Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Affiliations
Hobbies
Timeline
BusinessAnalyst
Farhan Mukri

Farhan Mukri

Sales Manager/ Customer Success Manager
Mumbai,Maharashtra

Summary

Helping Companies grow better by building marketing sales and service processes that accelerate sales growth.


Attention to detail | Client engagement | Team leadership | Quick learner | Creative | Enthusiastic | Problem Solving

Overview

7
7
years of professional experience
18
18
years of post-secondary education
4
4
Certifications
5
5
Languages

Work History

Sales Manager

EQVIMECH PRIVATE LIMITED
Navi Mumbai, Maharashtra
07.2019 - Current
  • Directed sales support staff in administrative tasks to help sales reps close deals.
  • Ensure that Product performs as per ASTM, ISO, EN, DIN, IS standards
  • Established ambitious sales targets, managed deployment strategies and developed go-to-market plans to capitalize on every revenue opportunity.
  • Developed sales strategy based on research of consumer buying trends and market conditions.
  • Forecasted sales and established processes to achieve sales objectives and related metrics.
  • Evaluated costs against expected market price points and set structures to achieve profit targets.
  • Resolved customer issues quickly to close deals and boost client satisfaction.
  • Attended industry shows, conventions and other meetings with primary mission of expanding market opportunities.
  • Established and cultivated solid business relationships with new or existing customers.
  • Ensure project milestones and overall schedule completion dates are met by managing the project's day-to-day activities
  • Handling the Human Resources part with Appointing the Sales & Production team, managing them for the growing purpose of organization.
  • Make sure the Product is delivered in time, with testing at factory & Pre-commissioning at Clients Facility.
  • Creating and maintaining a culture that values safety, health and cleanliness.
  • Establishing and maintaining all dimensional controls for the organization with smooth & appropriate functioning required for growth.
  • Updating company's accounts in optimum numbers to present Investors & Banks.

Project Engineer

ADEL AL SABT EST
Al Jubail, Est
04.2017 - 07.2019
  • Communicated with industrial equipment installers to deliver technical support throughout project execution.
  • Liaised with company executives and project managers to acquire resources to move projects forward.
  • Reviewed progress controls for project quality assurance.
  • Identified technical risks within managed projects.
  • AC Units, Exhaust Fans, Air Diffusers, Ducts & Installation of replaced Fans of same or similar Capacity,
  • Duct cleaning Process for Existing A/c Ducts, Smoke Exhaust System at Al Mouwasat
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines.
  • Renovation of Office, Kitchen, Store and Cafeteria with removal of old
  • Drafted system and equipment designs using CAD software.
  • Designed HVAC systems and specified components for successful installation and operation.

Project Engineer

JOHN GALT INTERNATIONAL
Mumbai, Maharashtra
10.2016 - 04.2017
  • Attended trade shows and seminars to promote products and network with industry contacts.
  • Developed internal processes and plans for mechanical verification, product development and factory processes.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Effectively developed models, assemblies and drawings using AutoCAD and SolidWorks.
  • Created preliminary layouts and made calculations regarding parts, labor and assembly.
  • Coordinated installation of systems, machinery and components.
  • Conducted tests of units and components, recording results.
  • Design and manufacturing of pantograph material mixture setup for mixing of copper and graphite material at 400 Bar pressure in a high-pressure autoclave vessel, fully
  • Automated system for pouring, mixing and pressurizing of material
  • Duties & Responsibilities:
  • Check and review the plans & specifications for the proper construction
  • Perform pre- inspection to ensure that all the installed material is within the standards in conformance to applicable drawings & specs
  • With collection & analyzing of data for Projects, Design & Modeling of structure, Manage supplier, Plan Integration of system as per Project sheet
  • Assists in preparation and implementation of Project Execution Plan (PEP)
  • Ensuring all procedures and calculations are submitted to the client for review and approval
  • Coordinates materials and assists in the logistics, its shipment and receipt at construction site
  • Provide full support as required by the Management for all project
  • Project Management: Large-scale project require the ability to manage time, supplies, personnel and funds
  • Keeps supplies ready by inventorying stock, placing orders, verifying receipt
  • Managing projects using engineering principles and techniques
  • Considering the implications of issues such as cost, safety and time constraints
  • Insure that all works done as per client requirements.

Engineering Trainee

LARSEN & TOUBRO (Pvt) Ltd
Navi Mumbai, India
06.2011 - 11.2011
  • Interpreted blueprints and technical drawings to analyze upcoming projects.
  • Documented survey information and organized data for review by senior engineers.
  • Managed technical integration, systems engineering program management, customer support and program management.
  • Identified and supported resale opportunities to achieve sales plans.

Engineering Trainee

AIR INDIA, Old Air Port
Mumbai
01.2013 - 05.2013
  • Designed and coordinated engineering tests and experiments.
  • Conducted root-cause analysis of component failure.
  • Developed new product design modifications.
  • Created 3D models from 2D drawings.
  • Collaborated with senior engineers on projects and offered insight.

Education

Bachelors Engineering - Mechanical

MS Saboo Siddik College of Engineering
Mumbai
06.2013 - 05.2016

Diploma - Mechanical Engineering

Fr. Agnel Polytechnic
Navi Mumbai
06.2009 - 05.2013

Secondary School Certificate -

Chembur Karnataka High School
Mumbai
06.1998 - 06.2009

Skills

Leadershipundefined

Accomplishments

  • Design Fabrication of Gesture Control wheelchair: Controlling Wheelchair using fingers gesture
  • Design & Modeling of Toggle Jack: Designing and creating 3D model & Drafting of Toggle Jack on Pro-Engineer
  • Design of C-Clamp: Study Design Aspects of C-Clamp
  • Fabrication of Coupling Rod of Locomotives Mechanism
  • Stress Analysis Using ANSYS
  • Design & Fabrication of Automatic Bottle Filling Machine: Liquid Filling Machine using motors & other electronic parts based on Mechatronics & Automation

Certification

3rd position at State Level Poster Presentation

Affiliations

Participated in TechFest' 2012-13: Member of MESA Committee.

Hobbies

· Communication for growth

· Travelling

· Reading

· Learning new set of skills

· Trekking

· Cricket

· Driving

· Inspiring young minds.

Timeline

Sales Manager

EQVIMECH PRIVATE LIMITED
07.2019 - Current

Project Engineer

ADEL AL SABT EST
04.2017 - 07.2019

Project Engineer

JOHN GALT INTERNATIONAL
10.2016 - 04.2017

Bachelors Engineering - Mechanical

MS Saboo Siddik College of Engineering
06.2013 - 05.2016

Engineering Trainee

AIR INDIA, Old Air Port
01.2013 - 05.2013

Engineering Trainee

LARSEN & TOUBRO (Pvt) Ltd
06.2011 - 11.2011

Diploma - Mechanical Engineering

Fr. Agnel Polytechnic
06.2009 - 05.2013

Secondary School Certificate -

Chembur Karnataka High School
06.1998 - 06.2009
Farhan MukriSales Manager/ Customer Success Manager