Project Name : Construction of 17.624 Elevated Metro Line including 8 Nos Elevated Metro Stations on EPC mode connecting existing Khapri Metro Station to New Station planned at Butibori (Cost 903 Cr)
- Develop and maintain detailed project schedules, ensuring alignment with project milestones and deadlines.
- Monitor progress of construction activities, identifying delays and implementing corrective actions.
- Coordinate with cross-functional teams, including design, engineering, and contractors, to ensure seamless project execution.
- Prepare and present progress reports, highlighting key metrics, risks, and mitigation strategies.
- Utilize project management tools (e.g., Primavera, MS Project) for effective planning and tracking.
- Manage resource allocation and optimize workflows to meet project objectives within budget and timeline.
Head of Planning & QS (RVNL Bilaspur Project)
HG Infra Engineering Ltd.
Bilaspur, Himachal Pradesh
06.2023 - 02.2025
Spearhead planning, budgeting, and scheduling for a 545 Crore INR railway viaduct project, ensuring timely delivery and cost efficiency.
Introduced slipform method for pier casting, saving 2% of project cost and 6 months of project time.
Manage sub-contractor billing, client invoicing, and contract administration, ensuring compliance with project milestones.
Project Highlight: Construction of a 3.85 km Railway Steel Structure Viaduct (including piles) as part of the Beri-Bilaspur-Bhanupalli railway line.
Principal Consultant – Contract Management
Masin Projects Pvt. Ltd.
Delhi
01.2023 - 06.2023
Conducted delay and quantum analysis for infrastructure projects (DFCC, Railways, Metro, Oil & Gas) using Primavera P6 and MS Project.
Prepared delay analysis reports using Time Impact Analysis, Window Analysis, and Time Slices.
Drafted and submitted contractual claims for deviations, variations, and site instructions, ensuring adherence to FIDIC and NEC standard.
Manager - Planning & Contracts
L&T – Transportation Infrastructure
Delhi
03.2019 - 03.2022
Developed detailed work plans and WBS in Primavera P6, monitoring weekly progress, variances, and S-curves.
Negotiated and finalized sub-contractor agreements, ensuring back-to-back contractual alignment.
Secured approvals for Change of Scope, Cost Variations, Extension of Time (EOT) and Covid-19 related claims.
Coordinated cross-functionally between planning, procurement, and contract management teams.
Identified & Optimized aggregate wastage from existing 8% to 4.5% overall aggregate wastage.
Project Highlight: Development of Phase-3A of IGI Airport, Delhi (8500 Crore INR), including a new runway, taxiways, and terminal buildings.
Deputy Manager (Planning & Contracts)
SMEC (India) Consulting Private Ltd.
Gurugram
04.2018 - 03.2019
Developed baseline project plans in MS Project, incorporating technical, financial, and social feasibility inputs.
Monitored critical path activities, published weekly progress reports, and implemented corrective actions.
Designed a Project Management Information System (PMIS) for efficient document storage and retrieval.
Deputy Manager, Planning & Contracts
Kalpataru Power Transmission Ltd.
Noida
02.2017 - 03.2018
Monitored project progress (civil and electrical) and ensured budgetary control.
Prepared EOT applications, delay analysis reports, and cost claims for client submissions.
Improved revenue by 50% through proactive supply chain and vendor management.
Project Highlights: Second track laying with electrification (85 km) – Umdanagar to Mahabubnagar (464 Crore INR).
Third track laying with electrification (25 km) – Budni to Itarsi (200 Crore INR).
Senior Engineer (Commercial & Contracts)
ITD Cementation India Ltd.
New Delhi
06.2013 - 12.2015
Achieved 100 Crore INR client certification for an elevated road project within 18 months.
Improved billing cycle from 30 to 15 days, increasing payment frequency by 66%.
Project Highlights: Construction of Six lane viaduct of 6.2KMs length between Mangolpuri Chowk to Mukharba Chowk, Delhi, supported over Prestressed Concrete Segments having both Spine and Wing Configuration (600 Crore INR).
Engineer (QS & Contracts)
Consulting Engineers Group
Jaipur
06.2012 - 06.2013
Prepared quantity estimates, rate analysis, and tender documents for World Bank-funded projects.
Graduate Engineer Trainee (QS & Contracts)
Soma Enterprises Pvt. Ltd.
Gurugram
08.2011 - 06.2012
Developed BOQs, cost estimates, and contract appreciation reports for pre-bid projects.