Summary
Overview
Work History
Education
Skills
Accomplishments
DECLARATION
Timeline
Generic
Balakrishnan L

Balakrishnan L

Chennai

Summary

Be a successful, result-oriented, self-motivated go-getter; work enthusiastically along with the team, taking part in challenging assignments with sincerity and dedication that dynamically work towards the growth of the organization and career.

Proved my professionalism in the Civil & Marine Civil Engineering (On Shore, Off Shore) field with 27 years of experience in reputed Organizations and involved in signature projects like Development of Harbors, Break Waters, Bridges, Diaphragm walls Marine Infrastructures, under water repairing & micro concrete works, Marine Drilling, Cementing, Pressure Grouting, Pre stressing & Post tensioning, Metro Rail(MRTS) and Multi storied Mega residential township projects.

Overview

27
27
years of professional experience

Work History

Manager Executive

ITD Cementation India Limited
03.2013 - 07.2024
  • Execution of all On & Off shore Marine civil works like pile boring, concreting, Jack-up, Gantry activities, Diaphragm wall, Drilling, Grouting & Rock Anchoring, Trestle & Precast beam, slab casting & erection, Batching Plant erection, Gantry Erection, Jetty Deck Slab Concreting, Bollard & Fender Alignment fixing. Break water accropode Profile making & armour rock dumping, Under water repairing & Micro concreting
  • Projects: Construction of Gangavaram Port, Phase II- Project Value 260 crores construction of multipurpose berths (Berth VI, Berth VII, Berth Berth IX at vishakapatnam
  • Construction of container and multipurpose berth at Mumbai JNPT port Trust (Narva-sheva) (Project value 300 crore)
  • Construction of Diaphragm wall for Adani Ennore container Terminal (project value 350 crores)
  • Construction of Diaphragm wall for coal Berth II (CBII) at Ennore Kamarajar Port (Project value 300 crores)
  • Phase I & II Jetty Construction for L&T MFFK (Kattupalli)
  • Construction of IOCL Captive Jetty for LNG (Project value 680 crores)
  • Construction of captive coal Jetty with unloading facilities for TANGEDCO UDANGUDI SUPER CRITICAL TERMAL POWER Project, Tamil Nadu approach bridge at 5 km length included 939 marine piles and 915 m Break water with 2 MT Rock boulders and 1 lakh cum of RCC.
  • New Bamban Bridge for RVNL (Project value 280 Crores)
  • ADANI – VIZHINJAM BREAK WATER PROJECT KERALA(Project value 513 Crores). Construction of Rubble mound Break water (2.42 km) and balance outer harbour works and berth construction.
  • Construction of 4 service berths & Break water works for Indian Navy Project Varsha(Project value 750 Crores)

Deputy Manager

Hiranandani Palace Garden Pvt Limited
01.2011 - 02.2013
  • Windsor Twin Tower in charge for construction of 12000 sq ft residential building. (27 floors – 4 BHK)
  • To ensure timely completion of project
  • Achieved a cycle time of 7 days between successive slabs.
  • Execution of all finishing activities.
  • Re-viewing Sub-contractors construction schedule.
  • Monitoring resources reports (weekly and monthly) for client and senior management.
  • Preparation of management reports for Top Management meeting.
  • Ensuring safety standards in all construction activities.
  • Assisting the project team in daily planning and monitoring.
  • Attending technical/progress meetings or sub-contractors meeting.
  • Advising Sub-contractors on technical matters.
  • Checking and verifying supervisor's daily progress records.
  • Implementation of services with the help of experts.
  • Project management at site and office level
  • Monitoring of reconciliation statements for all construction materials.
  • Preparing IMS auditing reports.
  • Co-ordination with Electrical and HVAC and Fire Fighting.
  • Project: Integrated Residential township in 250 acres

Assistant Manager

Lanco Infratech Pvt Ltd
12.2006 - 12.2010
  • In-charge for tower LH2 -construction of 13000 sqt 35 floor 4 BHK residential building comprising of high grade concrete stating from M60 with modern form techniques viz.TLD (Chinese formwork system)
  • To ensure timely completion of project
  • Had achieved a cycle time of 7 days between successive slabs.
  • Execution of all Finishing works
  • Ensuring safety standards in all construction activities
  • Re-viewing Sub-contractors construction schedule.
  • Monitoring resources reports (weekly and monthly) for client and senior management.
  • Preparation of management reports for Top Management meeting.
  • Assisting the project team in daily planning and monitoring.
  • Assisting QA/QC team to prepare method of statements.
  • Attending technical/progress meetings or sub-contractors meeting.
  • Advising Sub-contractors on technical matters.
  • Ensuring Sub-contractors compliance to specifications.
  • Checking and verifying supervisor's daily progress records.
  • Verifying work-done by Sub-contractors.
  • Sourcing the vendors as per the requirements.
  • Implementation of services with the help of experts.
  • Project management at site and office level
  • Co-ordination with Electrical and HVAC and Fire Fighting.
  • Project: Commercial & Residential towers with a project Value of 5500 Crores.

Senior Engineer

Chettinad Builders Pvt.Ltd
01.2005 - 11.2006
  • Responsible for construction of structural works and all finishing works.
  • To ensure timely completion of project
  • Prepared QA & QC register to MNC standards
  • Prepared Clients & Sub Contractors bills
  • Client & Contractors co-ordination for getting approvals
  • Participation the site safety meetings
  • To impart training and capacity building of the site staffs and stake holders to make them capable of best in each stage of the activities
  • Project 1: IT Park – Egmore Chennai
  • Project 2: Timesquare (Rani Meyammal Towers) – Chennai
  • Project 3: Alumina Handling export terminal- Kakinada sea port Project value 90Cr
  • Position & Responsibility Sr. Civil Engineer
  • Executed all construction activities like total Pile boring & concreting, Slipform Concreting for 3 Numbers of silos(45m Ht), Surveying for conveyor alignment & Ship loader rail center line alignment Systems, R/F and concrete works of tunnel below the ground level (-4m, total dewatering systems) and above the ground level.(+30m)

Senior Engineer

Nilakandan & Sons Pvt Limited
07.2003 - 12.2004
  • Execution of PSC box girder
  • Checking Reinforcement & Form works
  • Monitoring the cone & HTS cable profile for stressing
  • Monitoring the concrete works of Box Girder
  • Monitoring beam casting & erection
  • Material Planning & Procurement.
  • To ensure timely completion of project
  • Ensure Safety standards.
  • Involved in MRTS Building construction activities
  • Projects: Metro Rapid transfer system PSC box girder adayar bridge no.53 (MRTS Project)
  • Adyar Kasturibai Nagar MRTS Station Building Construction Activities

Project Engineer

Navayuga Engineering Company Ltd
05.1997 - 06.2003
  • Execution of 1220 mm Ø Piles using Jackup platform and marine piling gantry platform, and Mooring Dolphins and other civil works related to Jetty, which includes cast in situ Pile cap beams, Precast beams and deck slab of 200 mm thick. Rock bund of 13.50 lakh tonnes of various grader of stone. Execution of Firefighting pump house & sub station building.
  • Execution of 800 mm thick Diaphragm walls of 3.5 km length by Reverse Mud circulation method with Precast girders as stop end. And related civil works. Execution of 200 no's of Inclined Rock anchors of 60m each length including pre stressing in post tensioning method.
  • Execution of all civil activities like Batching Plant erection , Gantry Erection, Shifting, Pile Alignment, Pile boring, Pile Cap Concrete, Pre cast beam, Casting and Placing. Jetty Deck Slab Concreting, Bollard Alignment and fixing, Fender fixing.
  • Project1:Construction of LPG Handling Jetty at Pipavav Port, Gujarat.
  • Brief Description: Construction of 305 M long Jetty and 150 M approach Jetty 1000/ 1220 mm dia cast-in-situ piles 220 Nos. and RCC deck and Rock Bund (13.50 Lakh Tonnes)
  • Project 2: Construction of Diaphragm wall with Rock Anchor for ship Breaking (S.D.R.F) at Pipavav Port, Gujarat
  • Brief Description: Construction of Ship Dismantling and Repairing Facilities
  • Project 3: Construction of Cargo Berth No. 8 (Multipurpose) at Tuticorin Port.
  • Brief Description: Construction of 280 Nos. 1200mm dia cast-in-situ bored piles, concrete deck slab with 34587 cu.m of in situ concrete, M30, M20 & M10 grades and 3129 cu.m of precast, units using M30 formation of rock bund with 1.70 lakh MT of X stones, reclamation of 50,000 sq.m geo-fabrics filters, etc. (340 m long and 30 m wide)
  • Project 4: 9th Cargo Berth Kandla Port Trust, Gujarat
  • Project 5: Construction of Bridge with Approaches across River Coringa in Yanam, Andhrapradesh
  • Brief Description: 9th Cargo Berth constructed using the method of Gantry Pile Bore with the use of 955crane (60 tone capacity) & Hydra grabers which was imported from South Korea. The 955 crane was placed on the top of the gantry to drive the casing shell and pile boring, R/F , concrete casting , gantry Shifting & all other construction activities.
  • Execution of Pre Cast Beam Yard civil activities like Wall Form fabrication, fixing, alignment Casting, Beam Shifting over floating barge & beam erection at Coringa in Yanam.

Education

Diploma - Civil Engg.

MSPVL Polytechnic
Tirunelveli
01-1997

HSC - undefined

Ramaseshier Hr.Sec.School
Pattamadai
01-1994

Skills

  • MS Office & Auto-CAD
  • Training completed in Marine Academy(Trouble shooting for On shore & off shore works)

Accomplishments

  • On shore & off shore Marine civil works
  • Gantry & jack -up Marine Piling, Drilling & civil works
  • Bridges, Jetty, Diaphragm Wall & multipurpose berths
  • Multistoried residential township projects & Interior finishing works
  • Vertical & inclined Drilling, Cementing, Pressure Grouting & Rock Anchoring
  • Pre stressing in post tensioning
  • Pressure grouting, Pre grouting
  • Slip way & launching activities
  • Vertical wall & rubble mount Break waters - accropode & armour Rock profile making
  • Bollard, Fender Fixing & Alignment(Pneumatic, Rubber & Gravity)
  • D M C, R M C Land Pile and Marine Pile Boring & concreting
  • Pre cast beam, Trestle Beam casting & Erection works
  • Jetty Deck Slab Concreting
  • Civil Surveying & Marine Surveying
  • Silo's & Chimney's slip form activities
  • Ship loader rail alignment
  • Conveyer alignment
  • Tunnel work & Box Pushing
  • Gantry fabrication & shifting
  • Underwater repairing & Micro concreting
  • Metro Rail/ Piling & Pile cap works & Station Building works

DECLARATION

I here by confirm that the above information furnished is true to the best of my knowledge and belief. Date : Place : Chennai. (L. Balakrishnan)

Timeline

Manager Executive

ITD Cementation India Limited
03.2013 - 07.2024

Deputy Manager

Hiranandani Palace Garden Pvt Limited
01.2011 - 02.2013

Assistant Manager

Lanco Infratech Pvt Ltd
12.2006 - 12.2010

Senior Engineer

Chettinad Builders Pvt.Ltd
01.2005 - 11.2006

Senior Engineer

Nilakandan & Sons Pvt Limited
07.2003 - 12.2004

Project Engineer

Navayuga Engineering Company Ltd
05.1997 - 06.2003

HSC - undefined

Ramaseshier Hr.Sec.School

Diploma - Civil Engg.

MSPVL Polytechnic
Balakrishnan L