Summary

Experienced Associate Manager in the Operation Department of India's largest supercritical thermal power station. Proficient Unit Controller for 660 MW Units, overseeing turbine and boiler operations in the CCR/Desk. Demonstrated leadership in 400KV switchyard operations at Adani Power Mundra. Certified Boiler Operation Engineer with expertise in SAP modules and SOP enhancement. Committed to safety, regulatory compliance, and continuous improvement for efficient plant operation.

Overview

12
12
years of professional experience

Work History

Associate Manager

Adani Power Ltd
Mundra
04.2020 - Current

Taking a leadership role in the operations of 400KV switchyards for PH3 and PH4 at Adani Power Mundra. This includes closely monitoring operation & maintenance activities for 400KV switchyard equipment, such as Generator Transformer, Reactors, and SF6 breakers. Proficient in utilizing SAP modules for daily operational updates and the issuance of Maintenance Permits to Work (PTWs).

Serving as the Unit Controller for 660 MW Units, overseeing both turbine and boiler operations in the Central Control Room (CCR/Desk). Responsible for ensuring smooth and efficient operation of critical components.
Actively involved in the review and enhancement of Standard Operating Procedures (SOPs) to ensure the safe and efficient operation of equipment within the power plant. Providing valuable insights and recommendations for continuous improvement.

Deputy Manager

Adani Power Ltd
Mundra
04.2016 - 03.2020
  • Successfully served as the Desk Engineer/Unit Controller for 660 MW Units, managing turbine and boiler operations with precision from the Central Control Room (CCR/Desk). Successful start-ups and executing major shutdowns and overhauling maintenance for the 660 MW units.
  • Demonstrated effective crisis management skills by successfully handling major emergencies such as Mill Fire, MD-TDBFP tripping, PA, ID, FD fans tripping, APH failure, preventing unit tripping and minimizing operational disruptions.
  • Successfully obtained certification as a Boiler Operation Engineer from the Government of Gujarat under the Boiler Operation Engineer's Rule 2011 in the year 2018.

Assistant Manager

Adani Power Ltd.
Mundra
06.2013 - 03.2016
  • Served as a DCS Engineer at Adani Power Limited, Mundra, Gujarat, operating within a 5X660 MW power plant equipped with Invensys Foxboro DCS. Responsible for the efficient and safe operation of boilers, turbines, and generators, including overseeing startup, shutdown, and emergency procedures. Proficient in issuing Permit to Work (PTW) through SAP. Conducted thorough checks on equipment efficiency, plant performance, auxiliary power consumption, and chemistry. Compiled and prepared daily reports highlighting key operational parameters, contributing to the overall performance evaluation of the power generation unit.

Senior Engineer

Adani Power Ltd.
Mundra
06.2012 - 05.2013
  • As a dedicated member of the operation-commissioning team, I actively contributed to the successful commissioning of the Ash Handling System for the 660*5 MW thermal power plant.
  • Held the pivotal role of InCharge, overseeing the operation team during the integrated Ash Handling System commissioning.

Graduate Engineer Trainee

Adani Power Maharashtra Ltd.
Tiroda
09.2011 - 05.2012
  • Played a pivotal role as a key member of the operation-commissioning team for the commissioning of Balance of Plant (BOP) systems in 3300 MW Thermal Power Plant.

Education

B. Tech. in Electrical Engineering -

Charotar institute of Technology, Changa, Anand-Gujrat
01.2011

Diploma in Electrical Engineering -

TFGP Gandhidham
01.2008

10th Std Examination -

NPN school, Anjar
01.2005

Skills

  • Operation and Control
  • Safety Management
  • Technical Proficiency
  • Adaptability
  • Energy Efficiency Optimization
  • Emergency Response
  • Continuous Learning

Personal Information

  • Date of Birth: 11/15/89
  • Gender: Male
  • Marital Status: Married

Major Responsibilities

  • Unit Controller of 660 MW Units (both turbine and boiler CCR/Desk operation)
  • Take lead in Start-ups & Major Shutdowns/Overhauling maintenance jobs of the 660 MW-units
  • Experienced on how to give proper Electrical isolations ranging from small breakers to switchyard isolations and have good knowledge of Electrical Systems
  • Implemented various modifications which resulted to increase the efficiency of the system and ensured an optimized use of resources
  • Well acquainted with SAP Modules for daily operation updates and issue of maintenance PTWs
  • Handled major emergencies like Mill Fire, MD-TDBFP tripping, PA, ID, FD fans tripping, APH failure etc and avoided tripping of unit many times
  • Have good experience and knowledge on Turbine, Boiler and BOP field area

Training

  • Completed a 15-day Conduction and Power Plant Familiarization Training in the 4620 MW Adani Power Limited Super Critical Thermal Power Project located in Mundra, Kutch district, Gujarat.(2011)
  • Underwent a 15-day Behavioral and Management Training at the AMDC Center of Adani Power in Ahmedabad, Gujarat.(2011)
  • Engaged in a 6-month On-the-Job Training at the 3300 MW Adani Power Maharashtra Limited Super Critical Thermal Power Project situated in Tiroda, Gondia district, Maharashtra.(2012)
  • Successfully concluded a 1-month Vocational Training at the 220kV Substation in Tappar. (2011)
  • Received specialized training in the operations of 660 MW and 330 MW Thermal Power Plant Simulators.

Languages

English, Hindi, and Gujrati.

Extracurricular Activities

As the opening batsman, contributed to Adani Power Ltd cricket team's runners-up finish in 2014 and led to victory as champions in the Adani Cricket League 2022.

Winner of cross country running competition organised by green-club CITC changa 2008.

Hobbies and Interests

  • Weight Lifting
  • Running
  • Cricket
  • football

Disclaimer

I hereby declare that the information furnished above is true to the best of my knowledge.

Timeline

Associate Manager

Adani Power Ltd
04.2020 - Current

Deputy Manager

Adani Power Ltd
04.2016 - 03.2020

Assistant Manager

Adani Power Ltd.
06.2013 - 03.2016

Senior Engineer

Adani Power Ltd.
06.2012 - 05.2013

Graduate Engineer Trainee

Adani Power Maharashtra Ltd.
09.2011 - 05.2012

B. Tech. in Electrical Engineering -

Charotar institute of Technology, Changa, Anand-Gujrat

Diploma in Electrical Engineering -

TFGP Gandhidham

10th Std Examination -

NPN school, Anjar