A competent professional with 16+ years of experience in the Execution, Inspection, supervision of Earthwork, Foundation, Structural Components of Highway Structures, Highway Bridges, Fly Over, Including Road/Railway Over bridges and Metro Projects in conformance with construction plans and specifications.
Overview
17
17
years of professional experience
1
1
Certification
1
1
Language
Work History
SENIOR MANAGER – Structure
TTK CONSTRUCTION
03.2023 - Current
Execution of pile Foundation and Open Foundations.
Execution pier cap, pier and pier cap casting.
Supervision of PSC I-Girder and RCC Girder casting.
Execution of precast girders erection and deck slab casting.
Construction of Major, Minor bridges, Vehicle under Pass (VUP), Light Vehicle under Pass (LVUP), Pedestrian under Pass (PUP) and Foot over Bridge (FOB) as per drawings.
Installing of Elastomeric, POT and Spherical Bearings.
Supervision of Miscellaneous work.
Conducting safety awareness program for workers.
MANAGER–Structure
IVLR CONSTRUCTION
08.2022 - 02.2023
Execution of Open Foundations and Isolated Foundation.
Construction of commercial building for casting yard of pre cast drain by using steel truss.
Execution of pier, pier cap various height.
Assist in developing and maintain project cost plans.
Supervision of PSCI-Girder and RCC Girder casting.
Execution of pre casting of I- Girders and erection and deck slab casting.
Installing of Elastomeric Bearings.
MANAGER–Structure
SPL Infrastructure Projects Limited
03.2018 - 07.2022
Execution of pile Foundation and Open Foundations.
Construction of 6-lane Widening and Reconstruction on the Entire stretch.
Supervision of PSC I-Girder and RCC Girder casting.
Execution of precast girder erection and decks lab casting.
Construction of Major, Minor bridges, Vehicle under Pass (VUP), Light Vehicle under Pass(LVUP), Pedestrian under Pass (PUP) and Foot over Bridge (FOB) as per drawings.
Installing of Elastomeric, POT and spherical Bearings.
Construction of foot over bridge (FOB) casting of foundation and erection of steel structures on the vertical steel columns.
Execution of foundation using template for vertical steel column fixing.
Conducting safety awareness program for workers.
SITE ENGINEER
KOLIN CONSTRUCTION
06.2017 - 03.2018
Following pre checklist and documentation for before starting the works.
Execution of Excavation and back filling for pipe line laying activities.
Monitoring the infrastructure activities.
Construction of steel structures as per drawings.
Inspection of Drinking and Sewerage pipe line lying as per the drawings.
Inspection of field test after back filling and compaction as per drawings.
Preparing monthly bills of Vendor sand Clients.
Execution of Embankment, Earth work excavation and conducting daily field.
ENGINEER
LARSON AND TOUBRO (L&T)
12.2016 - 05.2017
Planning and Execution of works as per design & drawing.
Execution of station main buildings Floor for the Railway station buildings.
Construction of platform of Railway station and internal road works.
Preparation of daily, weekly, monthly, reports on work progress (key performance indicator) & evaluating as per the planned schedules.
Maintaining quality standards for all structural works.
Supervision of the working labor to ensure strict conformance to methods, quality and safety.
Execute steel as per approved structural design.
Study of there latest documents such as drawings, Electrical drawings, plans etc.
Checking the quality of RCC works such as foundations, columns, beams, walls and slabs etc.
CIVIL EXPERT
VOYANTS SOLUTION PVT LMD
09.2015 - 12.2016
Planning and Execution of works as per design & drawing.
Execution of station main buildings Floor for the Railway station buildings.
Construction of platform of Railway station and internal road works.
Preparation of daily, weekly, monthly, reports on work progress (key performance indicator) & evaluating as per the planned schedules.
Maintaining quality standards for all structural works.
Preparation of bar bending schedule, B.O.Q’s ,sub contractor bills and etc.
Supervision of the working labour to ensure strict conformance to methods, quality and safety.
Execute steel as per approved structural design.
Study of the related documents such as drawings, Electrical drawings, plans etc.
Checking the quality of RCC works such as foundations, columns, beams, walls and slabs etc.
Assistant Engineer
IVRCL LIMITED
09.2008 - 08.2015
Preparing the micro schedule for project activities.
Execute steel structures as per approved structural design.
Study of the related documents such as drawings, Electrical drawings, plans etc.
Checking the quality of RCC works such as foundations, columns, beams, wall sand slabs etc.
Monitoring to finishing works and painting works.
Coordinating the strength of grade as per the requirements.
Checking and verification of RA bills.
Estimation and Unit Rate Analysis for BOQ and non BOQ items with the reviling rates and basic price for critical materials like cement and steel.
Preparation & Checking of bar bending schedule (BBS), Maintaining the accurate quality of work.
Monitoring of Daily progress and labor Productivity report.
Co-ordination with client and consultants.
Established best practices for achieving quality goals.
To coordinate with Sales & Customer service Team to ensure any possible changes sought by the client.
Constructions of pre cast drain and top slabs.
Sort out the problems in critical ongoing projects and coordination of the projects.
Following the safety protocols.
Education
Bachelor of Civil Engineering - Construction Engineering
SATHYABAMA UNIVERSITY
Chennai, India
04.2001 -
High School Diploma -
Board of Technical Education
Madurai, India
04.2001 -
Skills
Auto Cadd
Micro Excel
Operations management
Resource allocation
Certification
Auto Cadd
Timeline
SENIOR MANAGER – Structure
TTK CONSTRUCTION
03.2023 - Current
MANAGER–Structure
IVLR CONSTRUCTION
08.2022 - 02.2023
MANAGER–Structure
SPL Infrastructure Projects Limited
03.2018 - 07.2022
SITE ENGINEER
KOLIN CONSTRUCTION
06.2017 - 03.2018
ENGINEER
LARSON AND TOUBRO (L&T)
12.2016 - 05.2017
CIVIL EXPERT
VOYANTS SOLUTION PVT LMD
09.2015 - 12.2016
Assistant Engineer
IVRCL LIMITED
09.2008 - 08.2015
Auto Cadd
08-2007
Bachelor of Civil Engineering - Construction Engineering