L&T LIMITED
10.2017 - Current
CURRENT PROJECT: DDUGJY/Power Sub-station, Hazaribagh, Jharkhand
LAST PROJECT: 220 kV D/C Multi Circuit Deoghar to Giridih, Jharkhand
RESPONSIBILITIES IN KPIs:
To co-ordinate between four state (17 stores).
Planning & Estimation & Preparing a requisition for monthly targets
Effective Cost management
Co-ordination with Head Office.
Costing for the labours & contractors and the site & getting relevant approvals from the Head Office
Management of labour, contractors & making the resources required available at the site.
Approving the costs at the sites & Negotiations
Verify the quantity & quality of the material by QE
Fellow-up for Process of GIN & MRN
Ensure that store-keeper should issue the material to site with authorized indent
Reconciliation of material the project manager
Maintain the record of receipt, issue and balance by store-keeper
Physical verification in line with receipt, issue and balance monthly
Prepare MIS
Manage the logistics requirement
Ensure that client’s dimantle should return as per contract clause
JYOTI STRUCTURES LIMITED
06.2012 - 09.2017
PROJECT Handled 2: 400 kV DC MC New Chanditala to Gokarna S/S TL
PROJECT Handled 1: 400 kV DC Punatsangchhu, Bhutan to Sunkhosh, Bhutan TL
As store-in-charge that was my new opportunity to grow in the transmission industry by gaining my first exposure on project outside the Indian Territory.
RESPONSIBILITIES IN KPIs:
Planning & Estimation & Preparing a requisition for weekly targets
Procurement of raw-material
Effective Cost management
Co-ordination with Head Office.
Costing for the labours & contractors and the site & getting relevant approvals from the Head Office
Management of labour, contractors & making the resources required available at the site.
Approving the costs at the sites & Negotiations
Managing the site for HPCL meant to be more responsibility shouldered as compared to store management. This helped me learn:
RESPONSIBILITIES OTHER THAN KPIs:
The task of cost-cutting at the site
Staff management
HYTHROPOWER CORPORATION LIMITED
02.2011 - 06.2012
An opportunity to work as store-in-charge was a golden step forward for me, which I took up as a chance to learn and challenge my abilities to grow in the transmission industry.
PROJECT HANDLED II: 66 kV DC line divided in 6 parts 3 Palwal division & 3 Faridabad division.
PROJECT HANDLED I: 132 kV line Kundharkhi to Gonda
RESPONSIBILITIES IN KPIs:
Planning & Estimation & Preparing a requisition for weekly targets
Procurement of raw-material
Effective Cost management
Co-ordination with Head Office about the progress at the site.
Costing for the labours & contractors and the site & getting relevant approvals from the Head Office
Management of labour, contractors & making the resources required available at the site.
Approving the costs at the sites & Negotiations
Managing the site for HPCL meant to be more responsibility shouldered as compared to store management. This helped me learn:
RESPONSIBILITIES OTHER THAN KPIs:
The task of cost-cutting at the site
Staff management
Assistant Project Coordinator
A2Z Group
08.2010 - 01.2011
PROJECT: Meter shifting work
RESPONSIBILITIES IN KPIs:
Act as a link between the head-office & the project-site, which includes informing the instruction from Head-office to the PM; inform the progress of the site to the head-office.
Arrangement of requirements of the site
Checking for the raw-material procurement
Checking of inventory list
A2Z Group is an Engineering Procurement and Contracting Company
Storekeeper
A2Z Group
06.2009 - 08.2010
Project: 66/11KV with BPL connection - Kargil
RESPONSIBILITIES IN KPIs:
Maintain stock details
Maintaining the documentation of incoming & out-going material
Physical verification of the stock
Record the reversal of material
RESPONSIBILITIES OTHER THAN KPIs:
Raw-material procurement
Preparation of inventory list
Conducting the store-keeping activity for A2Z Group team meant to be on toes always, which have helped me in the following areas:
Excellent Being actively involved in the project to my best capabilities gave me a lot of learning on the intricacies of the project, also being chosen as Assistant Project Coordinator
Excellent conceptual & analytical understanding
Developed a thorough understanding of the task assigned to understand how to complete the request on a level higher than expected within time lines.
Bonding up with the workmen as a leader as well as team member to promote team strength
Excellent proficiency on technical as well as on technical areas on & off-site.
A2Z Group is an Engineering Procurement and Contracting Company
Education
M.A. POL.SCI (HONS.) -
PURVANCHAL UNIVERSITY
01.2012
B.A. POL.SCI (HONS.) - undefined
DELHI UNIVERSITY
01.2010
H.S.C - undefined
C.B.S.E BOARD
01.2007
S.S.C - undefined
C.B.S.E BOARD
01.2005
Skills
Team management & team-building
Timeline
L&T LIMITED
10.2017 - Current
JYOTI STRUCTURES LIMITED
06.2012 - 09.2017
HYTHROPOWER CORPORATION LIMITED
02.2011 - 06.2012
Assistant Project Coordinator
A2Z Group
08.2010 - 01.2011
Storekeeper
A2Z Group
06.2009 - 08.2010
B.A. POL.SCI (HONS.) - undefined
DELHI UNIVERSITY
H.S.C - undefined
C.B.S.E BOARD
S.S.C - undefined
C.B.S.E BOARD
M.A. POL.SCI (HONS.) -
PURVANCHAL UNIVERSITY
Disclaimer
Hereby acknowledging the above details, I am looking forward for a mutually benefiting professional relationship ahead. Date: ... Place: ... Signature
MY BEST WORK MOMENT
My best work moment with A2Z was my posting in Kargil, Leh, Ladakh in J & K for 6 months a storekeeper and Acting Project Coordinator. It was indeed a brilliant work experience working & getting work done from the laborers in -12 to - 17 degrees, keeping the team morale and getting the project successfully completed.