Summary
Overview
Work History
Education
Skills
Interests
COMPANY PROFILE:
STERNGHTS:
Disclaimer
Timeline
Generic

Vivek Kumar Singh

Sasaram

Summary

To step into a professional environment of growth and excellence and orient myself in order to achieve a successful position which helps me enhance my future and provide job satisfaction and self-development options as well as helps me to meet the organizational goal.

Overview

2
2
Languages
4
4
years of professional experience

Work History

PPC Engineer (Production Planning Control)

Pixon Green Energy Pvt Ltd
06.2025 - Current
  • Manufactured solar modules in a 2.3 GW capacity plant.
  • Designed and implemented renewable energy systems to enhance operational efficiency.
  • Collaborated with cross-functional teams to streamline project workflows and improve communication.
  • Conducted feasibility studies for solar and wind energy projects, ensuring optimal resource utilization.

PPC Engineer (Production Planning Control)

GOLDI SUN PRIVATE LIMITED
06.2024 - 06.2025
  • Planning of raw material, consumable, indirect material, tools required for production.
  • Coordinated production planning, scheduling, and sequencing for line balancing, prepared purchase orders, and communicated material requirements with store and production teams.
  • Preparation PO (production order) created, released, wo rule, barcode creation, material type, Bom, various report execution, Teko S month ended closed.
  • Daily plan vs production achievement completed and sheet updated.
  • New product development, management support, planning, meeting, communication, feedback, product data sheet, result, Testing, dispatch S packing.
  • Coordinated with the store and purchase team on material requirements.
  • Material reservation making and material reconciliation, scrap, wastage material handover to store team physical S system.
  • Reports and records management of planning (daily, weekly, monthly, Yearly)
  • Oversaw production control activities to ensure smooth operations. to reduce outages and incidents, Manage production planning and scheduling for on-time delivery.
  • Company management and plan communication of manufacturing module in SAP, ERP S MES.
  • Daily basis production data and material consumption, packing consumption entry in sap, Erp and closing PO.
  • SAP in MTO S MTS according to production order prepared.
  • Maintained raw material and safety stock levels aligned with production requirements.
  • Coordinated material inventory control to optimize stock levels.
  • Ensured maintenance of 5S, 3R standards, and FIFO/LIFO inventory systems.
  • Company is preferred Manufacturer Solar Module, Solar cell, JB, a solar module making company of 14 GW Capacity plant.

Production Material Controller (KITTING)

PACIFIC CYBER TECHNOLOGY PVT. LTD.
02.2022 - 05.2024
  • Proven work experience as a Kitting executive S Expertise in warehouse and PMC management procedures and best practices.
  • PR (Purchase Requestion) material and forecast preparation according to plan management.
  • M.O(manufacturing order) making and released daily bases in SAP/ERP after month ended closed.
  • Production planning management and forecast rolling planning for monthly and yearly preparation.
  • Knowledge of electronics Component S MSL/MSD material Handling.
  • According to production plan daily bases staging wise Kitt received and first priority wise complete loading and unloading process.
  • Conducted training on SMT-KITT process and facilitated coordination for breakdown and preventive maintenance.
  • K3 software working in ERP (Enterprises Resource planning) and transfer material.
  • Submit daily receiving S Issuing report in SAP (System Application Protocol).
  • Executed daily kitting functions following standard operating procedures.
  • Maintaining the proper method of stock issue (FIFO, LIFO, FEFO).
  • A-class component reconciliation report (proper consumption with receiving and issuance).
  • Model wise daily bases MRN (Material Receipt Note) completed and Material return to warehouse physical and systematic process.
  • Conducted monthly physical inventory to ensure accurate stock levels.
  • Achieved quality targets in alignment with customer demand, implementing countermeasures for process and quality issues.
  • Maintaining the discipline and general rules and regulations within the department.
  • Inventory of materials as per schedule plan.
  • Maintained accurate records of Class A and B material usage.
  • Managed inventory and distribution of materials to ensure efficient workflow.
  • Closed work orders according to established production schedules.
  • Work order wise loss booking in K3.
  • PCBA, PCB S Virtual material Scrap process (OSSD).
  • Monitored SMT Consumable material as well as Maintaining Record of Consumable items.
  • (3Rand 5S) Maintain.
  • Company is preferred Manufacturer Mobile PCB, TV PCB, Inverter PCB, Earphone, Adaptor PCB S Setup Box PCB.

Education

Veer Kunwar Singh University
ARA, BIHAR

B.Sc - Chemistry Honors

Diploma - Computer Science

MBA - undefined

Asian University
Manipur

Skills

Smart working

Problem Solving

Discipline S Positive

Communication Skills

Teamwork

Hard work and dedication

Good knowledge of SAP (S4 HANA), MES, ERP

Ability to lead a team, build relationship and set up Trust

MS Excel

MS Power point

MSOffice World

MES

K3ERP

SAP

Quality control

Product development

Work Planning and Prioritization

Interests

Book Reader, Cricket, Travelling

COMPANY PROFILE:

Company is preferred Manufacturer Electronics Manufacturing Services (EMS), Mobile PCB, Camera PCB, Solar Module, Solar cell, Semiconductor assembly, TV PCB, Inverter PCB, Earphone, Display motherboard, Adaptor PCB S Setup Box PCB.

STERNGHTS:

  • Quick learner.
  • Dedicated toward work.
  • Ability to convince people.
  • A person with a Never-Say-Die Attitude.
  • Calms in crisis.

Disclaimer

I hereby declare that the above-mentioned information is true to the best of my knowledge.

Timeline

PPC Engineer (Production Planning Control)

Pixon Green Energy Pvt Ltd
06.2025 - Current

PPC Engineer (Production Planning Control)

GOLDI SUN PRIVATE LIMITED
06.2024 - 06.2025

Production Material Controller (KITTING)

PACIFIC CYBER TECHNOLOGY PVT. LTD.
02.2022 - 05.2024

MBA - undefined

Asian University

Diploma - Computer Science

B.Sc - Chemistry Honors

Veer Kunwar Singh University
Vivek Kumar Singh