning section to obtain necessary documents for erection and commissioning.
  • Coordinated weekly and monthly meetings with sub-contractor to review work progress and set planning for upcoming week, ensuring alignment with overall targeted schedule.
  • Prepared review notes for monthly coordination meetings with client, facilitating clear communication and project updates.
  • Co-ordination with civil department to get release civil foundations for erection of Mechanical equipment.
  • Ensured implementation of safety measures and precautions during erection process, maintaining compliance with safety standards.

Engineer

KPS (known as KEPCO)
HZL - Chittorgarh
04.2008 - 11.2010
  • Planned and maintained steam turbines (80 MW & 77 MW BHEL Single Cylinder) and auxiliaries (2 X 77 MW & 1 X 80 MW) to ensure operational reliability.
  • Maintenance & Overhauling of BFP (6-Stage Centrifugal Pump horizontal pump).
  • Maintenance & overhauling of Condensate extraction pump (CEP).
  • Overhauling of Condenser and also Checking of Tube leakage. (On-Line).
  • Serviced shell and tube type heaters to enhance thermal efficiency and performance.
  • Utilized SAP PM and MM modules to streamline maintenance management processes.
  • Plant Maintenance– FLOC, Equipment, Orders, Master Data , Notification and Spare management.
  • Material Management - Creating PR, NFA, SES , Billing, GRN , Change of modification.

Education

MBA - Executive MBA

Indian Institute of Management (IIM)
Udaipur
05-2028

Advance Diploma in Industrial Safety - Occupational Health And Safety

Maharashtra State Board of Technical Education
Mumbai
05-2026

Bachelor of Engineering - Mechanical Engineering

University of Rajasthan
Jaipur
08-2007

undefined

undefined

Skills

  • Maintenance management
  • KPI management
  • Cost control
  • Contract management
  • Vendor management
  • Stakeholder management
  • CMMS proficiency
  • Timelines and Milestones
  • 5S and ISO
  • Business Analysis
  • Budget oversight
  • Team Leadership
  • Team coordination
  • Scheduling and Coordinating
  • Performance evaluations
  • File management

References

  • Mr. Rambhav Gattu, Ex- Chief Manufacturing officer- Adani Cement, +91-9755000816
  • Mr. Bibhas Karmakar, Head-Mechanical, Adani Power Limited- Raipur, +916269909358

Spouse

Mrs. Kusum Sharma, 

Master of International Business 

Presently - Housewife

Personal Information

  • Child Name: Arav Sharma
  • Notice Period: 60 Days
  • Date of Birth: 06/20/86

Certification

Lean Six Sigma - Green Belt

Timeline

Senior Manager

Adani Power Limited
01.2019 - Current

Associate Manager

GMR Chhattisgarh Energy Limited
03.2016 - 09.2019

Assistant Manager

Jindal Power Limited
05.2011 - 03.2016

Engineer

SEPCO-1
12.2010 - 04.2011

Engineer

KPS (known as KEPCO)
04.2008 - 11.2010

MBA - Executive MBA

Indian Institute of Management (IIM)

Advance Diploma in Industrial Safety - Occupational Health And Safety

Maharashtra State Board of Technical Education

Bachelor of Engineering - Mechanical Engineering

University of Rajasthan
Avinash Sharma