- Responsible for the supervision of various construction activities. as mentioned below:-
- Foundation:-Well foundation, Pile foundation, Raft foundation etc.
- 2 nos. of ROBs (more than 250 piles)
- PSC-I Girder, Box Girder, Post-tensioning
- 4 nos. of Major Bridges (Span Length 40m each X 4 nos.)
- 19 nos. of Minor Bridges (R.C.C T-beam Girder, simply supported slab)
- 17 nos. of RCC Slab Culverts
- 2 nos. of Box Culverts
- 2 nos. of Hume Pipe Culverts
- Checking of tilt & shift of the well, all survey-related work (alignment checking, level & layout checking etc.) & maintaining and recording the MBs, Site diary, and Daily diary.