Summary
Overview
Work History
Education
Skills
Certification
DECLARATION
Timeline
Generic
GOURAV SAINI

GOURAV SAINI

Construction
Karnal

Summary

Civil Construction Professional with 14+ years of experience in project planning, structural erection, and site execution across elevated metro, viaduct, bridge, and high-speed rail projects. Experienced in launching girder operations, segment lifting, span alignment, bearing installation, grouting, and structural works. Skilled in managing erection sequencing, monthly targets, manpower and resources, subcontractors, quality control, project documentation, and client coordination. Proven ability to lead site teams, coordinate with multiple stakeholders, and deliver complex structure and launching activities safely, efficiently, and within project schedules.

Overview

2
2
Languages
7
7
Certifications
14
14
years of professional experience

Work History

Manager

Transrail Lighting Ltd
04.2024 - 08.2025
  • Directed 2 NRS launching girders with back feeding and 3 ground support systems while maintaining span alignment.
  • Managed pier-head segment erection, alignment, and leveling across station and structure work.
  • Coordinated launching girder assembly, transportation, dismantling, segment lifting, gluing, stressing, and port bearing fixing.
  • Drove monthly targets while keeping work aligned with quality compliance and site safety standards.
  • Coordinated with client and consultant on planning, execution, and interface management.
  • Maintained project documentation and supported method statement preparation, lift plan development, and temporary works design.
  • Trained supervisors, foremen, junior engineers, and site engineers while supporting resource deployment and work breakdown structure planning.

Deputy Manager

Dineshchandra R. Agrawal Infracon Pvt. Ltd.
03.2023 - 03.2024
  • Tracked alignment tasks per shift to support span positioning, bearing fixing, and grouting work.
  • Completed launcher assemblies per month while keeping launch sequences on schedule and safe.
  • Managed launching girder assembly, commissioning, transportation, and dismantling for major and minor bridge erection.
  • Performed segment lifting, precast pier-arm erection, prestressed I-girder placement, gluing, and stressing across site activities.
  • Coordinated client and consultant discussions while driving project planning, execution, and resource deployment.
  • Maintained documentation, trained supervisors and site engineers, supported quality compliance across project work.
  • Prepared method statements, lift plans, temporary works designs, and construction risk assessments for lifting activities.

ASST. MANAGER

GR Infra Projects Ltd.
12.2021 - 02.2023
  • Managed launching girder assembly, erection, transportation, and dismantling for station and parapet launchers.
  • Executed pier-arm erection, I-girder alignment, levelling, segment lifting, gluing, stressing, port bearing fixing, and grouting.
  • Coordinated with client and consultant on project planning, execution, and site adjustments for the Bangalore Metro Rail Project.
  • Maintained site documentation and supported training for supervisors, foremen, junior engineers, and site engineers.
  • Supported monthly target achievement through planning, resource deployment, and quality checks across station and erection work.

SR. Engineer (Projects)

Apco Infratech Pvt. Ltd.
01.2020 - 11.2021
  • Coordinated with client and consultant teams on drawings, design issues, and execution clarifications.
  • Planned and monitored minor bridge work across 295 spans, covering program updates, survey data, and daily progress.
  • Prepared contractual bills, certified quantities, and checked subcontractor billing against executed work.
  • Handled launching girder assembly, dismantling, and erection work for segment lifting, grouting, and span alignment.
  • Supervised port bearing, elastic bearing, gluing, resist concrete, expansion joint, and stitch concrete activities at site.

Construction Engineer Grade II

Simplex Infrastructures Limited.
11.2018 - 12.2019
  • Planned and programmed launching girder erection, studying drawings for assembly, alignment, segment lifting, gluing, stressing, and auto launching.
  • Documented parapet erection, expansion joints, recess filling, bearing installation, grouting, tendon grouting, and port bearing fixing.
  • Coordinated with client and design teams to resolve issues and keep work aligned to plan and quality requirements.
  • Supported labor contractor billing, daily reporting, and weekly target reviews with the Engineer and manager.
  • Coordinated with departments and store administration to manage resources and keep monthly targets on track.

Structure Engineer(civil)

J.kumar Infraprojects Pvt. Ltd.
10.2015 - 05.2017
  • Coordinated casting of foundation, pier, pier-cap, parapet stitch, and segment work for Ahmedabad Metro Rail Project.
  • Supervised casting of pier, pier-cap, and pile-cap at 23 MTR height on the Ahmedabad Metro Rail Project.
  • Managed laying of 300mm RCC drainage pipe work and coordinated 700mm, 1100mm, and 1800mm canal sections.
  • Directed resource deployment, reinforcement checks, and shuttering rectification to keep site work aligned with plan.
  • Implemented safety and quality compliance while inspecting foundation, pier, pier-cap, cable profile, and HDPE pipe work.
  • Submitted RFIs and maintained ISO documentation for planned activities and process reporting.
  • Tracked progress and target achievement through coordination with planning, quality control, P&M, safety, and stores teams.

Junior Engineer, GRADE (S1)

L&T Infrastructure Limited.
01.2013 - 09.2015
  • Completed 14 span in one month while supporting launching, erection, and span-alignment activities on the metro project.
  • Handed over 6km parapet section to the track-laying team after completing parapet works and coordination.
  • Read drawings and prepared launching girder and parapet launcher work for erection, assembly, dismantling, and transport.
  • Performed segment lifting, gluing, duct grouting, post tensioning, stressing, and parapet-wall lifting across bridge spans.
  • Executed port bearing and elastomeric bearing fixing, grouting, span alignment, and shifting or sliding work.
  • Supported special-span construction for 73m, 41m, 53m, and 45m segments, including cast-in-situ bridge work.
  • Tracked daily progress, quality, and safe, economical execution while reporting against weekly targets and coordinating with departments and stores.

DET

L&T Construction Heavy Civil Infrastructures, India
11.2011 - 12.2012
  • Reviewed drawings and prepared BBS for pile cap and round pier execution, then tracked 23 MTR balance cantilever pile-cap work in Chennai Metro Rail.
  • Monitored daily site progress, quality, and safety, and reported weekly target status to the engineer and construction manager.
  • Coordinated with planning, quality control, P&M, safety, stores, and administration to keep execution aligned with plan.
  • Cast foundations, piers, pier caps, parapet stitch concrete, and segments while checking reinforcement and shuttering details.
  • Implemented safety and quality controls across site activities, targeting zero accidents and systematic compliance.
  • Inspected foundation, pier, pier cap, cable profile, and HDPE pipe with pre-stressing agency and internal QA/QC teams.
  • Submitted RFIs and maintained ISO documentation for 300mm, 700mm, 1100mm, and 1800mm RCC drainage pipe laying.

DET

Sanjay Singh Associates
06.2011 - 11.2011
  • Produced building drawings in AutoCAD, Revit, and 3ds Max for construction and coordination use.
  • Developed plumbing and electrical drawings, including plans and views, to support project documentation.
  • Reported drawing progress and updates to senior staff during project execution.

Education

Bachelor of Technology - Civil Engineering

Kalinga University
Raipur, Chhattisgarh
01-2017

Diploma - Civil Engineering

Haryana State Board of Technical Education
Haryana
01-2011

Intermediate - science

Haryana state education board
Haryana
01-2008

Matriculation - undefined

Haryana state education board
Haryana
01-2005

Skills

Launching girder assembly

Segment lifting

Span alignment

Gluing

Stressing

Span alignment

Port bearing fixing

Project planning

Quality compliance

Resource deployment

Client coordination

Method statement preparation

Lift plan development

Temporary works design

Construction risk assessment

Work breakdown structure

Delay analysis

Earned value management

Interface management

Certification

One Year Master Diploma in Interior Architecture & Civil Design Course

DECLARATION

I hereby declare that all the Information Furnished Above are true to the best of my Knowledge.

Timeline

Manager

Transrail Lighting Ltd
04.2024 - 08.2025

Deputy Manager

Dineshchandra R. Agrawal Infracon Pvt. Ltd.
03.2023 - 03.2024

ASST. MANAGER

GR Infra Projects Ltd.
12.2021 - 02.2023

SR. Engineer (Projects)

Apco Infratech Pvt. Ltd.
01.2020 - 11.2021

Construction Engineer Grade II

Simplex Infrastructures Limited.
11.2018 - 12.2019

Structure Engineer(civil)

J.kumar Infraprojects Pvt. Ltd.
10.2015 - 05.2017

Junior Engineer, GRADE (S1)

L&T Infrastructure Limited.
01.2013 - 09.2015

DET

L&T Construction Heavy Civil Infrastructures, India
11.2011 - 12.2012

DET

Sanjay Singh Associates
06.2011 - 11.2011

Matriculation - undefined

Haryana state education board

Intermediate - science

Haryana state education board

Diploma - Civil Engineering

Haryana State Board of Technical Education

Bachelor of Technology - Civil Engineering

Kalinga University
GOURAV SAINIConstruction