Summary
Overview
Work History
Education
Skills
Certification
Interests
CUSTOM SECTION
Lawn Tennis
Timeline
Generic
Khushi Lal

Khushi Lal

R.F Engineering Team Lead/Manager/Senior Engineer
Gurgaon

Summary

Dynamic and driven professional committed to delivering exceptional customer service and fostering teamwork. Highly motivated and adaptable, consistently demonstrating versatility in diverse environments while prioritizing knowledge sharing. A proactive approach to problem-solving ensures reliability and effectiveness in achieving goals. Passionate about contributing to team success and enhancing overall performance through collaboration and innovation.

Overview

16
16
years of professional experience
4
4
Certifications
4
4
Languages

Work History

Senior Engineer

Genius Consultants (Ericsson Global India Pvt LTD)
11.2024 - Current
  • DTAC-TRUE Merge Go Project.
  • Monitoring cluster wise KPI for LTE & NR (NSA)+SA Region.
  • PAC Cluster KPI Monitoring & Recomendation of new parameter list for improving SLA,s
  • RF Planning of New infill sites for Merge-Go Project.
  • PAC Cluster LTE & NR KPI Improvement by implementing new parameter .

RF Optimization/KPI Team Lead

Bayone Telecom
07.2023 - 10.2024
  • RF Team Lead for West (So-Cal, No-Cal) & East (UPNY & NE) Qualtek AT&T Market
  • RF Team Lead with having 15 Team members for Both East & West Region of ATT US Market.
  • Taking Care for NR/LTE new Sites MS5 Target KPI SLA,s for new IVC/IXC sites for Qualtek AT&T C-band/dod/NR850/LTE Carrier Addition/sectorization/PSAP.
  • Taking Care for GS Audit & Area Lite Discrepancy.
  • Pre/Post Launch Optimization of LTE & NR Rollout for Qualtek & AT&T
  • Recommending the RF Related parameter & Features for KPI improvement plan for LTE/NR Accessibility retainability integrality KPI,s.
  • MS 2 Acceptance from AT&T for new rollout sites.
  • Handling customer Queries and Escalation with resolution directly with client AT&T
  • Resolution of Technical Queries for various improvement plan for AT&T Wireless.
  • Submission of Qualtek sites to AT&T for signoff with KPI,s

Specialist Engineer

UST Telecom
01.2023 - 08.2023
  • Operator: Spark (New Zealand) (Modernization Huawei to Nokia) Swap with NR 850 NR3600 Rollout, February 2 0 2 3 — Till date
  • Monitoring the Pre Post Kpi,s after the swap from Huawei to Nokia system
  • Preparing action plan for any post swap degradation in Nokia for kpi,s like HOSR,DL&UL Dip, Volte Traffic, User throughput
  • NR850, NR3600 New site CIQ Verification & Post on air performance monitoring.
  • Power BI Update for Huawei to Nokia Kpi,s an mapping of Huawei to Nokia counters Ø Cluster Acceptance Report submission to operator Post On air KPI,s within agreed SLA given by Spark.
  • Providing Support to Ran Integration team for new site On air.
  • Report Fetching from Net-Act RSLTE001 (Per) RSLTE005 (HOSR) RSLTE(HO) RSLTE1031,,55,037,038,058, 59 Report NR5C6001,NR5C6005 Ø Parameter Audit for Nokia site post swap from huawei.

Senior Engineer

Cloud Ran Communication Pvt Ltd
07.2021 - 02.2023
  • NR/600 NR/700 5G Network Lead RTWP/Falcon/NNP Dashboard.
  • 5G NSA/SA New Site Maintaining Accessibility NSA/SA including Random access and retainability (MeGb/seGb) Kpi.
  • Ø NR Leg Setup & Configuration.
  • Ø TAC-Planning LAC-TAC-Mapping Discrepancy removing. Ø NR Dual Connectivity NR600/NR700/NR1900/NR2500.
  • Ø Kpi Management B1success rate ENDC Setup Success Rate ACH Success Rate (CBRA), Ø EN-DC Connection release by gNode and E-node b.
  • Ø Baseline Parameters Audit for NR-SA & NR-NSA
  • Ø Daily Health Check up & Performing SCFT for NR-SA or NR-NSA Sites
  • Ø C-Son Audit & Improvement of parameters available in C-son in T-Mobile Market
  • Ø Analyse & optimize the Single site verification log files and validate the RF planning parameters (Like RSRP, RSRQ, SNR), RF coverage and eNodeB Swap issues.
  • Ø Monitor & Analyse statistical KPI report as well as drive test data to improve system performance indicator of the network.
  • Ø Recommend physical (Tilts & orientations) optimization changes to improve the coverage and to cover the bad coverage patches. Analysing neighbour database relation and correlate to improve HO statistic.
  • Ø Consistency Checking and create / delete neighbors/ Checking and rectify PCI swap, coverage, and handover related issue, RRU faults.
  • Ø Drive test analysis and recommendation for further analysis. / KPI analysis and parameter recommendation for improvement/ KPI analysis and justification and recommendation for the same
  • Ø Cluster Optimization for NR700 in South-California/Los-Angeles Market
  • Ø Completed San-Francisco market 15k miles NR/5G Low Band benchmarking project.
  • Ø Benchmarking Milestone for 5G Low Band T-Mobile (N600,N700) AT&T(N750,N850) Verizon (N700,N800,N850)
  • Ø Coverage & Quality Comparison with Customer Query & Resolution provided on given time line.
  • Ø Details analysis of call drop reasons, low throughput and call block.
  • Ø Day to day comparison and support with drive test for script & drive logs.

Specialist

Magna Quess Corp pvt Ltd
03.2021 - 08.2021
  • Leading the performance Part for MS 2 Acceptance for Bharti Haryana Project in terms of payload and Agreed Kpi.
  • Responsible for Payload Tracking RRC, Coverage, CQI DCR,HOSR for L850 integrated sites.
  • LSM Strategy for FDD & TDD Layers for better capacity and End user Perception.
  • Making technical architecture of ANR for Ericsson (ANR, MLB, MRO,PCI Conflict detection & Self Optimization RACH Optimization, Cell Outage detection & Recovery.
  • Validation of the data Parse of CM, PM Dump on an weekly basis.
  • Providing Root cause for analysis for VOLTE/LTE/GSM Kpis, Volte Drop Volte access failure SRVCC to GSM SIP Failure RTP Timeout Poor DL,UL Throughput SINR Location and MOS Location.
  • LTE/Volte Kpi Development field integration first application test, feature requirement system and performance analysis.
  • Support Multivendor activities for several aspects of the project, quality control deliverable are consistent with contractual SLA,s and service deliverable.
  • Create various dashboards to track project milestone vendors delivery timeline (Installation to on air) site issue tracking RSSI Issue tracking.
  • Responsible for 3997 rollout sites SCFT of L850. tracking planning and execution of SCFT. Vendor management for SCFT & Cluster drive

Manager

ZTE TELECOM INDIA PVT LTD
02.2019 - 04.2021
  • Managed VIL Swap Project for AP & TS Circle. (G.U.L) Mode Swap project with GSM-Nokia to ZTE, Huawei-WCDMA to ZTE LTEFDD-Nokia to ZTE Swap & Modernization Project.
  • Nokia GSM To ZTE GSM Swap of VIL AP Circle of 4K sites in record 180 days Huawei UMTS To ZTE UMTS Swap for VIL AP Circle of 4K sites in 180 days.
  • Nokia FDD To ZTE FDD Swap for VIL AP Circle of 4.5 K Sites in 180 Days.
  • Collaboration with Vendor counterparts to ensure smooth integration & roll-out of Swap and FDD/TDD New services by tracking SCFT and Cluster AT reports.
  • SCFT drive test , Acceptance & Customer Sign Off Of 4K (GUL) Mode.
  • Cluster Drive of Total 296 logical cluster drive test , Acceptance and Signoff by Vil In Same duration.
  • Deployment and SCFT of logical 1050 FDD New Sites and 1750 TDD New sites for capacity and coverage enhancement of AP & TS Circle.
  • Pre Post Analysis of swap sites in terms of Voice traffic & Data Traffic.
  • Maintaining Positive Growth in terms of Voice and Data In Swap sites for VIL AP & TS Circle.
  • Proposed & SCFT of 500+ Massive Mimo Cells in high payload sectors.
  • Parameter, Tuning and optimization of Massive Mimo cells.
  • Layer-3 Analysis for GSM, WCDMA & LTE cells.
  • S1, X2 & IRAT Handover analysis for LTE Mobility, Intra-Frequency, Inter-Freq & IRAT HO for WCDMA.
  • Traffic Balancing of Dual Layer 4G networks (FDD & TDD) with proper Parameter settings. Priority Selection, Layer management strategy.
  • Responsible to manage of various LTE KPI,s of Accessibility, Retain ability and Mobility which includes (RRC Setup success rate, ERAB Setup Success rate, IRAT Handover success rate, DL & UL Throughput measurement, Drop calls,X2 handover Success Rate,S1 handover Success Rate etc.
  • SINR & Throughput Improvement of LTE Sites by Physical Optimization and Soft Optimization.
  • Proposal of TDD Sites where FDD Site is heavily loaded based on PRB Utilization. Responsible for VIL CG Circle for 489 L2100 SCFT And Cluster Optimization.
  • Responsible for SCFT, Optimization and acceptance of 489 Logical sites and 19 AT-cluster.
  • Responsible of Traffic Balancing of Dual Layer 4G networks (FDD Dual 1800-2100) with proper Parameter settings. Priority Selection, Layer management strategy.
  • Responsible for On air of New Technology as Per customer requirement.
  • Responsible of EMF Allocation Submission and acceptance of New Integrated site and approval from DOT to make site on air.
  • Responsible for VIL Punjab 323 TDD New Project in july-Oct-2020
  • Responsible for SCFT & EMF of TDD NEW of VIL Punjab Circle.
  • Responsible for SCFT, Optimization and acceptance of 323 sites to VIL Punjab Team.
  • S1, X2 & IRAT Handover analysis for LTE Mobility, Intra-Frequency, Inter-Freq & IRAT HO for WCDMA.
  • Responsible of Traffic Balancing of Dual Layer 4G networks (FDD & TDD) with proper Parameter settings. Priority Selection, Layer management strategy.
  • Responsible of Inter Vendor Handover over Huawei FDD To ZTE TDD and traffic balancing of TDD New sites.
  • Responsible for On air of New Technology as Per customer requirement.
  • Responsible of EMF Allocation Submission and acceptance of New Integrated site and approval from DOT to make site on air.

Network Performance & Optimization Engineer

New Technologies & Services Private Ltd
08.2017 - 02.2019
  • Working on Vodafone Project for Network Capacity Performance & Quality Optimization.
  • SON Self Optimizing Network Depth Analysis of All Module In CISCO SON.
  • Troubleshooting Worst Cells With The Help Of CISCO SON.
  • DUW 30-40 specific Specification RBS 5216 & 5212 Parameter Optimization. Good Knowledge of DUW RBS 5212 baseline features and parameters.
  • Cell Selection Reselection parameter like QRxLevMin, QQualMin, QRxLevMinOffset, QQualMinOffset, SIntraSearch, SNonIntraSearch, QHyst, PMax, Priority, and MeasurmentBandwidth Optimization.
  • Handover parameter like SMeasure, TriggerType, TriggerQuantity, ReportQuantity, TimeToTrigger, A3Offset, Hysteresis, ReportInterval, MaxReportCell & T304 Optimization.
  • Throughput Analysis & recommended solution for improve throughput.
  • BLER & CQI Analysis & Optimization for throughput.
  • IRAT Parameter Optimization like AdjCellMinRxLev, AdjCellErfcn, AdjCellTac, AdjCellPriority by using dump.
  • Create neighbor relation LTE to 3G (LNADJW) & LTE to 2G (LNADJL) by using xml.
  • Node B/ E Node B commissioning and troubleshooting knowledge. LNCEL, LNADJ, LNADJW, LNBTs Dump export in XML/CSV for parameters audit & plan run for Parameters Changes from SBTS Manager/CM Operation Manager, CM Editor.
  • Major KPI's of 3G analysis (CSSR, Retainability, PRACH, SHO, CQI, etc, alarms) Working On Capacity Site For LTE/WCDMA Network in Rajasthan.
  • RF Analysis For Worst Performance Sites and Through Recommendation Responsible for capacity planning and expansions for the sites.
  • Daily Basis Analysis of Worst Performing cells and action plan for Improvement. End To End Dealing With Vodafone for new Parameter & New Feature Trails.
  • Monitoring and troubleshooting throughput Related issues (HSDPA/HSUPA) and making action plan for Worst Performing Cells on weekly basis.
  • KPI Monitoring (RRC -Setup Success Rate, RAB Success Rate, Drop Call rate, IRAT Handover Success Rate)
  • Neighbor planning using statistics and WNCS.
  • Logs analyzing drop calls, blocked call, access failure, SHO, IRAT HO failure, using TEMS Investigation and GLADIATOR.
  • Performing routine parameter audits and rectifications as per agreed strategies with customer
  • Performing various traces like UETR and GPEH to do in depth event Analysis

Engineer

Ericsson india global Pvt ltd
04.2015 - 07.2017
  • Client: MTN South Africa (Gauteng Area).
  • Duties and responsibilities:
  • 1) Ericsson India Global Services Limited from (Customer Bharti Airtel Up West ). Take Care Of South Gauteng Area For WRAN Optimization. Event Monitoring With Troubleshooting Factors.
  • End To End Dealing With MTN Customer for new feature Rollout
  • Regular Parameter, One way neighbor, SC clash audits and raising CR for Rectification. Neighbor analysis through WNCS, ENIQ reports.
  • Interfrequency Handover Analysis for Different Vendors Like Huawei,ZTE,Nokia
  • Network problem investigation/analysis by performance statistics, counters analysis using OSS (AMOS) tool.
  • Inter-RNC and Inter-System (IRAT) Neighbor planning & tuning. Monitoring and troubleshooting throughput issues (HSDPA/HSUPA) Worst Cell Analysis.
  • KPI Monitoring (RRC -Setup Success Rate, RAB Success Rate, Drop Call rate, IRAT Handover Success Rate)
  • Neighbor planning using statistics and WNCS.
  • Doing in-depth analysis on the worst performing cells to find the root cause of the problem and to propose and make changes physically or parameter level for getting those cells to perform back normally.
  • Logs analyzing drop calls, blocked call, access failure, SHO, IRAT HO failure, using TEMS Investigation and GLADIATOR.
  • IRAT neighbor Tuning.
  • Optimization of golden routes for customer, troubleshooting capacity and coverage related issues.
  • Troubleshooting problems like missing neighbors, coverage holes, pilot pollution areas, areas of no dominance, code plan problems, overshooting sites through drive log analysis.
  • Performing routine parameter audits and rectifications as per agreed strategies with customer
  • Performing various traces like UETR and GPEH to do in depth event Analysis
  • 3. Network Engineer with (EGI) Ericsson Global Pvt Ltd for BHARTI Circles Project: Bharti-AIRTEL UP-WEST -
  • 1) Ericsson India Global Services Limited from (Customer Bharti Airtel Up West ).
  • Data FI Escalation (BCR-DCR) Improvement
  • PS & HS RAB Improvement Weekly Target PS drop (0.5),PS & HS Success Rate Of above 99%
  • Regular Parameter, One way neighbor, SC clash audits and raising CR for Rectification. Neighbor analysis through WNCS, ENIQ reports Round the clock KPI monitoring
  • Network problem investigation/analysis by performance statistics, counters analysis using OSS (AMOS) tool.
  • Neighbor planning using statistics and WNCS
  • Analyzing discrepancy in Intra frequency, external Vodafone & IDEA/WCDMA neighbor relations for both Intra and IRAT HOSR improvement.
  • Assisting Zonal engineers in worst offender analysis, KPI analysis Intra-frequency Neighbor planning using MapInfo.
  • Inter-RNC and Inter-System (IRAT) Neighbor planning & tuning. Drive test support through OSS & ENIQ reports.
  • KPI Monitoring (RRC -Setup Success Rate, RAB Success Rate, Drop Call rate, IRAT Handover Success Rate)
  • Analyzing Log files using TEMS 12..0.2, 13.0, 14.6
  • Monitoring and troubleshooting throughput issues (HSDPA/HSUPA)
  • WWCDMA Radio Optimization based on feedback from Drive-test team Neighbor list and database optimization, Pilot Pollution and coverage check.
  • WWCDMA Optimization done through physical changes like antenna re-orientation, down-tilting of antenna, cable swaps rectification.
  • For trouble shooting cell reselection issue by OSS.
  • 4. Network Engineer with (EGI) Ericsson Global Pvt LTD for BHARTI Delhi (PIM Testing)
  • 1) Ericsson India Global Services Limited from (Customer Bharti Airtel Delhi ).
  • Project: Bharti-AIRTEL Delhi Circle -
  • 1) Ericsson India Global Services Limited (Customer Bharti Airtel Delhi ).
  • Completed PIM Testing OSS Remotely For 1800 Nodes in Bharti delhi circle. Finding External,Internal,PIM for Bharti Delhi WCDMA Network .
  • Troubleshooting The Data Findings By OSS For External Interference.
  • Troubleshooting the Post And Pre Changes In Live Network
  • 5. Network Engineer with (EGI) Ericsson Global Pvt Ltd for BHARTI Circle.
  • 1) Ericsson India Global Services Limited from April-15 to NOV-2017(Customer Bharti Airtel RAJASTHAN ).
  • 3G/WCDMA New Site SCFT and Cluster acceptance test Exporting NRC Dump verification and analysis parameter
  • Regular Parameter, One way neighbor, SC clash audits and raising CR for Rectification. Neighbor analysis through WNCS, ENIQ reports Round the clock KPI monitoring ,Identification of worst offenders and real time trouble shooting
  • Network problem investigation/analysis by performance statistics, counters analysis using OSS (AMOS) tool.
  • Analyzing discrepancy in Intra frequency, external airtel & Idea GSM neighbor relations for both Intra and IRAT HOSR improvement.
  • Assisting Zonal engineers in worst offender analysis, KPI analysis Analysis KPI report for ring through ENIQ
  • Intra-frequency Neighbor planning using MapInfo.
  • Inter-RNC and Inter-System (IRAT) Neighbor planning & tuning. Drive test support through OSS & ENIQ reports.
  • Daily Basis Complaint Analysis
  • Regular Parameter, One way neighbor, SC clash audits and raising CR for Rectification. Neighbor analysis through WNCS, ENIQ reports Round the clock KPI monitoring For my NPI Zone In Rajasthan
  • Network problem investigation/analysis by performance statistics, counters analysis using OSS (AMOS) tool.
  • Analyzing discrepancy in Intra frequency, external Vodafone&IDEAWCDMA neighbor relations for both Intra and IRAT HOSR improvement.
  • Assisting Zonal engineers in worst offender analysis, KPI analysis Analysis KPI report for ring through ENIQ
  • Intra-frequency Neighbor planning using MapInfo.
  • Inter-RNC and Inter-System (IRAT) Neighbor planning & tuning. Drive test support through OSS & ENIQ reports.
  • KPI Monitoring (RRC -Setup Success Rate, RAB Success Rate, Drop Call rate, IRAT Handover Success Rate)
  • Analyzing Log files using TEMS 12..0.2, 13.0, 14.6
  • Monitoring and troubleshooting throughput issues (HSDPA/HSUPA)
  • WWCDMA Radio Optimization based on feedback from Drive-test team Neighbor list and database optimization, Pilot Pollution and coverage check.
  • WWCDMA Optimization done through physical changes like antenna re-orientation, down-tilting of antenna, cable swaps rectification.
  • For trouble shooting cell reselection issue by OSS.

Engineer

Linkquest Telecom
09.2013 - 02.2015
  • Third Party Consultant with Vodafone Delhi Circle.(Ericsson Equipment) On the payroll of Linkquest Telecom.
  • Linkquest Telecom from September-13 to Feb-2015.
  • End to End ROB To ROB Kpi Monitoring For 4 RNC In Vodafone Delhi Network . For trouble shooting cell reselection issue by OSS.
  • Team planning & Movement.
  • WWCDMA Optimization done through physical changes like antenna re-orientation, down-tilting of antenna, cable swaps rectification.
  • Swift resolution of customer complaints
  • Responsible for Optimization of sites by analyzing the drive test data and prepare action Plan for RF Related changes to be implemented. Optimize RF parameters to meet the KPIs as defined by Corporate.
  • Utilized project management methodologies to effectively plan, monitor, control and report on project of high visibility.
  • Performed schedule/budget estimating and forecasting, scope management, interlocking business needs with project processes.
  • Responsible for implementing project plan and preparing the progress plan report. Conduct regular status meeting by project team member.
  • Make project plans as well as changes as suitable to meet changing requirements. Manage project documentation and administration work.
  • Implement overall project plan that reflects the development methodology.
  • Coordinating with Customers of Different locations & projects to complete sites in given time line.
  • Maintaining Project Trackers & Different Reports
  • Optimizing the site allocating the proper Neighbors, Handover Criteria, Cell Selection / Reselection criterion etc.

RF Drive Test Engineer

Infotech Solutions
07.2009 - 08.2013
  • Infotech Solution for Ericsson Vodafone 3G Rollout Delhi Circle. (Ericsson Equipment) On the payroll of Infotech Solution duration June 2009 to August 2013.
  • SCFT OF New 3G Sites in Vodafone Delhi Circle .
  • Has completed Milestone 1 of 1800 sites -Milestone 2 for 2100 sites and Milestone 3 for 1450 sites in Vodafone Delhi Network.
  • KPIS SLA Target of Newly SCFT Sites.
  • Customer complaint resolution regarding Network Performance & Optimization Cluster Drive of Phase 1 Phase 2 & Phase 3 sites including customer handover AT Acceptance.
  • Successfully completed Cluster AT Of Vodafone network of 4000 sites with Vodafone New parameter features Implementation of Ericsson Throughput Improvement.
  • Swap Of Nokia 2G existing Sites with Ericsson Equipment and Maintaining KPI,s Till handover with customer

Education

A-Levels - Electronics & Communication

University of Rajasthan
Jaipur, RJ
01.2008

Skills

Multi Operator Swap: Nokia to ZTE (VIL AP), Huawei To Ericsson (Bharti ROTN), ZTE To Ericsson (Bharti Haryana, Punjab), Huawei to Nokia (Spark New Zealand) Swap Nokia to Ericsson (VIL Maharashtra)

undefined

Certification

ETCP Ericsson Certified RNO (2016)

Interests

Lawn Tennis, Cricket, Soft Music, reading

CUSTOM SECTION

RF Optimization Lead

Lawn Tennis

Delhi State Gold Medalist in 2002

National Level Bronze Medalist 2003

Timeline

Senior Engineer

Genius Consultants (Ericsson Global India Pvt LTD)
11.2024 - Current

RF Optimization/KPI Team Lead

Bayone Telecom
07.2023 - 10.2024

Specialist Engineer

UST Telecom
01.2023 - 08.2023

Senior Engineer

Cloud Ran Communication Pvt Ltd
07.2021 - 02.2023

Specialist

Magna Quess Corp pvt Ltd
03.2021 - 08.2021

Manager

ZTE TELECOM INDIA PVT LTD
02.2019 - 04.2021

Network Performance & Optimization Engineer

New Technologies & Services Private Ltd
08.2017 - 02.2019

Engineer

Ericsson india global Pvt ltd
04.2015 - 07.2017

Engineer

Linkquest Telecom
09.2013 - 02.2015

RF Drive Test Engineer

Infotech Solutions
07.2009 - 08.2013

A-Levels - Electronics & Communication

University of Rajasthan
Khushi LalR.F Engineering Team Lead/Manager/Senior Engineer