Chanki Pandey

Deputy Manager (Precast)
Pokhrayan

Summary

Resourceful Manager offering history of more than Thirteen years successfully coordinating and monitoring operations across various departments. Effective leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Highly committed with hardworking mentality to maintain quality of services and products.

Overview

12
12
years of professional experience
1
1
Language

Work History

Dy. Manager - Structure PRECAST

Apco Infratech Ltd.
06.2023 - Current
  • Managed budgets for various projects & reduced operational costs ensuring optimal resource allocation and cost control.
  • Developed strong relationships with Clients & Top Management to facilitate smooth communication and project completion.
  • Optimized internal workflows by identifying bottlenecks in processes and implementing efficient solutions for increased productivity.
  • Evaluated employee performance regularly using well-defined criteria, recognizing top performers and addressing underperformance proactively.
  • Developed Casting Yard from scratch and made operational before stipulated time.
  • Gantry (100t) Erection & Commissioning with all checks.
  • Segment Mould Fabrication & Commissioning with mockup test.


Assistant Manager

Apco Infratech Pvt.ltd.
09.2022 - 06.2023
  • Mentored junior staff members in their professional development by offering guidance/support in their assigned roles.
  • Promoted teamwork within the workplace by encouraging collaboration among staff members on various projects tasks.
  • Achieved 1012 Segments in a record time of 12 months with 2 Long line Beds successfully redirecting already delayed project back onto the path of progress.

Sr. Engineer (Precast)

L&T CONSTRUCTIONS LTD. TIIC
12.2021 - 09.2022
  • Accelerated product development cycles by employing Agile methodologies and fostering a collaborative work environment.
  • Created a World Record of Casting 40m. FSLM Box Girder in 4 hours 35 min.
  • Commissioned First of its kind FSLM Mould Erection.
  • Led a team of 4 Engineers and 4 Supervisors for Day/Night smooth running of activities in an efficient manner.
  • Handled 4/16 Beds and reduced casting time cycle from 15 days to 10 days for each FSLM.

Sr. Engineer(Structure)

Dilip BuildCon Ltd.
10.2019 - 11.2021

"Sharavathi Back water Cable stay Extradosed and balance cantilever Bridge in Karnataka bridge length 2.125km ."

Bridge Details : Extra dosed span- (177x3 nos.) and Balance Cantilever Span( 90x6 nos.,135 X 6 nos., 104.5 x 2nos and 35 x1)

Responsible for Segment Casting By Short line Method.

Client: National Highways Authority of India

Project Cost: 370 Cr.

Sr. Engineer (Structure)

Dilip BuildCon Ltd.
05.2018 - 10.2019

"Karnataka –Goa Border (NH-5A) Road Project From KM-30+800 to 82+958 with Paved Shoulder PQC EPC Road Project.In the state of Karnataka."

Responsible for Production of PSC Box Girder Segments in Casting Yard.

Client: National Highways Authority of India

Project Cost: 398 Cr.

Sr. Engineer (structure)

DilipBuildcon Ltd.
09.2016 - 05.2018

"DBFOMTWCP-3 of Hassan-Ramanathapuram-Periyapatna in state of Karnataka on Design, Build,Fund,Operate,Maintain, and Transfer on Annuity Mode"

Responsible for:

  • Major bridge :- 1) 8nos RCC girder and 12nos PSC Girders
  • HPC:- 24nos
  • Box culvert:- 22nos
  • Minor Bridge:-10nos


Client: Karnataka Road Development Corporation

Project Cost: 266 Cr.

Engineer - Structures

DilipBuildcon Ltd.
06.2015 - 09.2016

"Two laning with paved shoulder of Vaggampalli to Dormala T-Junction (NH- 565) road project in EPC basis in Andhra Pradesh."

Responsible for total Structures in10 km reach from Ch. 349+214 to Ch. 359+562, Planing & Co ordination of all structure in Project.

Client: R&B Division, National Highways Authority of India

Project Cost: 310 Cr.

Jr.Engineer Structures

Dilip Buildcon Ltd.
01.2015 - 06.2015

"NH18 Two laning with paved shoulders from Jhalawar to M.P.Border in Rajasthan EPC Project."

Responsible for total Structures in Ch 562+000 to 565+000

Client: National Highways Authority of India

Project Cost: 208 Cr.


Jr. Engineer (Structures)

DilipBuildcon Ltd.
01.2014 - 01.2015

"Four laning of NH-7 Rewa Hanumana BOT Project in Madhya Pradesh Responsible for total Structures in Ch:262+000 to 267+000"

Responsible for 1 Major Bridge ( 4 Span X 30m. PSC I-Girder) and 3 Box Culverts

Client: National highway Authority of India.

Project Cost : 928 Cr.

Jr. Engineer (structures)

Dilip Buildcon Ltd.
06.2013 - 01.2014

"4-laning of NH-6 Nagpur– Bhandara road project under NHDP Phase 4 Maharashtra DBFOT Basis"

Responsible for 1 Pedestrian under pass, 2 VUPs , 3 MNBs and 1 MJB of 2 Spans x 43 mtrs x 4 Nos PSC girder in each Span

Client: JMC Projects

Cost of Project: 616 Crores

Jr.Engineer

Dilip Buildcon Ltd.
02.2013 - 06.2013

"NH56B Two laning with Paved Shoulders from Narshingpur to Chindwara BOQ project in Madhya Pradesh."

Responsible for MNB Cast – In-Situ PSC I-Girder 30mtr each.

Client: Aarvee Asscociates & Sadhbhav Engineering.

Cost of Project: 374.45 Crores

Jr.Engineer

Dilip Buildcon
10.2011 - 02.2013

"2-Laning of Ujjain-Nagda-Jaora Road Project with Paved Shoulders"

Client: MPRDC

Cost of Project: 189.29 Crores

Education

Skills

undefined

Specialities

  • Casting of Precast Box-Girder/Extra-Dozed/Balanced-Cantilever Segments (Single cell/Double Cell/Three cell) by Long line & Short line Method for ( Pre Tensioned –Strut Beams, Slabs; Pre Tensioned & Post tensioned Girders, Precast Pier caps.
  • Pre-stressing of Extra-Dosed/Cable Stay Bridges, Girders (I,U,T) &
  • Launching of all above mentioned precast elements on site.
  • Site Execution & Management of all Bridge related civil structural works.
  • Expertise in understanding drawings & details, production, project management, estimation, quantity surveying, Client/Contractor billing & commercial activities.

Present Employer

Apco Infratech Pvt Ltd.

Software Exposure

PGDCA In computer Application, MS-OFFICE, Auto Cad

Personal Information

  • Total Experience: 10.4 years
  • Passport Number: S6764070
  • Father's Name: Virendra Kumar Pandey
  • Date of Birth: 08/09/89
  • Marital Status: Married

Joining Time

ONE MONTH

Software

Autocad

MS Office (Word/Excel/Powerpoint/Outlook)

Timeline

Dy. Manager - Structure PRECAST

Apco Infratech Ltd.
06.2023 - Current

Assistant Manager

Apco Infratech Pvt.ltd.
09.2022 - 06.2023

Sr. Engineer (Precast)

L&T CONSTRUCTIONS LTD. TIIC
12.2021 - 09.2022

Sr. Engineer(Structure)

Dilip BuildCon Ltd.
10.2019 - 11.2021

Sr. Engineer (Structure)

Dilip BuildCon Ltd.
05.2018 - 10.2019

Sr. Engineer (structure)

DilipBuildcon Ltd.
09.2016 - 05.2018

Engineer - Structures

DilipBuildcon Ltd.
06.2015 - 09.2016

Jr.Engineer Structures

Dilip Buildcon Ltd.
01.2015 - 06.2015

Jr. Engineer (Structures)

DilipBuildcon Ltd.
01.2014 - 01.2015

Jr. Engineer (structures)

Dilip Buildcon Ltd.
06.2013 - 01.2014

Jr.Engineer

Dilip Buildcon Ltd.
02.2013 - 06.2013

Jr.Engineer

Dilip Buildcon
10.2011 - 02.2013

Chanki PandeyDeputy Manager (Precast)