Dedicated and experienced Mechanical Engineer with extensive knowledge of engineering principles, theories, specifications, and standards. Bringing leadership, drive, and over fifteen years of experience to the table. Proven track record of finishing complex projects within the schedule of site requirement. Substantial experience in analyzing problems and resolving them. Adept in overseeing the manufacturing process and working with other professionals to ensure that projects are successfully completed.
Overall Work Experience of 15 years 08 months as on date in the field of Expediting & Inspection for various Projects including Work Share.
Working in Jacobs / Worley _ Procurement - Expediting for 08 years 08 months.
Expediting of Package Equipment, Pressure Vessels, Pumps, Electrical & Instrumentation Item and Piping Bulk Material etc.
From Jan 2014 till Present (Jacobs ~ Worley):
A. Local Projects Handled for following Clients:
01) Reliance Industries Limited : J3 Program - Offsites & Utilities.
02) Chennai Petroleum Corporation Limited : Resid Upgradation Project.
B. Global Projects Handled for following Clients:
01) BP West Coast Products, LLC. : Cherry Point Refinery - Coker Heater Replacement and Fuel Gas Conditioning Project.
02) BP Exploration and Production Inc. : Gulf of Mexico Refinery - IM Findings, Atlantis, Mad Dog, Na Kika and Thunderhorse Platform.
03) BP Raffinaderij Rotterdam B.V. : TAR 2017, TAR 2019 and other multiple micro projects (Programs).
04) Shell Chemical Co. : AO4 Tiger Project (ISBL) and LOTUS Project (ISBL and OSBL).
05) SHELL Nederland Raffinaderij B.V. : Multiple micro projects (Programs).
06) Chevron : El Segundo Refinery and Richmond Refinery, CA. - Multiple micro projects (Programs).
07) Phillips 66 : Carson Refinery and Rodeo Refinery - Multiple micro projects (Programs).
08) Marathon Petroleum Company : Multiple micro projects (Programs).
09) Philadelphia Energy Solutions : 870 LSG Tier 3 Gasoline Compliance Project.
10) Gunvor Petroleum Rotterdam (GPR) : PGS 29 HH Level Protection Program.
11) Lyondell Chemie Nederland B.V. : Multiple micro projects (Programs).
Inspection & Expediting of Equipment’s, Piping Bulk Material etc. which involves,
1. Follow up for Submission of Engineering Documents, QC Documents etc.
2. Arranging Expediting visit at Vendor’s workshop to check the progress of job & ensure completion within C.D.D.
3. QCP / ITP Review, TC Review & Review of Final Documentation.
4. Material Identification, Stage wise Inspection & Final Inspection as per Approved QAP.
Preparing & Releasing Inspection / Expediting Reports in Marian.
List of Clients and Projects executed:
01) ONGC Petro additions Ltd. : LLDPE / HDPE (SWING) - Unit of 2 x 360 KTPA Cap. and POLYPROPYLENE (PP) - Unit Part B of 1 x 340 KTPA Cap.
02) National Fertilizers Ltd. : Ammonia Plant Feedstock Changeover Project.
03) Gulf Petrochemical Industries Co. : HP Steam Boiler & Sub-Station-10.
04) Indian Oil Corporation Ltd. : Sulphur Solidification, Handling, Storage & Dispatch Unit.
05) National Fertilizers Ltd. : 450 MTPD Carbon Dioxide Recovery Plant.
06) Mangalore Refinery & Petrochemicals Ltd. : Heavy Coker Gas Oil - Hydrotreating Unit (CHTU).
Position / Department : Inspection Engineer / PCS Inspection, CGPP & FPEX - Heavy Engineering Division.
MAIN RESPONSIBILITIES
1. Inspection of Plates and Pipes & Incoming Material Inspection of Forgings, Flanges, Fittings etc.
2. Witnessing of Physical Tests such as Tensile, Bend, Impact etc. & Reviewing of Material Test Certificates.
3. Outdoor Inspection of Fabricated Parts such as Shell, Dished-end, Cone, Saddle, Job Internals/Externals etc.
4. Visit at vendor’s workshop for Stage Inspection, In process Inspection, Critical fixtures etc.
5. Outdoor Inspection of Machined Components.
6. Inspection activities of Coal Gasifier (Shell Technology) in M/s Naik’s Brass & Iron Works, Charkop:
Preparation of Check-list in Baan, Inspection of 2D & 3D Bend Pipes, Issue Inspection of Plates & Pipes, Monitoring of Welding process as per parameter sheet, Set-up, Visual & Dim. Inspn of piping components viz. Header/Distributor, Forged Blocks, K-bends, etc. Conducting Hydrostatic Test, Air Pressure Drop Measurement Test and Final Dimension & Documentation.
7. Inspection activities of Heat Exchanger in Bend n Fab, Mahape:
Issue Inspection of Plates & Pipes, Shell L/s, C/s, Nozzle, Dished-end set-up & visual clearance, Hydro, Drying, N2 Filling of Equipment, Final Dimension & Documentation.
8. Witnessing of Heat Treatment Loading / Un-loading of sub-assemblies and formed components.
9. Interacting with Third Party Surveyors / Statutory authorities such as IBR, LRA, EIL, SGS, Jacobs H & G, PDIL, TUV, AI and getting the documents cleared within time.
10. Familiar with BaaN (ERP) activities (Preparing Inspection Checklist, clearing Inspection entry, preparing Material Clearance Record etc.).
11. Final documentation of critical jobs with tight schedule for BECHTEL, DAELIM, KBR, OMIFCO, SEECO.
12. Familiar with ASME / ASTM, AD Merkblätter, TEMA & DIN Standards.
** Same as above **
8th Semester Inplant Trainee, 12/2001 - 06/2002
Godrej & Boyce Mfg. Co. Pvt. Ltd., Vikhroli, Mumbai.
Heat Exchanger Planning Department in Process Equipment Division (Plant 15).
5th Semester Inplant Trainee, 07/2000 - 11/2000
Voltas Limited, Main Plant, Thane.
Unit 3 Material Handling Business Division and Unit 2 Air Conditioning Business Division.