Senior Engineer
M/s.WINSERVE SYSTEMS PRIVATE LIMITED
01.2019 - Current
Experience in managing production activities
Coordinaton with production engineering processes to produce quality of products
Tools and machinery and all Equipments arrangement as per the project job requirement
Document and utilize production procedures to improve company standards
Supervise employees to ensure quality of work and adherence to safety regulations
Plan prepare the assembly work flow chart/Drawing (wiring/testing/final inspection)
Co-ordination with the Managers, Engineers for the getting the Progress of Work, Smooth
Execution of Project within the time frame
Creating test report of documents submission
Supervice and maintain work place clean and maintain PPE on work spot
Maintain the quality standards ISO,IEC,5S,KAIZEN
Leading, training & monitoring the performance of team members to ensure efficiency in process, Follow up and update of the timing plan for each project, coordinating its deployment internally
and providing support to other departments on its implementation
Participate in the industrialization planning for new/modified products, new lines design and
production organization (layouts and material flow) for the site, in coordination with R&D and
Global Management
Identify local suppliers for new equipment and tools
Coordinate procurement and availability on
time, as well as the final installation
Plan and deploy, in coordination with the Engineering team, the implementation of new products
in production, as well as modifications and improvements of the processes coordinating and
supporting the internal activities
Production plan by ensuring optimal utilization of all resources that include manpower and raw
materilas control Panel and power converters
Knowledge of the implementation of various techniques and quality and safety standards for
improving the manufacturing
Arrange and prepare the machinery and tools of the jobs in our line section
Preparation of assembly process protocol, work instruction chart, Testing, Production plan
report
Follow up with vendors for advanced technical support/warranty/service.(tool and machinery)
Inspecting and analyzing malfunctioned mechanical, electrical and Hydraulic components of
wind turbine and performing service to ensure proper working
Electrical and Technical support to O and M Wind Turbine Generators /Control Panels and
Power Converters drives for MW class wind turbines
In coordination with production, quality and engineering, identify needs, challenges and
opportunities for improvement
Support and coordinate all departments to ensure that the modifications and improvements have
been communicated and implemented adequately
Senior Engineer
M/S.LEITWIND SHRIRAM MANUFACTURING PVT LTD
01.2010 - 01.2018
Pvt Ltd is an Indo European Joint Venture between Shriram EPC Ltd., and Leitner Technologies to manufacture world-class Leitwind Electric Generators and Drives.Started off as production and testing engineer
ROLES AND RESPONSIBILITIES, Generator prototype 1.8MW and 2MW capacity assembly and testing
Planning for production materials as per production plan
Monthly /yearly production status update , monthly shortage list & half yearly plan update
BOM preparation with study schematic electrical drawing
Work with different types communication protocols
PROFACEcommunication,RS485,RS232/DEBU optic-isolated interface,CANBUS, MODBUS,Ethernet and PROFIBUS communication
Analyzing, Identify, and resolving the problems in all electrical Equipments
Involving with the Quality team to improve documents of Electrical procedures for installation,
testing and commissioning as per ISO standard
Preparation and submission of all testing and commissioning documents
Implementation of safety procedures / accident prevention / Reporting
ACHIEVEMENTS:
Active involvement in cost reduction by analysing and rectifying failures involving and other statisitical tools
In Tamilnadu and AP projects 15 No’s machine 1.5MW and prototype machine 1.8MW, 2MW.
Education
the 5’s and Kaizen (Continual Improvement). - undefined
2008
B.E - Electrical and Electronics Engineering
Anna University
Diploma - Electrical and Electronics Engineering
2005
DOTE - undefined
2000
S.S.L.C - undefined
State Board TamilNadu
Skills
Ability to deal with people diplomatically
Willingness to learn
Team player
Good leadership qualities
Adapt myself to any situation
OPERATING SYSTEM :
Utilities:
Auto CAD, MS Office 2007& 2010 (Word, Excel and PowerPoint)
Operating Systems: Windows XP, Windows 7 and Windows 10
Timeline
Senior Engineer
M/s.WINSERVE SYSTEMS PRIVATE LIMITED
01.2019 - Current
Senior Engineer
M/S.LEITWIND SHRIRAM MANUFACTURING PVT LTD
01.2010 - 01.2018
the 5’s and Kaizen (Continual Improvement). - undefined