Summary
Overview
Work History
Education
Skills
Certification
Languages
Websites
Disclaimer
Timeline
Generic

Shubham Rai

Shaktinagar

Summary

Civil engineer graduate with experience in the construction industry. Involved in the execution and management of complex development projects. I am thoroughly conversant with all Aspects of Construction, construction management, monitoring the progress of work, investigation and approval of construction materials, highways & Road’s project.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Assistant Highway Engineer (AHE)

Lea Associate South Asia Pvt Ltd.
Kangado
06.2023 - 05.2025
  • Project Management Consultancy Services for the project of Rehabilitation and Upgradation to Four lane configuration & Strengthening of Mo to Sihuni from Km. 42.000 to Km. 51.000 and Sihuni to Rajol from Km. 51.000 to Km. 72.000 (Design Length 8.330KM) of NH-20 (New NH-154) of Pathankot –Mandi section in the state of Himachal Pradesh on Hybrid Annuity Mode (HAM)
  • As a Assistant Highway Engineer, Checking of alignment, execution of earth work, sub grade, WMM, DBM and Bituminous works. I am also responsible for checking of field density testing of embankment, sub grade, sub base, Dry lean concrete and PQC laying at site, maintaining of strip chart with RFI, testing of highway materials, supervising laying of pavement MoRT&H and IRC specifications on road construction.
  • Of NH-87 from km 0.000 (km.190.000 of NH24)tokm2.791 (design chainage43.446) [Package –I] in the State of Uttar Pradesh and (ii) 4-Laning of Rampur –Kathgodam Section of NH-87 (new NH-9, 109) from Km. 42.791 (Design chainage 33.846) to Km. Package –III) in the state of Uttrakhand under NHDPI-III on Hybrid Annuity Mode; Length: 93.23 Km; 4 Lane; Rigid Pavement;Project Cost: INR 1395 Crores; Client; National Highways Authority of India

Field Highway Engineer

Lea Associate South Asia Pvt Ltd.
Aurangabad
04.2022 - 05.2023
  • 440035 Six laning of Varanasi Aurangabad Section of NH-2 in the state of Bihar (From KM 398+400 to KM 978+00)
  • As a Field Highway Engineer, played a Field Engineer Highway role. Completed the construction of the main carriageway widening, while verifying the various stages of construction through RFI Attachment.
  • Calculation area measurements of the TCS for BOQ For Sub Contractor for Billing.

Assistant Highway Engineer

Lea Associate South Asia Pvt Ltd.
Oraji
01.2020 - 03.2022
  • Project Management consultancy Development of Bundelkhand Expressway (Package-V) from Saalabaad (Dist. Jalaun) to Bahariya (Dist. Auraiya) (Km200+000tokm250+000) in the State of Uttar Pradesh on EPC Basis length 50 km Flexible Pavement Project Cost 1415 cr.
  • As an Assistant Highway Engineer, reviewing of plan & Profile as per submitted by designer, checking of alignment to maintain the sufficient clearance for construction, planning of execution construction of earthwork, Sub grade with lime stabilization, granular sub base, day lighted GSB,Wet mix macadam, DBM, BC at site, testing of highway material as per provided by lab, wire fencing at end of row, checking reinforcement of lined drain as per MoRT&H and IRC specifications on road construction.
  • Completed Under Supervision, applies technical professional proficiency to the discussing of problems, the coordination of project activates, and preparation of preliminary plan and documents like DPR MPR and QPR of the projects, estimating of quantity of highway with help Road estimator software, working with concession agreement.

Independent Engineer

Lea Associate South Asia Pvt. Ltd.
Rudrapur
04.2019 - 12.2019
  • Independent Engineer services for (i) 4-Laning of Rampur- Kathgodam section

Site Highway Engineer

RCC Developers Ltd.
Oraji
06.2017 - 03.2019
  • Construction of four laneroad in District Jalaun under Rajya Yojna (Samanya) From Jalaun ToOrai Chainage 352.000 of B.P road SH-21 up to chainage 370.450 terminating at chainage 224.400 of Jhansi Bhognipur Kanpur road(S.H 27) Via Jalaun in the State of Uttar Pradesh by Pass Road Length 18.400 Rigid Pavement; Project Cost: INR 270 Crores Client Provincial Division PWD Orai
  • As a Site Highway Engineer, day to day planning of construction, preparation of job mix formula, quality assurance of material, preparation of monthly bills with the client and the consultant. The work includes management/execution of road construction.
  • Supervised day to day quality control and quality measurements of workcarried out and recorded the measurements in measurement book for issue of monthly payment certificates.

Education

B-Tech - Civil engineering

Dr. A.P.J. Abdul Kalam Technical University
Lucknow, U.P
06.2020

Intermediate -

Shree VIC Munderra Rasra U P Board
Rasra Ballia
04.2013

High School -

Janta Inter College
Rasra, Ballia
04.2011

Skills

  • Computer skills and good knowledge in MSOffice(Word, Excel, Power point)
  • Road Estimator & Auto Cadd

Certification

  • Stadd Pro 2-D Organize College For 1 monthTraining
  • AHDCA plus AIESCI Intuition

Languages

English, Hindi, Bhojpuri

Disclaimer

I hereby declare that All statements made in this application are true, complete and correct Original document will be produced on demand If you chance me for the said post, I am assured you to of my best services at all time

Timeline

Assistant Highway Engineer (AHE)

Lea Associate South Asia Pvt Ltd.
06.2023 - 05.2025

Field Highway Engineer

Lea Associate South Asia Pvt Ltd.
04.2022 - 05.2023

Assistant Highway Engineer

Lea Associate South Asia Pvt Ltd.
01.2020 - 03.2022

Independent Engineer

Lea Associate South Asia Pvt. Ltd.
04.2019 - 12.2019

Site Highway Engineer

RCC Developers Ltd.
06.2017 - 03.2019

B-Tech - Civil engineering

Dr. A.P.J. Abdul Kalam Technical University

Intermediate -

Shree VIC Munderra Rasra U P Board

High School -

Janta Inter College
Shubham Rai