Dynamic Senior Executive with expertise in SAP EWM configuration at Asian Paints Ltd. Proven track record in technical troubleshooting and report development, enhancing operational efficiency. Skilled in data migration and warehouse automation, I excel in problem-solving and driving continuous improvement initiatives, ensuring optimal performance in complex environments.
Playing Chess and Cricket
Rohtak FG Warehouse Expansion, Asian Paints, 03/01/22, 07/31/22, Programmer Trainee, Existing warehouse was expanded with addition of ASRS and enhancement in the sortation logic and return putaway., Understand the telegram structure of the Daifuku PLC and SIPAC PLC and communicated with them using MFS telegrams., Equal distribution of sortation task into work centre., Controlled the flow of WT into subsystem depends on the space availability., Provided the Go-live support Kasna DC Warehouse Expansion, Asian Paints, 12/01/22, 08/31/23, Project Lead and Developer, Old DC was expanded with new conveyors from Production area to Storage Area (ASRS) and implemented the new ASRS. Efficiently decrease the throughput time for putaway, reduce the man power and increase the production. Successfully I implement the go-live with minimum downtime and got recognized from the business team., Solely designed and implemented SAP EWM, handling all aspects from blueprinting to deployment, user training and cut-over activities., Collaborated with vendor in finalizing the telegrams for System Logistic ASRS. OPC WM Implementation, Asian Paints, 11/01/22, 01/31/23, Project Lead and Developer, Implementation of Warehouse from MM managed to WM managed which provide feasibility to user to monitor stock bin wise and optimized putaway and picking logic., Independently led the end-to-end implementation of WM in OPC., Coordinated with business team in implementing WM managed warehouse., Worked in cut-over activities and stock upload., Provide user training to the business team. Mysuru FG EWM Expansion, Asian Paints, 12/01/23, 05/31/24, Project Lead and Developer, New upgradation from SAP EWM 9.4 to SAP EWM 9.5 and FG warehouse capacity increased with new Main ASRS and Mini ASRS along with existing 2 ASRS. Enhancement in putaway, picking, replenishment and internal logics provide efficiency in throughput time., Design and develop the blueprint for the implementation., Coordinated with ATS vendor to finalize the Telegram structure for the Conveyors., Coordinated with Vendor for the business requirement., Managed the complex layout structure using LOSC., Provide support in UAT and provide user trainings to the business team., Provide the Go-live support. Kasna PMG EWM Implementation, Asian Paints, 07/01/24, 12/31/24, Project Lead and Developer, Implementation of MM managed warehouse to EWM managed warehouse which provide more feasibility in managing inventory, easy and simple RF based operations., Solely designed and implemented full cycle implementation of EWM warehouse., Coordinated with business team for requirement gathering., Integration with SAP ERP system., Provide support in UAT and provide user trainings to the business team., Provide the Go-live support.
Hereby, I declare that the above mentioned details are true to the best of my knowledge.