Summary
Overview
Work History
Education
Skills
Timeline
Generic

Dheeraj Gupta

Dubai

Summary

Accomplished Senior Mechanical Engineer with a proven track record at ARENCO Engineering & Architectural Consultants, specializing in HVAC system design and construction. Expert in interpreting architectural and engineering drawings, ensuring seamless integration of complex systems. Demonstrates exceptional technical consulting abilities and a results-driven approach, with a strong foundation in building energy systems and project management.

Overview

17
17
years of professional experience

Work History

Senior Mechanical Engineer

ARENCO Engineering & Architectural Consultants
2016.09 - Current
  • B+G+6thFloor Residential tower at Barsha (Dubai)

It is 6 story residential tower with basement parking floor , which consist of VRF air conditioning system, BMS, LPG piping, Plumbing, Fire protection work.

  • G+2 (33 Nos.) Townhouses Al Bada, Dubai
  • G+2 (48 Nos.) Townhouses at JVC, Dubai

It is commercial townhouses with VRF system and Energy recovery ventilator.

  • Hotel Tower; Al Merkadh, Meydan (Dubai)

It is a 32 story building having 24 guest floors, 1 dedicated mechanical floor, Basement, 4 Podium Parking and roof floors,Main Kitchens, F&B Speciality Restaurants, Swimming Pool, Private pools, Banquet Hall areas.


  • Hotel Towers; Palm Jumeirah (Dubai)

It is 608 keys Five Star Hotel shall be operated by “M/s Hilton” & “M/s Marriott” having 13 guest floors, 1 dedicated mechanical floor, Basement and roof floors.

It consist of 3800 TR centralized district cooling HVAC system which includes heat recovery through toilet exhaust. Project cost of around 1.8 Billion AED includes Hotel Guest Floors, Main Kitchens, F&B Speciality Restaurants, Swimming Pool, Treatment rooms / Spa, Meeting Room/ Board Room areas.

  • G+2P+6thFloor Residential tower at Satwa (Dubai)

It is 6 story residential tower with 2 podium parking floor located in Satwa area, which consist VRF air conditioning system, BMS, LPG piping, Plumbing , Fire protection works etc.,

  • Golden Sand Laundry; DIP

It is an automatic tunnel washing system laundry having G+M steel structure.

It consist of 1200 TR centralized district cooling HVAC system which includes heat recovery through toilet / general exhaust and includes laundry special requirements i.e. compressed air, steam piping, Vacuums ducting, LPG piping, Plumbing , Fire protection & BMS work.

Mechanical Engineer

M/s Heberger Engineering Consultants
2014.11 - 2016.09

Bloom Central (Abu Dhabi)

It is a mixed used development by one of the repute client M/s Real Estate Group LLC which consist (5 Basement Parking, Office Space, Residential Apartments, Five Stars Hotel “M/s Marriott Group”. Marriot Executive apartments 25 floor with 2 mechanical roof floors.

It consist of 3600 TR centralized HVAC system which includes heat recovery through toilet exhaust. Project cost of around 800 Million AED includes Hotel Guest Floors, Main Kitchens, Laundry, Specialty Restaurants, Ball Rooms, Atrium, Swimming Pool, Jacuzzi, Treatments / Spa, offices & apartments.

Emirates National School “ENS” (Ras Al Khaimah)

It consist of 4000 TR centralized HVAC system which includes heat recovery through toilet exhaust. Project cost of around 500 Million AED includes 3 School section, Court Yard, Auditorium, Library, Swimming Pool, Kitchen and staff accommodation (g+5thFloor).

Mechanical Engineer

ETA-M & E (Associated Construction and Investments
2012.09 - 2014.10

Cleveland Clinic Hospital – consisting of 360 bed five start facility hospital towers namely (Car Park, Diagnosis & Testing, Clinic, ICU/ Swing & Patient Tower, 3B+G+21+Terrace), with a total plot area of 94,000 smtr. The Architects are Henningson, Durham and Richardson International - UK, Architect Consultants Aedas - Singapore, Project Management Consultant – Jacobs’ Lead Consultant Aecom – UAE, Lighting Design are Davis Langdon – UK, MEP supervisor are KEO – UAE.

Sr.Executive & MEP Coordinator

Oberoi Realty Limited
2011.02 - 2012.09

International Business Park – Phase II & III consisting of two commercial towers namely South Tower (5B+G+30+Terrace+LMR & OHT), North Tower (5B+G+40 floors + Terrace + LMR & OHT) and Connecting Podium (5B+6P+Club House) with a total built up area of 300,000 Sq. ft. The Architects are Kohn Pederson Fox Associates - USA, Structural Consultants are Leslie E. Robertson Associates - USA, Vertical Transportation are Fortune Consultants Limited - USA, Façades are Meinhardt International – Singapore, Landscaping are Place-media, Landscaping Architects Collaborative – Japan, Lighting Design are Isometrix Lighting Design – Hong Kong, Parking are Walker Parking Consultants – USA, MEP are Neil soft – India & Red Engineering – Dubai, UAE and LEED are EN3 – India.

HVAC Engineer

BLUE STAR LTD
2007.09 - 2011.02

Ä Commercial & five stars hotel ‘Westin Mumbai Garden City’ (196 rooms + 4 royal suit) consist of (2B+G+32+LMR)built up area of 8.76 lacs sq. ft. 3000TR water cooled centralized air conditioning system.

Ä Oberoi International School (3B+G+8 Floors) built up area 4.19 lacs sq. ft., which consist 750TR air cooled centralized Ac system.

Ä Growell mall (B+G+4 floors) built up area of 3.3 lacs sq. ft. area, which consist 800TR water cooled as well as 800TR air cooled centralized Ac system.

Ä Bio medical lecture halls (G+2 Floor) which consist 300 TR water cooled system in IIT Mumbai.

Education

Diploma in Heating Ventilation & Air Conditioning - Heating Ventilation & Air Conditioning

Suvidhya Institute of Technology
Mumbai, India
09.2008

Bachelor of Engineering - Mechanical Engineering Technology

RGPV University
Bhopal, India
06.2007

Skills

  • Well-versed with building energy systems, HVAC Central Utilities, Plumbing Services and Fire Protection Systems, Vertical Transportation, Building Management System, LPG, Steam Boiler, Pneumatic System, Kitchen Equipment’s, SPA Systems, Building Maintenance Unit.
  • A depth of experience in HVAC system (District Cooling) design & construction.
  • Proficient in architectural and engineering drawing interpretation & in overall integration of design engineering construction start-up and turnover.
  • Performed technical consulting assignments to support specific client requests.
  • Worked and well acquainted with MS-Office (Word/Excel/PowerPoint), Auto Cad -2010, MS-Projects & Internet Applications.

Timeline

Senior Mechanical Engineer

ARENCO Engineering & Architectural Consultants
2016.09 - Current

Mechanical Engineer

M/s Heberger Engineering Consultants
2014.11 - 2016.09

Mechanical Engineer

ETA-M & E (Associated Construction and Investments
2012.09 - 2014.10

Sr.Executive & MEP Coordinator

Oberoi Realty Limited
2011.02 - 2012.09

HVAC Engineer

BLUE STAR LTD
2007.09 - 2011.02

Diploma in Heating Ventilation & Air Conditioning - Heating Ventilation & Air Conditioning

Suvidhya Institute of Technology

Bachelor of Engineering - Mechanical Engineering Technology

RGPV University
Dheeraj Gupta