Summary
Overview
Work History
Education
Skills
Current Status
Technical And Soft Skills
Successes
Disclaimer
Roles And Responsibilities
Areas Of Interest
Timeline
Generic
KARTHIK NAMA

KARTHIK NAMA

Hubli

Summary

Seasoned management professional with over 16 years of experience in thermal and renewable energy power plants. Proven track record in leading project erection and maintenance teams, overseeing budget preparation, and enhancing vendor relations. Expertise in project coordination, IT strategies, and HR planning contributes to maximized company growth and personal development. Committed to driving operational efficiency while fostering innovative business processes.

Overview

16
16
years of professional experience

Work History

Plant In Charge

Alfa Infra Properties Pvt Ltd - Sun Pharma Laboratories Private Limited
Hubli
02.2016 - Current
  • 33KV Switch gear panels erection and its maintenance
  • 33KV transmission line inspection and attending line fault
  • SF6 Breakers and CRP maintenance
  • 630KW Hitachi inverters generation and its fault attending
  • SMB voltages and currents inspection and monitoring
  • BMC inspection and guiding site team for uninterrupted energy loss
  • 3KVA 6KVA UPS connections and its auxiliary load monitoring
  • DC power bank monitoring & maintenance
  • SCADA Monitoring and its communication issues
  • Preparing daily DGR and its supporting documentary works
  • 1.5MVA transformers lifting, shifting and erection activity
  • Switch yards maintenance
  • Fire hydrant system maintenance
  • Preparing safety permits and issuing line permits and LC
  • Shutdown maintenance works
  • Trackers control unit's maintenance and its parameters counter verification
  • Trackers mechanical breakdowns and its drive line maintenance
  • Fire Alarm protection system healthy inspection
  • Detailed studying of SLD and giving support to engineering department

Senior Project Engineer

DAELIM (EPC) Malaysia
05.2015 - 12.2015
  • Company Overview: KNS Engineering Sdn Bhd, Malaysia - 1
  • 1000 MW (SUPER CRITICAL BOILER) TENAGA NASIONAL -WESTERN ENERGY BERHAD
  • MANJUNG-5 FAST TRACK PROJECT-COAL FIRED POWER PLANT; Malaysia
  • Steel structure Erection (4,000Ton)
  • Engineering Drawing observation
  • Modification in Fabricated Steel Material
  • Lifting plans (Crawler-crane, Mobile Crane, Lorry Crane Etc)
  • Material & stock Request (Steel structure)
  • Store material Inspection (consumable)
  • Documentation work (Daily Progress Reports, Queries like fabrication Errors, Technical summary, Document-Transmit)
  • Commercial Invoice activity
  • KNS Engineering Sdn Bhd, Malaysia - 1
  • 1000 MW (SUPER CRITICAL BOILER) TENAGA NASIONAL -WESTERN ENERGY BERHAD
  • MANJUNG-5 FAST TRACK PROJECT-COAL FIRED POWER PLANT; Malaysia

Mechanical Maintenance/Planning Engineer

Power Mech Projects Ltd.
Nellore
04.2013 - 04.2015
  • Looking over pressure parts, AHP maintenance, studying of specified drawings & work allotment

Mechanical Maintenance Engineer

Nava Bharat Energy India Limited
Palwancha
02.2009 - 03.2013
  • Company Overview: Formally known as Nava Bharat Ventures Limited, having capacity of 1
  • 150MW;
  • 52MW;
  • 35MW.
  • Monitoring daily activities like Preventive Maintenance and Corrective Maintenance, Predictive maintenance for rotary reciprocating equipment's such as single and multistage centrifugal pumps, BFP'S, CEP etc
  • Liaise with the Maintenance Coordinator to execute and close all work orders as per schedule
  • Update all maintenance work done on the SAP database and prepare weekly, monthly and quarterly status and MIS reports
  • Monitor inventories of spares and consumables using SAP Materials Management and Plant maintenance modules to ensure availability of spares and consumables for meeting all mechanical related maintenance requirements
  • Planning for long term and short term maintenance as per O&M schedules of rotary & static equipment's
  • Receiving work permits, ensuring proper isolation of the system taken to maintenance, explaining the safety hazards related job for workmen team and to make job execute with good quality of work
  • Observation in equipment parameters sound analysis & deviations at flow gauges
  • Work at on-site & internal equipment areas
  • Shop floor planning and allotment of workers and welders
  • Ensuring smooth running of boiler feed pumps and its booster pumps
  • Ensuring smooth running of main cooling system
  • Maintenance of oil Coolers and Filters, Centrifuge Pumps, Steam jet Air Ejectors, Surface Condensers, CEP Pumps, Forced draft Cooling Towers and its auxiliaries
  • Knowledge about shut down activity
  • Reporting to In Charge on daily and monthly basis, coordinating with Maintenance Coordinator on daily based activities
  • Formally known as Nava Bharat Ventures Limited, having capacity of 1
  • 150MW; 1
  • 52MW; 2
  • 35MW

Education

Bachelor of Technology - Mechanical Engineering

Jawaharlal Nehru Technological University
Hyderabad
11.2008

Intermediate -

Board of Intermediate
03.2004

10TH -

Secondary School Education
03.2002

Skills

  • Equipment maintenance
  • Preventive maintenance
  • Technical documentation
  • Safety compliance
  • Team leadership
  • SCADA monitoring
  • Project management
  • SAP(stock inventory tool )
  • Microsoft Office
  • Microsoft Excel

Current Status

Alfa Infra Properties Pvt Ltd - Sun Pharma Laboratories Private Limited, plant in charge in solar power plant, 10MW-Renewable Energy

Technical And Soft Skills

  • Auto CAD
  • SAP (Stock Inventory-tool)
  • Microsoft Office
  • Microsoft Excel sheets for data

Successes

  • Learned organizational team work and communication skills in a high-pressure environment
  • One of the members in the fabrication of 'SBIT MINI CAR' as our Educational project.

Disclaimer

I hereby declare that the above furnished details are true to the best of my knowledge.

Roles And Responsibilities

  • 33KV Switch gear panels erection and its maintenance
  • 33KV transmission line inspection and attending line fault
  • SF6 Breakers and CRP maintenance
  • 630KW Hitachi inverters generation and its fault attending
  • SMB voltages and currents inspection and monitoring
  • BMC inspection and guiding site team for uninterrupted energy loss
  • 3KVA 6KVA UPS connections and its auxiliary load monitoring
  • DC power bank monitoring & maintenance
  • SCADA Monitoring and its communication issues
  • Preparing daily DGR and its supporting documentary works
  • 1.5MVA transformers lifting, shifting and erection activity
  • Switch yards maintenance
  • Fire hydrant system maintenance
  • Preparing safety permits and issuing line permits and LC
  • Shutdown maintenance works
  • Trackers control unit's maintenance and its parameters counter verification
  • Trackers mechanical breakdowns and its drive line maintenance
  • Fire Alarm protection system healthy inspection
  • Detailed studying of SLD and giving support to engineering department.

Areas Of Interest

  • Power Plant Engineering
  • Automobile Engineering

Timeline

Plant In Charge

Alfa Infra Properties Pvt Ltd - Sun Pharma Laboratories Private Limited
02.2016 - Current

Senior Project Engineer

DAELIM (EPC) Malaysia
05.2015 - 12.2015

Mechanical Maintenance/Planning Engineer

Power Mech Projects Ltd.
04.2013 - 04.2015

Mechanical Maintenance Engineer

Nava Bharat Energy India Limited
02.2009 - 03.2013

Bachelor of Technology - Mechanical Engineering

Jawaharlal Nehru Technological University

Intermediate -

Board of Intermediate

10TH -

Secondary School Education
KARTHIK NAMA