Summary
Overview
Work History
Education
Skills
Certification
Languages
Major Projects Handled
Projects Done In Ug
Personal Information
Timeline
Generic
K. Manikandan

K. Manikandan

Rasipuram

Summary

I have Total 15 Yrs. Experience in Engineering & Construction of Building projects, Pilling, Highway & Monorail and underground metro, Marine, HVAC System, Fire Protection System and full operation. I would like to expand my domain to include more challenging jobs involving site management.

Thorough team contributor with strong organizational capabilities. Experienced in handling numerous projects at once while ensuring accuracy. Effective at prioritizing tasks and meeting deadlines.

Overview

16
16
years of professional experience
1
1
Certification

Work History

In charge of Plant and Machinery

10.2013 - Current
  • Project: CMRL Phase -2, RVNL Thirumayilai & RK salai station. Client: CMRL.
  • Foundation of De wall.
  • Equipment maintenance of all Heavy Equipment (BC40, Crane, DG...).
  • Inventory control.

Plant & Machinery Manager

Larson & Toubro Ltd.
04.2012 - Current
  • Spares Requirement analyzes and preparing Weekly, Monthly performance report, Plant Inventory Statement, Addition, deletion, surplus reports etc.
  • Inspect safety conditions and inform the contractor of construction safety violations and follow up action to be taken.
  • Monitoring and ensuring continuous availability of Plant & machinery availability at site.
  • Review, update, monitor and report on the Contractor’s work schedules, CPM-chart and Cash Flow Status.
  • Ensuring contractor compliance with the contract documents, Inspect all workmanship and material.
  • Preparation of the Monthly Progress Report.
  • Attend all meetings and prepare written minutes for distribution.
  • Recommending and implementation of all mechanical related Maintenance and operations of construction plant, marine equipment, and machineries.
  • Monitoring monthly performance report & presenting to site management.
  • Project coordination.
  • Developing, scheduling, and executing of periodical maintenance for all Plants and Machineries.

In charge of Plant and Machinery cum Project manager

11.2021 - 09.2023
  • Project: CMRL Phase -2, TU-02 Greenways Project. Client: CMRL.
  • Foundation of De wall.
  • Equipment maintenance of all Heavy Equipment (BC40, Crane, DG...).
  • Inventory control.

In charge of Plant and Machinery’s

11.2017 - 10.2021
  • Project: Sea Water Intake 800 X 2 Thermal Power Plant TANGEDCO Uppur. Client: TANGEDCO.
  • Foundation of Marine Pilling & Preparation of construction programmer and monitoring.
  • Equipment maintenance of all Heavy Equipment (Pilling Rig, Crane, Jack up barge, Material barge, Gantry etc...).
  • Checking of subcontractor’s bills as per contract provision Maintenance of day-to-day project dairy.
  • Marine Equipment arrange.
  • Leading the project.

In charge of Plant and Machinery’s

12.2016 - 10.2017
  • Project: STORAGE AND REGASFICATION TERMINAL AT ENNORE. Client: LNG-IOCL.
  • Foundation Work of Marine Pilling.
  • Maintenance of all Equipment (Jack up barge, Material barge, Crane, Batching plant etc.).
  • Load Test of Piling.
  • Inventory control.
  • Marine Equipment arrangement.
  • Documentation work.
  • Spare maintaining and reduced the Break down.
  • Vendor developing.

In charge of Plant and Machinery’s

12.2015 - 11.2016
  • Project: 1X525 Tuticorin Thermal Power Plan. Client: M/s. Megha Engineering & infrastructures Ltd.
  • Foundation Work. (Pilling & Soil investigation).
  • Maintenance of all Equipment.
  • Load Test of Piling.
  • Documentation work.
  • Spare maintaining and reduced the Break down.
  • Vendor developing.

In charge of Plant and Machinery’s

12.2014 - 11.2015
  • Project: chettinadu Barth Kamrajar port, Chennai. Client: M/s. Chettinadu.
  • Foundation Work. (De wall, Pilling).
  • Maintenance of all Equipment.
  • Ensuring contractor compliance with the contract documents, Inspect all workmanship and material.
  • Interpretation of all materials testing according to the provisions in the contract documents and standard specifications.

In charge of Plant and Machinery’s

05.2013 - 11.2014
  • Project: IREP, BPCL-Kochi Refinery. Client: BPCL.
  • Foundation Work. (Pilling & Soil investigation).
  • Maintenance of all Equipment.
  • Load Test of Piling.
  • Documentation work.
  • Spare maintaining and reduced the Break down.
  • Vendor developing.

In charge of Plant and Machinery’s

04.2012 - 05.2013
  • Project: Prestige Bella vista apartment. Client: Prestige Bella vista.
  • Foundation Work. (Pilling & Soil investigation).
  • Maintenance of all Equipment.
  • Load Test of Pilling.
  • Documentation work.
  • Spare maintaining and reduced the Break down.
  • Vendor developing.
  • Monitoring of contractor’s equipment and staff deployment.

Mechanical Engineer

Gammon India Ltd.
07.2009 - 04.2012

In charge of Plant and Machinery’s

06.2009 - 04.2012
  • Project: 3 x 500 MW Thermal power plant, Client: TNEB.
  • Key Roles: Shift In charge of Plant and Machinery’s, Maintenance the machinery’s, Fabrication and Eraction for the following structures.
  • TG Building.
  • TG Deck for unit II, unit I.
  • Boiler foundation with auxiliaries.
  • Foundation Work. (Pilling & Soil investigation).
  • Establishment and responsibility for project communications with client, sub-contractors.
  • Development and review project planning and programming.
  • Co-ordination and preparation of project close out reports.

Education

Bachelor of Engineering - Mechanical Engineering

Muthayammal Engineering College
Rasipuram, Tamil nadu
01.2009

Diploma - Mechanical Engineering

Muthayammal Engineering College
Rasipuram, Tamil nadu
01.2009

Higher Secondary Course - undefined

Govt Higher Secondary School
Rasipuram, Chennai
01.2004

Secondary School Leaving Certificate - undefined

Govt Higher Secondary School
Rasipuram, Chennai
01.2002

Skills

  • Windows 13
  • Professional
  • XP
  • MS DOS
  • Active listening
  • Self-confidence and positive approach
  • Ability to be dynamic in the environment I work
  • Technical Expertise
  • Leadership & Team Management
  • Safety Awareness
  • Adaptability
  • Troubleshooting
  • Training & Development
  • Collaboration
  • Task prioritization
  • Data entry
  • Remote office availability
  • Team building

Certification

  • One-week training in SCHWING STETTER INDIA for all type of concreting equipment’s (All Electrical, Hydraulic and Pneumatic circuits and systems)
  • One-week training in WILLIAM HARE (INDIA) PRIVATED LIMITED for General Constructions in steel-code of practice Third Revision organized at Chennai.
  • Bauer Hydraulic Training program in Bauer India for all type troubleshoot of the Piling Rig (All Electrical, Hydraulic and Pneumatic circuit).
  • First Level leadership program.

Languages

English
Tamil
Hindi

Major Projects Handled

  • 3 x 500 MW Thermal power plant, TNEB, Chennai, Tamilnadu, Shift In charge of Plant and Machinery’s, Maintenance the machinery’s, Fabrication and Erection for the following structures, 06/01/09, 04/30/12
  • Prestige Bella vista apartment, Prestige Bella vista, Chennai, Tamilnadu, In charge of Plant and Machinery’s, 04/01/12, 05/31/13
  • IREP, BPCL-Kochi Refinery, BPCL, Kachin, Kerala, In charge of Plant and Machinery’s, 05/01/13, 11/30/14
  • Chettinadu Barth Kamrajar port, M/s. Chettinadu, Chennai, Tamilnadu, In charge of Plant and Machinery’s, 12/01/14, 11/30/15
  • 1X525 Tuticorin Thermal Power Plan, M/s. Megha Engineering & infrastructures Ltd, Tuticorin, Tamilnadu, In charge of Plant and Machinery’s, 12/01/15, 11/30/16
  • Storage and Regasification Terminal at Ennore, LNG-IOCL, Chennai, Tamilnadu, In charge of Plant and Machinery’s, 12/01/16, 10/31/17
  • Sea Water Intake 800 X 2 Thermal Power Plant TANGEDCO Uppur, TANGEDCO, 11/01/17, 10/31/21
  • CMRL Phase -2, TU-02 Greenways Project, CMRL, In charge of Plant and Machinery cum Project manager, 11/01/21, 09/30/23
  • CMRL Phase -2, RVNL Thirumayilai & RK salai station, CMRL, 10/01/13, Present

Projects Done In Ug

Study of Material Handling Equipment and Maintenance Aspect

Personal Information

  • Age: 36
  • Passport Number: T3808095
  • Date of Birth: 03/11/86
  • Gender: Married
  • Nationality: Indian

Timeline

In charge of Plant and Machinery cum Project manager

11.2021 - 09.2023

In charge of Plant and Machinery’s

11.2017 - 10.2021

In charge of Plant and Machinery’s

12.2016 - 10.2017

In charge of Plant and Machinery’s

12.2015 - 11.2016

In charge of Plant and Machinery’s

12.2014 - 11.2015

In charge of Plant and Machinery

10.2013 - Current

In charge of Plant and Machinery’s

05.2013 - 11.2014

Plant & Machinery Manager

Larson & Toubro Ltd.
04.2012 - Current

In charge of Plant and Machinery’s

04.2012 - 05.2013

Mechanical Engineer

Gammon India Ltd.
07.2009 - 04.2012

In charge of Plant and Machinery’s

06.2009 - 04.2012

Diploma - Mechanical Engineering

Muthayammal Engineering College

Higher Secondary Course - undefined

Govt Higher Secondary School

Secondary School Leaving Certificate - undefined

Govt Higher Secondary School

Bachelor of Engineering - Mechanical Engineering

Muthayammal Engineering College
K. Manikandan