Resourceful Manager offering history of more than Thirteen years successfully coordinating and monitoring operations across various departments. Effective leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Highly committed with hardworking mentality to maintain quality of services and products.
"Sharavathi Back water Cable stay Extradosed and balance cantilever Bridge in Karnataka bridge length 2.125km ."
Bridge Details : Extra dosed span- (177x3 nos.) and Balance Cantilever Span( 90x6 nos.,135 X 6 nos., 104.5 x 2nos and 35 x1)
Responsible for Segment Casting By Short line Method.
Client: National Highways Authority of India
Project Cost: 370 Cr.
"Karnataka –Goa Border (NH-5A) Road Project From KM-30+800 to 82+958 with Paved Shoulder PQC EPC Road Project.In the state of Karnataka."
Responsible for Production of PSC Box Girder Segments in Casting Yard.
Client: National Highways Authority of India
Project Cost: 398 Cr.
"DBFOMTWCP-3 of Hassan-Ramanathapuram-Periyapatna in state of Karnataka on Design, Build,Fund,Operate,Maintain, and Transfer on Annuity Mode"
Responsible for:
Client: Karnataka Road Development Corporation
Project Cost: 266 Cr.
"Two laning with paved shoulder of Vaggampalli to Dormala T-Junction (NH- 565) road project in EPC basis in Andhra Pradesh."
Responsible for total Structures in10 km reach from Ch. 349+214 to Ch. 359+562, Planing & Co ordination of all structure in Project.
Client: R&B Division, National Highways Authority of India
Project Cost: 310 Cr.
"NH18 Two laning with paved shoulders from Jhalawar to M.P.Border in Rajasthan EPC Project."
Responsible for total Structures in Ch 562+000 to 565+000
Client: National Highways Authority of India
Project Cost: 208 Cr.
"Four laning of NH-7 Rewa Hanumana BOT Project in Madhya Pradesh Responsible for total Structures in Ch:262+000 to 267+000"
Responsible for 1 Major Bridge ( 4 Span X 30m. PSC I-Girder) and 3 Box Culverts
Client: National highway Authority of India.
Project Cost : 928 Cr.
"4-laning of NH-6 Nagpur– Bhandara road project under NHDP Phase 4 Maharashtra DBFOT Basis"
Responsible for 1 Pedestrian under pass, 2 VUPs , 3 MNBs and 1 MJB of 2 Spans x 43 mtrs x 4 Nos PSC girder in each Span
Client: JMC Projects
Cost of Project: 616 Crores
"NH56B Two laning with Paved Shoulders from Narshingpur to Chindwara BOQ project in Madhya Pradesh."
Responsible for MNB Cast – In-Situ PSC I-Girder 30mtr each.
Client: Aarvee Asscociates & Sadhbhav Engineering.
Cost of Project: 374.45 Crores
"2-Laning of Ujjain-Nagda-Jaora Road Project with Paved Shoulders"
Client: MPRDC
Cost of Project: 189.29 Crores