DATTATRAY JOSHI

DATTATRAY JOSHI

Bhadrawati,MAHARASHTRA

Summary

Achievement-oriented Professional with nearly 22+ years of rich experience in... Project Manager versed in all aspects of project and personnel management. Results-oriented and high-energy professional with talent for leading by example and inspiring peak performance. Dedicated to fostering strong effective team relationships. Dedicated POWER professional with a history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand. Encouraging manager and analytical problem-solver with talents for team building, leading and motivating, as well as excellent customer relations aptitude and relationship-building skills. Proficient in using independent decision-making skills and sound judgment to positively impact company success. Dedicated to applying training, monitoring and morale-building abilities to enhance employee engagement and boost performance.

Overview

24
24
years of professional experience

Work History

PROJECT MANAGER & RESOURCE MANAGER

TRANSRAIL LIGHTING LIMITED
NAGPUR
05.2024 - Current
  • Facilitated resolution of conflicts between team members when necessary.
  • Participated in cross-functional teams responsible for developing innovative solutions for complex problems.

Sr .Manager

HG Power Transmission Sdn Bhd
Dhaka, Selangor
12.2022 - 03.2024
  • Hg Power Transmission Sdn
  • Bhd
  • Is a foreign company incorporated on 23 March 2006
  • And its country of incorporation is Malaysia
  • Hg Power Transmission Sdn
  • Bhd.'s Foreign Company Registration Number (FCRN) is F02710
  • Its Email address is amitverma@steelpro.co.in and its registered address is 3A33 4th Floor Block A , Kelana Centre point Jalan SS17
  • Key Result Areas
  • Monitoring the entire construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output, budgeting, labour compliance's, strategic planning, cash flow, and so on
  • Inviting, analyzing & accepting tenders, setting up terms of performance agreement, preparing bidding documents and managing procurement for departmental work
  • Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
  • Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
  • Administering the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction & commissioning activities
  • Networking with architects, consultants, clients & contractors to ascertain technical specifications and construction related essentials, based on the prevalent rules
  • Identifying limitations / hold ups for progress of site works and coordinating to resolve the same
  • Participating in discussions with Owner/ Engineer regarding related site work progress, drawings, sequence of works, quality aspects, etc
  • Generating & submitting Daily / Weekly / Monthly Reports
  • Maintaining Site QA /QC records & submissions and preparing Red Mark Drawings
  • Leading, supervising, motivating, coaching & mentoring a team of Engineers, Technicians & Drafters; managing the performance of team and delegating project work
  • Directing:
  • Development of new concepts and technology for transmission lines
  • Development and review of transmission lines specifications and standards and identifies and implements engineering methods and procedures to improve design and construction efficiency
  • Implementation of consistent design standards throughout Ever source
  • Management oversight of external engineering contracts supporting transmission lines efforts
  • Scheduling of resources and tracking of performance
  • Preparation of regulatory approval applications for transmission lines
  • Preparation & approval of project cost estimates, project authorization costs, and schedules for transmission overhead and underground projects
  • Selection of routing for transmission lines, working closely with Ever source Sitting staff
  • Coordination of transmission engineering and design developmental activities with other Transmission Engineering & Operations functions
  • Analysis & reporting of transmission system performance and bulk power system disturbances to Transmission Operations
  • Initiation, evaluation, and administration of engineering contracts related to transmission lines
  • Development, approval process & maintenance of engineering, design, construction, equipment, and material specifications and standards
  • Qualification of prospective supplier's equipment, materials, technical competence & production capabilities
  • Forecast of equipment and material needs, the initiation of bid solicitation by the Purchasing & Materials Management group, and the technical evaluation of bids for equipment and materials
  • Interpretation and application of various regulations, codes, and standards pertaining to transmission lines
  • Representing ever source on various business-related committees, engineering societies, joint study groups and industry standards groups
  • Formulating & executing the Asset strategy for aging overhead and underground infrastructure
  • Working on a variety of transmission & distribution projects, with the liberty to take on a project management role as desired

Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission Company Ltd
Pune
11.2018 - 10.2021
  • MSETCL – Conversion of 132KV DC Transmission Line of 132kv UG Cable Work, Projects Undertaken:V Cable Project -MSETCL PUNE (For Sec.No.11, 1.1AA)
  • Joint Bay Construction -7nos–Joint Bay Construction Work for MSETCL Project Other Employment and Labor Supply Work
  • OFC Cable laying including all excavation work, Laying of HDPE ducts splicing, OTDR testing
  • Commissioning of OFC for 48F OFC cable for of 132KV MSETCL Project of Civil & Erection Work for underground cable laying

Senior Manager

VarrsanaIspat Ltd, Rajya Vidyut Prashashan Nigam Ltd
Jaipur
04.2015 - 10.2018

Construction Manager

Reliance Power Transmission Ltd
Pune
11.2009 - 04.2015
  • Projects Undertaken:V D/C Solapur – Karad LILO (143 km) (Successfully commissioning) 400 KV D/C Solapur – Kolhapur TL (328 km)KV D/C Pune – Parli TL, Successfully commissioning on rated voltage)
  • Role:
  • Creating Monthly Reporting on various project activities at various sites
  • Interfacing with client on a daily basis and maintaining cordial relationship with them
  • Preparing cost effective design basis with respect to project specification & related codes
  • Developing master document list for civil activities
  • Performing: a
  • Civil design analysis and calculations as per the project requirements /DBR lbd
  • Fie survey & investigate to prepare engineering drawings Review of Design Drawings c
  • Study of Construction Drawings and preparation for works
  • Carrying out analysis of design issues and recommending corrective actions Determining the construction cost and material estimates based on civil designs
  • Planning & coordinating drawing availability for the required sequences with the Work Sequences Reviewing & finalizing list of Material Submitting and coordinating & obtaining approvals Planning of Manpower, Work Sequences and Activities
  • Evaluating the Quantity of materials utilized and confirming with Drawings
  • Developing & reviewing design documentation & drawings in line with required sequence of civil site works and the over project time schedule
  • Evaluating& approving Shop Drawings and other site engineering documentation

Senior Engineer

Bajaj Electrical Ltd
Mumbai
09.2008 - 10.2009
  • A 75-years old trusted company with a turnover of Rs
  • 2763 crore, is a part of the US $7 billion (over INR 38,000 crore ) "Bajaj Group"
  • Project Undertaken:
  • MSETCL 220 KV D/C Ghatanji – Yavatmal TL, :
  • Supervising the entire Site Works and performing stage & final Inspections of Site Works
  • Executing site work as per approved shop drawing; ensuring effective implementation of all tests & inspection schedule and coordinating with various teams to perform quality audits on processes & controlling Sub Contractors Work Progress monitoring & controlling materials & stores

Project Engineer

Instalaciones Inabensa SA, Power Grid Corporation of India Ltd
09.2000 - 07.2008
  • KV D/C Baripada–Bhadrak TL (179 Km)KV S, C Seoni– Riva TL (148Km) (Successfully Commissioning on rated-voltage) 765 KV Sub-Station Seoni (MP)
  • Role:
  • Engaged in site supervision, execution, material planning and erection of TL Line Administered contractors and sustained site safety and quality of work as per standards Governed a wide range of activities including site execution, planning
  • Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
  • Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
  • Fulfilled site statutory compliance's, maintained good relationship with client and contractors
  • Ensured accurate documentation and records for Client Inspection and Approvals
  • Contractor bill certification for work done with material reconciliation of material issue from site store Coordination and liaising with client, govt
  • Authority, Electrical Inspector and Locals
  • Acquired certification of contractor invoice for supply and execution and recommendation for payment Reported top management on likely delay and recommended methods to overcome delays
  • Managed overall responsibility from workplace until work completes
  • Initiation ,evaluation, and administration of engineering contracts related to transmission lines.

Senior Engineer

APPROVAL
01.2006 - 01.2007
  • Achieved live line stringing of:
  • Second circuit continuously done without any outage of line under supervision of Mr
  • Naik (, Live stringing
  • 14 km out of 87, 220kv D/C Dimapur -Difu TL for Inabensa SA in year 2005 within 20 days
  • 43Km out of 112 km, 400 kV Solapur – karad LILO for RPTL in year 2011 within 30 days with 2 gang
  • OPGW circuit and removal of existing earth wire continuously done without any outage of line under supervision of Mr
  • Ram Kumar (PGCIL, Ramagundan) in 2018
  • Live line OPGW stringing
  • 132 kV samalkota - tadipalligudamTL
  • 187 KM
  • 1)220 kV Rajmundry- Elluru- Guntur TL - 393KM
  • 400kv Vijayawada - ongle TL - 227 KM
  • 400 KV Vijayawada - Kavali TL - 128 KM
  • 220 kV Ongle - Kavali TL - 42KM for Varrsana Ispat ltd in 2017 within 10 months
  • Steered efforts in successfully completed special type foundation (1234 cu.) Butt/Leg Extension on line under supervision of Mr
  • Purohit (SE /CE of RRVPNL)
  • Butt joint foundation
  • 400 KV D/C Baripada - Bhadrak TL, 3 nos of foundation (Butt joint) for inabensa SA in Orrisa in year 2006 completed in one week
  • D/C Phagi - Ajmer TL 11 nos of foundation (butt joint) for varrsana ispat limited in year 2015 at Rajasthan completed in two months
  • Played a vital role in special type tower extension DD +100 mtr of river crossing of river span 1135 mtr for the line Baripada – Bhadrak TL under supervision Mr
  • Banerjee (Senior Manager, PGCIL) within 20 days in year 2004.foundation erection and stringing of DD+100 river crossing tower (400kv quad) in Nogaon - Dhekiyajuly TL for inabensa SA in year 2005
  • Distinction of successfully constructed special types of different Leg Length (0, +3, +6 &+9) of Foundation (9 Tower) within a shortest span
  • In 400 KV D/C phagi- Heerapura -Ajmer TL, Different level leg foundations and erection in 1 tower Leg A - +0 / Leg B - +6 / Leg C- +9 and Leg D - +6 at Srinagar, Rajasthan (Loc
  • No - 38AA/4) with special revetment Size 18 mtr × 16 Mtr × 6.5 mtr (height)
  • Construction method: - R R Machinery completed in 25 days
  • HANDS-ON EXPERIENCE AND EXPERTISE IN SURVEY, LEVELLINGAND CONTOURING ( LANDSURVEYANDTRANSMISSIONLINESURVEY )
  • Survey
  • Selection of Route
  • Three Alternative Route selected out of which Shortest length to be selected (BEE Line), hence least capital cost
  • Ease during construction and ease in maintenance of the line (route near roads for easy approach &accessibility)
  • Requirement of future loads (sub stations) near the proposed route so that the line can be easily connected
  • Reconnaissance Survey and Measurement of Resistivity
  • Reconnaissance survey of the transmission line route is to be carried out for deciding upon the most economical line route and the most economical location of towers in view of the high cost per location
  • The G
  • T
  • Sheets of the Survey of India are the best available maps
  • The maps covering the complete proposed route of the line shall be obtained
  • The work of reconnaissance survey is essential for the purpose of establishing control points and collection of first-hand information of various important field data required for transmission line works
  • These are as belo
  • Crossing points of major EHV lines (66 kV and above) & details of the lines
  • Crossing points of Railway Tracks & details of such points
  • Crossing points of major rivers & details of such points
  • Type of terrain and nature of soil strata along the line route
  • Important villages or towns coming enroot
  • Measurement Of Earth Resistivity:
  • Fixing of Route Alignment
  • Fixing of angle tower positions
  • Finalizing of crossing points of major EHV lines (66 kV and above) & details of the lines.
  • Measurements of the angles of deviation at all angle / section points
  • Crossing Of Power Lines:
  • The crossing of existing power lines at an angle as close to 90 degrees as possible
  • Crossing Of Railway Tracks
  • The angle of crossing preferably be 90 degrees, but an angle of up to 60 degrees may be Permitted in special cases
  • The crossing span shall be restricted to 300 meters or to 80% of the Basic span of the towers of the relevant voltage
  • Crossing Of Roads:
  • Right Of Way:
  • The width of the right of way should be kept as per the provisions of the applicable part / section of the Indian Standard Code of Practice for Design, Installation and Maintenance of Overhead Power Lines (IS: 5613)
  • Route Marking:
  • At the starting point of the commencement of route survey, at all angle / section points, at every 1.25 km
  • Or part thereof, and at the end point of the route survey, concrete pillars 200 x 200 mm square and height 300 mm buried firmly in the ground for easy identification
  • The top of these pillars shall be 50 mm below ground level and should not normally project above the ground level
  • A wooden peg of size 50 x 50 mm and length 150 mm is embedded in the Centre of the Concrete pillars when they are casted
  • Nails of 25 mm length shall be fixed on the top of these pegs to indicate the location of the Centre of the survey instrument.0) Plotting Of The Route On The Map:
  • The line as surveyed is plotted on the G
  • T
  • Sheet maps indicating all the angle points
  • Approvals & Clearances for The Line Route, OF THE POWER & TELECOMMUNICATION CO ¡V ORDINATION COMMITTEE (PTCC):
  • APPROVAL OF THE AVIATION AUTHORITIES:
  • APPROVAL OF FOREST DEPARTMENT:
  • APPROVAL OF RAILWAY AUTHORITIES:
  • APPROVAL OF ELECTRICAL INSPECTOR:
  • APPROVAL OF NHAI0) Detailed Survey (Modern Technique) and Plotting of profile
  • The line route worked out during the preliminary survey, with changes if any, is used as the reference
  • The measurements of the angle points are again done
  • These angles are indicated as Right (R) or Left (L) as per the direction of deviation with reference to the starting point
  • The levels of the ground profile along the route of the line are taken
  • The reduced level (R.L.) of the ground at the starting point of the line is taken as 100.00 meters.0) Plotting Of Profiles:
  • Tower Spotting, Span and Tower Schedule
  • Key Result Areas:
  • Contributed in assessment of quantities, rate analysis, etc
  • Dealt with techno–commercial aspect of the project, which involve preparation of billing to Client certification
  • Prepared BOQ, Reconciliation, Auto CAD Drawings, etc
  • Coordinated with Sub-contractor and Client
  • Report detailing about day-to-day work activities through daily work report from working site to head office
  • Supervised all day-to-day activities executed at site with quality & safety
  • Interacted with Vendors, Contractors and Electricity Boards
  • Managed overall responsibility from workplace until work completes
  • Created technical drafts & advice and coordinated in technical issues with Site Management Team
  • Administered the entire Material Management which involves material planning, scheduling & storing required for execution of work
  • Identified the problem areas & contractors’ requirements of resources
  • Understood technical specifications, contractual terms & conditions and statutory requirement of bids

Varrsana Ispat Ltd
01.2000
  • VIL) is a public Ltd
  • Company incorporated in the year
  • VIL started as an Internet Service Provider and a Rice Processor
  • Subsequently, VIL embarked on a project to set up an integrated steel plant at Varrsana in Gandhidham (Kutch) in (Gujarat)
  • Projects Undertaken:
  • 400, D/C Phagi – HeerapuraTL (Successfully commissioning on rated voltage)
  • 400KV S/C Bikaner – Merta TL (Successfully commissioning on rated voltage)
  • 400KV D/C Phagi – AjmerTL
  • Role:
  • Maintaining the track of material stock availability against work scheduling, inventory control of stores and prepare the critical material procurement
  • Checking the actual Bill of Quantity (BOQ) with LOA, analyzing the deviation for the entire project and submitting the timely proposal so technical and LOA amendment of the client
  • Coordinating with Subcontractors for earlier completion of projects, verification / cross check of bills and material reconciliation
  • Preparing daily, weekly & monthly progress reports for review meetings with clients
  • Attaining & processing all company Erection Bills in specified target given by company and coordinating with client for processing at H.O
  • Level Liaising with clients for finalization of LOA, amendment, reconciliation and closing all activities like, final BOQ, time extension, joint measurement & inspection, MB recording after works completion and handing over and taking over formalities
  • Providing technical drafts & advice and coordinating with Site Management Team regarding the technical issues Interacting with clients & contractors, coordinating with various disciplines and permitting agencies; acting as a Mentor for Junior Engineers
  • Creating tools & methodology to streamline the structural analysis, performing transmission line analysis and evaluating the structure conditions
  • Performing inspection & evaluation of concrete foundation of transmission structures Analyzing & approving engineering design submitting; estimating projects & develop proposals
  • Resolving site queries, attending site meetings and performing site inspections during the construction phase of projects
  • Maintaining complete project documentation with respect to transmission line design & construction, including all completion packages, as-built requirements and return data information Making & maintaining appropriate commitments to project teams and coordinating design activities with multi- disciplined project team members Preparing: Site Working Documentation Bar Bending Schedules, Site Modifications (required for site conditions) and obtaining clearances for the same from Design Department
  • Method Statements, Submission and Obtaining Approvals; creating Site Work Check Lists (QA Formats)

I S CO D E O FPRACTICES
  • Knowledge of IS code implementation
  • Inspected and Monitored all the construction activities as per IS code no deviation allowed in construction activities to the violation of the IS code of conduct
  • IS Codes :
  • IS 4091:1979> Code of practice for design and construction of foundations for Transmission Line Towers and Poles.

Education

AMIE in Civil Engineering -

Kolkata University
01.2002

Diploma in Civil Engineering -

Board of Technical Education, Mumbai
01.2000

Secondary Examination -

Board of Sr. Sec. Education, Nagpur
01.1995

AMIE in Civil Engineering -

Kolkata University

Skills

  • Project Management
  • Turnkey EPC Projects
  • Construction Management
  • Erection, Testing & Commissioning
  • Quality Assurance & Control
  • Contract Management
  • Budgeting & Cost Control
  • Client Relationship Management
  • Team Management
  • Resource Management
  • Tender Evaluation & Contract Management
  • Design Management
  • Quality Control
  • Surveying
  • Levelling and Contouring
  • Route Selection
  • Reconnaissance Survey
  • Measurement of Resistivity
  • Fixing of Route Alignment
  • Crossing of Power Lines, Railway Tracks, and Roads
  • Right of Way
  • Route Marking
  • Plotting of Route on Map
  • Approvals & Clearances for Line Route
  • Detailed Survey and Plotting of Profile
  • Tower Spotting, Span, and Tower Schedule
  • Knowledge of IS Code of Practices
  • Construction Monitoring
  • Material Management
  • Technical Drafting
  • Site Inspections
  • Coordination with Consultants, Architects, Clients, and Contractors
  • Problem Solving
  • Leadership
  • Communication
  • Time Management
  • Microsoft Office (Project & PowerPoint)
  • AutoCAD
  • PL S-CAD
  • Vendor Sourcing
  • Work flow planning
  • Systems implementation
  • Compliance Monitoring
  • Strategic Planning
  • Resource Allocation
  • Workforce training
  • Project tracking
  • Project Planning

Handsonexperience

  • Survey
  • Selection of Route
  • Reconnaissance Survey and Measurement of Resistivity
  • Measurement Of Earth Resistivity
  • Fixing of Route Alignment
  • Crossing Of Power Lines
  • Crossing Of Railway Tracks
  • Crossing Of Roads
  • Right Of Way
  • Route Marking
  • Plotting Of The Route On The Map
  • Approvals & Clearances for The Line Route
  • Detailed Survey (Modern Technique) and Plotting of profile
  • Plotting Of Profiles
  • Tower Spotting, Span and Tower Schedule

Iscodeofpractices

  • IS 4091:1979> Code of practice for design and construction of foundations for Transmission Line Towers and Poles.
  • IS 1080:1985> Code of practice for design and construction of shallow foundations in soils(other than Raft, Ring ,Soil)
  • IS 2911:2010(PART-1)(SEC-1)> Code Of Practice For Design And Construction Of Pile Foundation(Concrete Piles –Driven Cast-In-Situ Concrete Piles)
  • IS 2911:2010(PART-1)(SEC-2) > Code Of Practice For Design And Construction Of Pile Foundation(Concrete piles-Bore cast-in-Situ Concrete Piles)
  • IS 2911:2010(PART-1)(SEC-3) > Code Of Practice For Design And Construction Of Pile Foundation(Concrete Piles-Driven Precast Concrete Piles)
  • IS 2911:1984 (PART-1)(SEC-4) > Code Of Practice For Design And Construction Of Pile Foundation (Concrete Piles-Bored Precast Concrete piles)
  • IS 456:2000 >Code of Practice for Plain and Reinforced Concrete
  • IS 456:2000> Amendment No.1
  • IS 456:2000> Amendment No.2
  • IS 456:2000> Amendment No.3
  • IS 456:2000> Amendment No.4
  • IS 456:2000> Amendment No.5
  • IS 516: 1956> Methods of Tests for Strength of Concrete
  • IS 1199:2018(PART-1-5)> Methods of Sampling and Analysis of Concrete
  • IS 10262:2009> Recommended Guide Lines for Concrete Mix Design
  • IS 875:1987(PART-1)> Code of Practices for Design Loads(Other than Earthquake) for Building and Structures –Dead Loads
  • IS 875:1987(PART-2) > Methods of Measurement of Building And Civil Engineering Works
  • IS 383:2016> Specification for Coarse and Fine Aggregate from Natural Sources for Concrete
  • IS 8182 :2013> Specification for 43 Grade OPC
  • IS 12269:1987> Specification for 53 Grade OPC

Notableaccomplishments

  • Bagged Appreciation Mail from Varrsana Ispat Ltd. for charging 400 kV line despite of huge local ROW issues and local political interference during year 2016.
  • Expertise to face &resolve any type of ROW issues like farmer, builders, local public opposition, aviation, military area, forest clearance issues and approval without affecting the site progress.
  • Achieved live line stringing of Second circuit continuously done without any outage of line under supervision of Mr. Naik (Senior Engineer- PGCIL, Orrisa) during 2006-2007.
  • Live stringing 14 km out of 87, 220kv D/C Dimapur -Difu TL for Inabensa SA in year 2005 within 20 days
  • 43Km out of 112 km, 400 kV Solapur – karad LILO for RPTL in year 2011 within 30 days with 2 gang
  • OPGW circuit and removal of existing earth wire continuously done without any outage of line under supervision of Mr. Ram Kumar (PGCIL, Ramagundan) in 2018
  • Live line OPGW stringing 132 kV samalkota - tadipalligudamTL. - 187 KM
  • 220 kV Rajmundry- Elluru- Guntur TL - 393KM
  • 400kv Vijayawada - ongle TL - 227 KM
  • 400 KV Vijayawada - Kavali TL - 128 KM
  • 220 kV Ongle - Kavali TL - 42KM for Varrsana Ispat ltd in 2017 within 10 months.
  • Steered efforts in successfully completed special type foundation (1234 cu.) Butt/Leg Extension on line under supervision of Mr. Purohit (SE /CE of RRVPNL)
  • Butt joint foundation 400 KV D/C Baripada - Bhadrak TL, 3 nos of foundation (Butt joint) for inabensa SA in Orrisa in year 2006 completed in one week.
  • 400 kV D/C Phagi - Ajmer TL 11 nos of foundation (butt joint) for varrsana ispat limited in year 2015 at Rajasthan completed in two months.
  • Played a vital role in special type tower extension DD +100 mtr of river crossing of river span 1135 mtr for the line Baripada – Bhadrak TL under supervision Mr. Banerjee (Senior Manager, PGCIL) within 20 days in year 2004.foundation erection and stringing of DD+100 river crossing tower (400kv quad) in Nogaon - Dhekiyajuly TL for inabensa SA in year 2005
  • Distinction of successfully constructed special types of different Leg Length (0, +3, +6 &+9) of Foundation (9 Tower) within a shortest span. In 400 KV D/C phagi- Heerapura -Ajmer TL, Different level leg foundations and erection in 1 tower Leg A - +0 / Leg B - +6 / Leg C- +9 and Leg D - +6 at Srinagar, Rajasthan (Loc. no - 38AA/4) with special revetment Size 18 mtr × 16 Mtr × 6.5 mtr (height). Construction method: - R R Machinery completed in 25 days.

Key Result Areas

  • Contributed in assessment of quantities, rate analysis, etc.
  • Dealt with techno–commercial aspect of the project, which involve preparation of billing to Client certification
  • Prepared BOQ, Reconciliation, Auto CAD Drawings, etc.
  • Coordinated with Sub-contractor and Client
  • Report detailing about day-to-day work activities through daily work report from working site to head office
  • Supervised all day-to-day activities executed at site with quality & safety
  • Interacted with Vendors, Contractors and Electricity Boards
  • Managed overall responsibility from workplace until work completes
  • Created technical drafts & advice and coordinated in technical issues with Site Management Team
  • Administered the entire Material Management which involves material planning, scheduling & storing required for execution of work
  • Identified the problem areas & contractors’ requirements of resources
  • Understood technical specifications, contractual terms & conditions and statutory requirement of bids

Personal Information

  • Date of Birth: 21st May 1980
  • Nationality: Indian

Languages

English, Hindi, Marathi, Bengali and Assami

Languages

Marathi
First Language
English
Proficient (C2)
C2
Hindi
Beginner
A1
Bengali
Beginner
A1

Timeline

PROJECT MANAGER & RESOURCE MANAGER

TRANSRAIL LIGHTING LIMITED
05.2024 - Current

Sr .Manager

HG Power Transmission Sdn Bhd
12.2022 - 03.2024

Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission Company Ltd
11.2018 - 10.2021

Senior Manager

VarrsanaIspat Ltd, Rajya Vidyut Prashashan Nigam Ltd
04.2015 - 10.2018

Construction Manager

Reliance Power Transmission Ltd
11.2009 - 04.2015

Senior Engineer

Bajaj Electrical Ltd
09.2008 - 10.2009

Senior Engineer

APPROVAL
01.2006 - 01.2007

Project Engineer

Instalaciones Inabensa SA, Power Grid Corporation of India Ltd
09.2000 - 07.2008

Varrsana Ispat Ltd
01.2000

I S CO D E O FPRACTICES

AMIE in Civil Engineering -

Kolkata University

Diploma in Civil Engineering -

Board of Technical Education, Mumbai

Secondary Examination -

Board of Sr. Sec. Education, Nagpur

AMIE in Civil Engineering -

Kolkata University