Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
An astute professional with 14+ years of experience in Telecom domain .
Working as a NTAS 21.8 Testing & Deployment Lead engineer.
NTAS 21.8 is on cloud environment (OpenStack and Kubernetes).
Deploying and Testing New Feature and new release for NTAS in Lab.
Testing and verifying test cases on basis of design LLD and call flows.
Verifying test cases with help of Wireshark.
Troubleshooting and doing correction as per R&D and software development Team recommendation if any test case or feature failed. Co -ordination and provide technical support during Acceptance Test with customer.
Traffic migration from Other Vendor TAS to Nokia TAS.
Traffic or server migration from own premises to public Cloud AWS.
Planning and optimization for IMS Nodes (Nokia NTAS 20.5 & CFX-5000 20.5 & SBC 20.5 in OpenStack, cloud environment).
New Feature implementation and QOS implementation in Volte Nodes like NTAS, SBC, and CFX in cloud environment, OpenStack.
Planning of new nodes configuration with existing nodes Volte and CS core.
Planning of new changes in IMS nodes as per business proposal.
New Project Handling Volte and IMS.
Traffic or server migration from own prim infrastructure to public Cloud AWS.
Traffic, Nodes migration from legacy bare-metal server to virtualized & Cloud environment.
Involved in meetings for pilot configuration for 5GC in VOLTE CFX/TAS.
Technology & Platform
CFX -5000 (P-CSCF, I-CSCF, S-CSCF, E-CSCF, I-BCF), TAS (Nokia O-TAS), BGW.
Nokia TAS were deployed on VMware based private Telco Cloud .
My Job Profile: -
Worked as SME for NOKIA TAS 19.5 and Nokia CFX 5000 19.5 on Telco cloud environment CBAM, CBIS, VMware, VCenter, vSphere.
My area of worked were troubleshooting of VOLTE issue by using Wireshark traces.
Troubleshooting for Infrastructure issue of Nokia TAS and CFX 5000 in cloud environment.
Responsibility for E2E IMS VOLTE issue and fault troubleshooting and resolution for O-TAS, CFX500.
Involved in pilot configuration for 5GC in VOLTE CFX/TAS.
SME for Nokia MSS and GCS
Supporting to configuration Team for NOKIA DX200 & ATCA MSS, and IPA2800 & ATCA MGW.
SPOC for Maharashtra & Gujarat Circle for configuration & any fault resolution.
CD upgrades of ATCA MSS, DX MSS & IPA 2800 MGW.
Care Case and Emergency handling.
SPOC for configuration Team.
Supporting to fault management Team for Hardware fault resolution.
KPI analysis.
Preparing MOP for Critical/Major Changes in NE.
Projects handled in Vodafone Spacetel Ltd: - Work Profile Responsibilities completed for Vodafone Spacetel Ltd MP&CG circle: - Fault & Preventive management: - Monitoring Call Clearing Cause Codes and acting accordingly. z Network Resource planning and Optimization: - z Configuration Management: -
MSS pooling and dual homing of all MPCG BSC’s.
FCR (forced call routing for tele verification) database loading in all MPCG VLR.
Home call routing feature implementation for pan India Vodafone in roamers.
TDM to Sigtran traffic migration with all core nodes(MSS/GCS/HLR/STP).
NLD traffic migration from TDM to SIP with NGN.
MNP database planning/database loading in all core network element and PAN India IOT (Inter operator testing).
3G & 2G ICR Implementation & testing in core nodes as a seekeroperator.
CMN connectivity: CMN connectivity with NGN for VF-to-VF Circle Voice connectivity over BICC.
SPOC for Chhattisgarh Switch Location.
Undertaking Health checkup of the GMSC/MSS/MGW/HLR/GCS/DXA/One-NDS.
Raising Electra Case to technical support team in case of emergency, technical issue and providing them with various alarm logs from the system and coordinating with them for any solution given by them.
Diagnosis/Replacement of faulty hardware of Core nodes and HMS/Boot image version upgrade of replaced hardware of MGW.
Audit of all core nodes as per NSN guideline to prevent any emergency during festive season.
Co-coordinating with Project Team to carry out Commissioning and Integration of new networkelement.
HLR ICP check as a prerequisite for CD up gradation in co-ordination with SNOC.
Co-ordination with Material Warehouse for Repair & Replacement of faulty cards of Network Elements.
Periodic System Fallback of core nodes in co-ordination with SNOC.
Analyzing Daily Traffic Reports and pointing out high utilization POI’s & Ater trunk groups and plan for the augmentation accordingly.
Plan for the Switching capacity augmentation by tracking DSPresource utilization/VLR utilization/Erlang utilization/CPU processor load utilization etc.
Planning of switching network architecture for future requirement.
Analyzing call failure report and plan accordingly to improve ASR, CCR.
Maintaining database of free E1 resources & Transmission Media ports.
Creation of CCS#7/M3UA signaling link, link set & route set.
Creation of trunk group & Route & addition/Deletion of E1’s in trunk group.
BTS/BSC creation and rehoming as per RF planninginputs.
B Number/GT translation/MGT case definition& analysis in core nodes.
UPD creation and modification for new feature implementation and NB traffic migration.
Pre/EOS/Attribute analysis creation and modification for new feature implementation.
AUC loading/CUG creation/roaming profile/USSD definition inHLR.
Software up gradation and patch loading.
Announcement/License loading in core nodes.
Subscriber management (creation, deletion & modification of subscriber profiles) in the HLR as per requirement.
PRIconfiguration for different VAS servers like OBD’s, MCA, CRBT, Background music, INIVR, Customer call center.
Telco Cloud based on OpenStack ,VMware and AWS
undefined