Achievement-oriented Professional with nearly 22+ years of rich experience in... Project Manager versed in all aspects of project and personnel management. Results-oriented and high-energy professional with talent for leading by example and inspiring peak performance. Dedicated to fostering strong effective team relationships. Dedicated and focused project management specialist with several years of experience excelling at prioritizing, completing multiple tasks simultaneously and following through to achieve project goals. Flexible, detail-oriented and adaptive team player with expertise in equipment operation, staff training and development, customer service and process improvements.
Overview
25
25
years of professional experience
Work History
PROJECT MANAGER & RESOURCE MANAGER
TRANSRAIL LIGHTING LIMITED
NAGPUR
05.2024 - Current
Facilitated resolution of conflicts between team members when necessary.
Participated in cross-functional teams responsible for developing innovative solutions for complex problems.
Sr .Manager
HG Power Transmission Sdn Bhd
Dhaka, Selangor, Bangladesh, Malaysia
12.2022 - 03.2024
Hg Power Transmission Sdn
Bhd
Is a foreign company incorporated on 23 March 2006
And its country of incorporation is Malaysia
Hg Power Transmission Sdn
Bhd.'s Foreign Company Registration Number (FCRN) is F02710
Its Email address is amitverma@steelpro.co.in and its registered address is 3A33 4th Floor Block A , Kelana Centre point Jalan SS17
Key Result Areas
Monitoring the entire construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize output, budgeting, labour compliance's, strategic planning, cash flow, and so on
Inviting, analyzing & accepting tenders, setting up terms of performance agreement, preparing bidding documents and managing procurement for departmental work
Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
Administering the preparation of monthly progress reports entailing progress & details for engineering, procurement, construction & commissioning activities
Networking with architects, consultants, clients & contractors to ascertain technical specifications and construction related essentials, based on the prevalent rules
Identifying limitations / hold ups for progress of site works and coordinating to resolve the same
Participating in discussions with Owner/ Engineer regarding related site work progress, drawings, sequence of works, quality aspects, etc
Maintaining Site QA /QC records & submissions and preparing Red Mark Drawings
Leading, supervising, motivating, coaching & mentoring a team of Engineers, Technicians & Drafters; managing the performance of team and delegating project work
Directing:
Development of new concepts and technology for transmission lines
Development and review of transmission lines specifications and standards and identifies and implements engineering methods and procedures to improve design and construction efficiency
Implementation of consistent design standards throughout Ever source
Management oversight of external engineering contracts supporting transmission lines efforts
Scheduling of resources and tracking of performance
Preparation of regulatory approval applications for transmission lines
Preparation & approval of project cost estimates, project authorization costs, and schedules for transmission overhead and underground projects
Selection of routing for transmission lines, working closely with Ever source Sitting staff
Coordination of transmission engineering and design developmental activities with other Transmission Engineering & Operations functions
Analysis & reporting of transmission system performance and bulk power system disturbances to Transmission Operations
Initiation, evaluation, and administration of engineering contracts related to transmission lines
Development, approval process & maintenance of engineering, design, construction, equipment, and material specifications and standards
Qualification of prospective supplier's equipment, materials, technical competence & production capabilities
Forecast of equipment and material needs, the initiation of bid solicitation by the Purchasing & Materials Management group, and the technical evaluation of bids for equipment and materials
Interpretation and application of various regulations, codes, and standards pertaining to transmission lines
Representing ever source on various business-related committees, engineering societies, joint study groups and industry standards groups
Formulating & executing the Asset strategy for aging overhead and underground infrastructure
Working on a variety of transmission & distribution projects, with the liberty to take on a project management role as desired
Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission Company Ltd
Pune, Maharashtra
11.2018 - 10.2021
MSETCL – Conversion of 132KV DC Transmission Line of 132kv UG Cable Work, Projects Undertaken:V Cable Project -MSETCL PUNE (For Sec.No.11, 1.1AA)
Joint Bay Construction -7nos–Joint Bay Construction Work for MSETCL Project Other Employment and Labor Supply Work
OFC Cable laying including all excavation work, Laying of HDPE ducts splicing, OTDR testing
Commissioning of OFC for 48F OFC cable for of 132KV MSETCL Project of Civil & Erection Work for underground cable laying
Projects Undertaken:V D/C Solapur – Karad LILO (143 km) (Successfully commissioning) 400 KV D/C Solapur – Kolhapur TL (328 km)KV D/C Pune – Parli TL, Successfully commissioning on rated voltage)
Role:
Creating Monthly Reporting on various project activities at various sites
Interfacing with client on a daily basis and maintaining cordial relationship with them
Preparing cost effective design basis with respect to project specification & related codes
Developing master document list for civil activities
Performing:
a
Civil design analysis and calculations as per the project requirements /DBR
lbd
Fie survey & investigate to prepare engineering drawings Review of Design Drawings
c
Study of Construction Drawings and preparation for works
Carrying out analysis of design issues and recommending corrective actions Determining the construction cost and material estimates based on civil designs
Planning & coordinating drawing availability for the required sequences with the Work Sequences Reviewing & finalizing list of Material Submitting and coordinating & obtaining approvals Planning of Manpower, Work Sequences and Activities
Evaluating the Quantity of materials utilized and confirming with Drawings
Developing & reviewing design documentation & drawings in line with required sequence of civil site works and the over project time schedule
Evaluating& approving Shop Drawings and other site engineering documentation
Senior Engineer
Bajaj Electrical Ltd
Mumbai, Maharashtra
09.2008 - 10.2009
A 75-years old trusted company with a turnover of Rs
2763 crore, is a part of the US $7 billion (over INR 38,000 crore ) "Bajaj Group"
Project Undertaken:
MSETCL 220 KV D/C Ghatanji – Yavatmal TL, :
Supervising the entire Site Works and performing stage & final Inspections of Site Works
Executing site work as per approved shop drawing; ensuring effective implementation of all tests & inspection schedule and coordinating with various teams to perform quality audits on processes
& controlling Sub Contractors Work Progress monitoring & controlling materials & stores
Project Engineer
Instalaciones Inabensa SA, Power Grid Corporation of India Ltd
Engaged in site supervision, execution, material planning and erection of TL Line Administered contractors and sustained site safety and quality of work as per standards Governed a wide range of activities including site execution, planning
Preparing DPR (Detailed Progress Report), providing technical sanction to work, performing routine site
inspections, identifying & auctioning the problem areas, floating & approving tenders and handing over the site to the end-user
Assisting the Project Team in formalizing the Project Quality Plan (PQP) and implementation of the same as & when required
Fulfilled site statutory compliance's, maintained good relationship with client and contractors
Ensured accurate documentation and records for Client Inspection and Approvals
Contractor bill certification for work done with material reconciliation of material issue from site store Coordination and liaising with client, govt
Authority, Electrical Inspector and Locals
Acquired certification of contractor invoice for supply and execution and recommendation for payment Reported top management on likely delay and recommended methods to overcome delays
Managed overall responsibility from workplace until work completes
Initiation ,evaluation, and administration of engineering contracts related to
transmission lines.
Senior Engineer
APPROVAL
01.2006 - 01.2007
Achieved live line stringing of:
Second circuit continuously done without any outage of line under supervision of Mr
Naik (, Live stringing
14 km out of 87, 220kv D/C Dimapur -Difu TL for Inabensa SA in year 2005 within 20 days
43Km out of 112 km, 400 kV Solapur – karad LILO for RPTL in year 2011 within 30 days with 2 gang
OPGW circuit and removal of existing earth wire continuously done without any outage of line under supervision of Mr
Ram Kumar (PGCIL, Ramagundan) in 2018
Live line OPGW stringing
132 kV samalkota - tadipalligudamTL
187 KM
1)220 kV Rajmundry- Elluru- Guntur TL - 393KM
400kv Vijayawada - ongle TL - 227 KM
400 KV Vijayawada - Kavali TL - 128 KM
220 kV Ongle - Kavali TL - 42KM for Varrsana Ispat ltd in 2017 within 10 months
Steered efforts in successfully completed special type foundation (1234 cu.) Butt/Leg Extension on line under supervision of Mr
Purohit (SE /CE of RRVPNL)
Butt joint foundation
400 KV D/C Baripada - Bhadrak TL, 3 nos of foundation (Butt joint) for inabensa SA in Orrisa in year 2006 completed in one week
D/C Phagi - Ajmer TL 11 nos of foundation (butt joint) for varrsana ispat limited in year 2015 at Rajasthan completed in two months
Played a vital role in special type tower extension DD +100 mtr of river crossing of river span 1135 mtr for the line Baripada – Bhadrak TL under supervision Mr
Banerjee (Senior Manager, PGCIL) within 20 days in year 2004.foundation erection and stringing of DD+100 river crossing tower (400kv quad) in Nogaon - Dhekiyajuly TL for inabensa SA in year 2005
Distinction of successfully constructed special types of different Leg Length (0, +3, +6 &+9) of Foundation (9 Tower) within a shortest span
In 400 KV D/C phagi- Heerapura -Ajmer TL, Different level leg foundations and erection in 1 tower Leg A - +0 / Leg B - +6 / Leg C- +9 and Leg D - +6 at Srinagar, Rajasthan (Loc
No - 38AA/4) with special revetment Size 18 mtr × 16 Mtr × 6.5 mtr (height)
Construction method: - R R Machinery completed in 25 days
HANDS-ON EXPERIENCE AND EXPERTISE IN SURVEY, LEVELLINGAND CONTOURING
( LANDSURVEYANDTRANSMISSIONLINESURVEY )
Survey
Selection of Route
Three Alternative Route selected out of which Shortest length to be selected (BEE Line), hence least capital cost
Ease during construction and ease in maintenance of the line (route near roads for easy approach &accessibility)
Requirement of future loads (sub stations) near the proposed route so that the line can be easily connected
Reconnaissance Survey and Measurement of Resistivity
Reconnaissance survey of the transmission line route is to be carried out for deciding upon the most economical line route and the most economical location of towers in view of the high cost per location
The G
T
Sheets of the Survey of India are the best available maps
The maps covering the complete proposed route of the line shall be obtained
The work of reconnaissance survey is essential for the purpose of establishing control points and collection of first-hand information of various important field data required for transmission line works
These are as belo
Crossing points of major EHV lines (66 kV and above) & details of the lines
Crossing points of Railway Tracks & details of such points
Crossing points of major rivers & details of such points
Type of terrain and nature of soil strata along the line route
Important villages or towns coming enroot
Measurement Of Earth Resistivity:
Fixing of Route Alignment
Fixing of angle tower positions
Finalizing of crossing points of major EHV lines (66 kV and above) & details of the lines.
Measurements of the angles of deviation at all angle / section points
Crossing Of Power Lines:
The crossing of existing power lines at an angle as close to 90 degrees as possible
Crossing Of Railway Tracks
The angle of crossing preferably be 90 degrees, but an angle of up to 60 degrees may be Permitted in special cases
The crossing span shall be restricted to 300 meters or to 80% of the Basic span of the towers of the relevant voltage
Crossing Of Roads:
Right Of Way:
The width of the right of way should be kept as per the provisions of the applicable part / section of the Indian Standard Code of Practice for Design, Installation and Maintenance of Overhead Power Lines (IS: 5613)
Route Marking:
At the starting point of the commencement of route survey, at all angle / section points, at every 1.25 km
Or part thereof, and at the end point of the route survey, concrete pillars 200 x 200 mm square and height 300 mm buried firmly in the ground for easy identification
The top of these pillars shall be 50 mm below ground level and should not normally project above the ground level
A wooden peg of size 50 x 50 mm and length 150 mm is embedded in the Centre of the Concrete pillars when they are casted
Nails of 25 mm length shall be fixed on the top of these pegs to indicate the location of the Centre of the survey instrument.0) Plotting Of The Route On The Map:
The line as surveyed is plotted on the G
T
Sheet maps indicating all the angle points
Approvals & Clearances for The Line Route, OF THE POWER & TELECOMMUNICATION CO ¡V ORDINATION COMMITTEE (PTCC):
APPROVAL OF THE AVIATION AUTHORITIES:
APPROVAL OF FOREST DEPARTMENT:
APPROVAL OF RAILWAY AUTHORITIES:
APPROVAL OF ELECTRICAL INSPECTOR:
APPROVAL OF NHAI0) Detailed Survey (Modern Technique) and Plotting of profile
The line route worked out during the preliminary survey, with changes if any, is used as the reference
The measurements of the angle points are again done
These angles are indicated as Right (R) or Left (L) as per the direction of deviation with reference to the starting point
The levels of the ground profile along the route of the line are taken
The reduced level (R.L.) of the ground at the starting point of the line is taken as 100.00 meters.0) Plotting Of Profiles:
Tower Spotting, Span and Tower Schedule
Key Result Areas:
Contributed in assessment of quantities, rate analysis, etc
Dealt with techno–commercial aspect of the project, which involve preparation of billing to Client certification
Prepared BOQ, Reconciliation, Auto CAD Drawings, etc
Coordinated with Sub-contractor and Client
Report detailing about day-to-day work activities through daily work report from working site to head office
Supervised all day-to-day activities executed at site with quality & safety
Interacted with Vendors, Contractors and Electricity Boards
Managed overall responsibility from workplace until work completes
Created technical drafts & advice and coordinated in technical issues with Site Management Team
Administered the entire Material Management which involves material planning, scheduling & storing required for execution of work
Identified the problem areas & contractors’ requirements of resources
Understood technical specifications, contractual terms & conditions and statutory requirement of bids
Varrsana Ispat Ltd
01.2000
VIL) is a public Ltd
Company incorporated in the year
VIL started as an Internet Service Provider and a Rice Processor
Subsequently, VIL embarked on a project to set up an integrated steel plant at Varrsana in Gandhidham (Kutch) in (Gujarat)
Projects Undertaken:
400, D/C Phagi – HeerapuraTL (Successfully commissioning on rated voltage)
Maintaining the track of material stock availability against work scheduling, inventory control of stores and prepare the critical material procurement
Checking the actual Bill of Quantity (BOQ) with LOA, analyzing the deviation for the entire project and submitting the timely proposal so technical and LOA amendment of the client
Coordinating with Subcontractors for earlier completion of projects, verification / cross check of bills and material reconciliation
Preparing daily, weekly & monthly progress reports for review meetings with clients
Attaining & processing all company Erection Bills in specified target given by company and coordinating with client for processing at H.O
Level
Liaising with clients for finalization of LOA, amendment, reconciliation and closing all activities like, final BOQ, time extension, joint measurement & inspection, MB recording after works completion and handing over and taking over formalities
Providing technical drafts & advice and coordinating with Site Management Team regarding the technical issues Interacting with clients & contractors, coordinating with various disciplines and permitting agencies; acting as a Mentor for Junior Engineers
Creating tools & methodology to streamline the structural analysis, performing transmission line analysis and evaluating the structure conditions
Performing inspection & evaluation of concrete foundation of transmission structures Analyzing & approving engineering design submitting; estimating projects & develop proposals
Resolving site queries, attending site meetings and performing site inspections during the construction phase of
projects
Maintaining complete project documentation with respect to transmission line design & construction, including all completion packages, as-built requirements and return data information
Making & maintaining appropriate commitments to project teams and coordinating design activities with multi- disciplined project team members
Preparing: Site Working Documentation Bar Bending Schedules, Site Modifications (required for site conditions) and obtaining clearances for the same from Design Department
Method Statements, Submission and Obtaining Approvals; creating Site Work Check Lists (QA Formats)
Education
AMIE in Civil Engineering -
Kolkata University
01.2002
Diploma in Civil Engineering -
Board of Technical Education, Mumbai
01.2000
Secondary Examination -
Board of Sr. Sec. Education, Nagpur
01.1995
AMIE in Civil Engineering -
Kolkata University
Skills
Project Management
Turnkey EPC Projects
Construction Management
Erection, Testing & Commissioning
Quality Assurance & Control
Contract Management
Budgeting & Cost Control
Client Relationship Management
Team Management
Resource Management
Tender Evaluation & Contract Management
Design Management
Quality Control
Surveying
Levelling and Contouring
Route Selection
Reconnaissance Survey
Measurement of Resistivity
Fixing of Route Alignment
Crossing of Power Lines, Railway Tracks, and Roads
Right of Way
Route Marking
Plotting of Route on Map
Approvals & Clearances for Line Route
Detailed Survey and Plotting of Profile
Tower Spotting, Span, and Tower Schedule
Knowledge of IS Code of Practices
Construction Monitoring
Material Management
Technical Drafting
Site Inspections
Coordination with Consultants, Architects, Clients, and Contractors
Multi-Unit Operations Management
Languages
English
Proficient (C2)
C2
Hindi
Beginner
A1
Bengali
Beginner
A1
Marathi
Bilingual or Proficient (C2)
Timeline
PROJECT MANAGER & RESOURCE MANAGER
TRANSRAIL LIGHTING LIMITED
05.2024 - Current
Sr .Manager
HG Power Transmission Sdn Bhd
12.2022 - 03.2024
Finolex J-Power Systems Private Ltd, Maharashtra State Electricity Transmission Company Ltd