Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
Designations & Promotions :
13th Feb 2012 : Engineer – Drafting & Detailing
1st Jan 2013 : Engineer – Structural Design
1st Jan 2014: Sr. Engineer – Design & Detailing
1st Jan 2015: Asst Manager – Design
6th April 2018: Asst Manager – Design & Detailing
18th July 2018: Manager – Design & Detailing
18th March 2020: Sr. Manager – Design & Detailing
6th Feb 2023: Sr. Manager – Engineering & Product Development
Major Contributions –
Standardization –
Year 2012
ISO 9001 – 2008 Documentation preparations
Lighting Segment
3 to 12m octagonal street light poles (10 designs)
3 to 12m conical street light poles (10 designs)
Foundation designs for OCT & CON poles (20 designs)
Year 2013
Lighting Segment
12m to 30m High Masts for 5 wind zones (50 designs)
Traffic Light Poles & VMS Structures (8 designs)
Telecom
Year 2015
ISO 9001 – 2015 Documentation preparations
ISO 14001 – 2004 Documentation preparation
BS OHSAS 18001 – 2007 Documentation preparation
Universal Transition base for type test at CPRI (max. 40,000 kN.m pole tested successfully)
Year 2021
30m Telecom Monopole for antenna load capacity of max. EPA 6,12,15,18 & 25 sq.m. (5 designs)
Indus / NDMC : 24m & 30m camouflage Monopole (2.0m dia x 4.5m H) (Year 2018)
EFKON / HMDA : 01_7.6x6.1m Span Cantilever Gantry for VMS (5m x 1.5m) (Year 2018)
EFKON / HMDA 22m dual pole Gantry for VMS (6m x 2m) (Year 2018)
L&T 12m & 25m Smart pole for Raipur Smart City (Year 2018)
L&T Mauritius Metro – Traction Masts (Year 2019 & 2020)
Quess Corporation / Ahmedabad Smart City – VMS Monopole (7.7m x 2.9m VMS)
L&T Dhaka Metro – OHE Portal Structure (Year 2019 & 2020)
L&T Dhaka Metro – OHE cantilever structure (Year 2019 & 2020)
Hatcom, Qatar - 25m Palm Tree Monopole (Fifa World cup) (Year 2021 & 2022)
Hatcom, Qatar - 15m Palm Tree Monopole (Fifa World cup) (Year 2021 & 2022)
Hatcom, Qatar – 30m Camouflage Monopole (for Vodafone & Ooredoo) (Year 2019)
Pune Metro – Roof Top Monopoles (Year 2020 & 2021)
Mumbai Metro – Roof Top Monopoles (Year 2019 & 2020)
Bangalore Metro – Roof Top Monopoles (Year 2022)
Indus – 30m Palm Tree Monopole (as per IS 800), order not received. (Year 2021)
Special Camouflage Structures for Oman, End Client OTC (Year 2022)
21m & 25m Camouflage Monopole (with Hinged doors) (Year 2023)
30m, 35m & 38m Camouflage Monopoles (Year 2022 & 2023)
35m Camouflage Monopole for Bahrain (Year 2023)
a. Preparation 3D model for STP
b. Preparation Contour Survey and Contour drawing in AutoCAD
a. Preparation of plan and c/s of bridge
b. Concrete and reinforcement drawing of box culverts
c. Preparation of reinforcement and concrete drawing for deck slab
a. Planning and Estimation
b. Preparation of concrete drawings (RCC)
c. Preparation of reinforcement drawings (Steel)
d. Preparation of Architectural 3D Model in AutoCAD
Engineering Product Design