Summary
Overview
Work History
Education
Skills
Certification
Timeline
AccountManager
Kishori Dutt Sharma

Kishori Dutt Sharma

A Highly Dedicated And Experienced Mechanical Engineer With A Proven Track Record In Providing Quality Mechanical Component And System Support. Skilled At Formulating/implementing Designs, Testing & Producing Specifications, And Researching Product Applications. I Have Specialized In Electromechanical Systems’ Diagnostics. I Am Well-equipped To Provide Valuable Technical Expertise To Your Organization.
# Hatt, P.O. Bajaura Tehshil; Bhuntar, Distt. Kullu Himanchal Pradesh

Summary

I believe in working Efficiently, Professionally and practically to achieve the organizational goals .

  • Customer-oriented General Manager with 2 years of experience focused on increasing revenues and expanding margin. Adaptive and deadline-oriented consistently executes and completes multiple projects in high-stress environments. Meticulous leader and strategic planner with comprehensive managerial acumen, offering vision and motivational acumen.
  • Serviced-focused General Manager dedicated to delivering positive customer experiences to promote loyalty and repeat business. Orchestrates optimal resource utilization to handle expected operational needs. Sales leader with sound judgment, good planning abilities and interpersonal communication strengths.
  • Strong leader and problem-solver dedicated to streamlining operations to decrease costs and promote organizational efficiency. Uses independent decision-making skills and sound judgment to positively impact company success.
  • Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

30
30
years of professional experience
6
6
years of post-secondary education
4
4
Certifications
5
5
Languages

Work History

GENERAL MANAGER-PROJECTS

P&R INFRAPROJECTS LTD.
Chandigarh
01.2022 - Current
  • Presently I have been working with M/s P&R Infraproject Ltd., Chandigarh As a General Manager-Porjects looking (2000 MW Subansiri Hydro Electric Project under NHPC in Arunachal Pradesh) all HM works e.g.
  • DIVERSION TUNNEL GATES ( Total no. of gates 10, Size/Clear Opening 3.75Mx 10.253M, Weight of Gate 48.9 Tone, Hoist Capacity 125 Tone, Sill Elevation 102M, Deck Level Elevation 150M).
  • SPILLWAY RADIAL GATES ( Total no. of Gates 9, Size/Clear Opening 11.5Mx14M, Weight of Gate 499.1 Tone, Hoist Capacity 2x392 Tone, Sill Elevation 144.023M, Deck Level Elevation 210M)
  • SPILLWAY BULKHEAD GATES (Total no. of Gates 2, Size/Clear Opening 11.5Mx16M, Weight of Gate 308.3 Tone, Capacity of Gantry Crane 250 Tone, Sill Elevation 145M, Deck Level Elevation 210M).
  • INTAKE TRASH RACKS (Total no. of Trash Racks 240 (8 Sets), Size 3.0Mx 5.058M, Weight 1.9 Tone, Sill Elevation 157.25M, Deck Level Elevation210M).
  • INTAKE FIXED WHEEL GATES (Total no. of gates 8, Size/Clear Opening 7.3Mx 9.5M, Weight of Gate 94.2 Tone, Hoist Capacity 185 Tone, Sill Elevation 160M, Deck Level Elevation 210M).
  • INTAKE BULKHEAD GATES (Total no. of gates 2, Size/Clear Opening 7.3Mx 9.5M, Weight of Gate 88.4 Tone, Capacity of Gantry Crane 150 Tone, Sill Elevation 160M, Deck Level Elevation 210M).
  • Draft Tube Gates (Total no. of gates 24, Size/Clear Opening 5.77Mx 7.5M, 5.74x75.M, Weight of Gate 38.6 Tone, Hoist Capacity 60 Tone, Sill Elevation 81.7M, Deck Level Elevation 123.5M).
  • PRESSURE SHAFT STEEL LINER (Total no. of Lanes 8, Total Length 1594M, Total Weight 10781 Tone, Material ASTM A 537, Class-1, Total no. of Ferrules 767, Diameter 8M-9,5M, Thickness of Ferrules 28MM-50MM, Length of VPS (C-C) 57.75M).
  • Used critical thinking to break down problems, evaluate solutions and make decisions.
  • Proven ability to learn quickly and adapt to new situations.
  • Developed strong communication and organizational skills through working on group projects.
  • Demonstrated leadership skills in managing projects from concept to completion.
  • Exercised leadership capabilities by successfully motivating and inspiring others.
  • Excellent communication skills, both verbal and written.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Used strong analytical and problem-solving skills to develop effective solutions for challenging situations.

Sr. Project Manager

P&R INFRAPROJECTS LTD.
LEH LADAKH
09.2020 - 12.2021
  • As Sr. Project Manager Working on 9MW Hanu and 9MW Dah Small Hydro Electric Projects under JKSPDC, Jammu & Kashmir.
  • As Sr. Project Manager Working on Construction of 66KV Double Circuit Transmission Line from 9MW DAH SHEP to 9MW HANU SHEP Switchyard and from HANU Switchyard to 66/11KV Substation Khaltse (Leh) 64.5 KMS through EPC mode under JKSPDC, Jammu & Kashmir.
  • As a Project Manager, responsible to check and maintain Client and
  • Contractors working
  • Responsible to look after the position DPR, Stock and bank statements
  • Responsible for maintain proper site records
  • Responsible to follow the instructions from H.O and proper coordination, planning with Client, H.O and Contractors, labour etc
  • For better execution for site work.
  • Monitored project progress, identified risks and took corrective action as needed.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Partnered with project team members to identify and quickly address problems.
  • Communicated project plans and progress to key stakeholders and project contributors.

Project Incharge

03.2016 - 08.2020
  • As an Project Incharge worked at M/s Gunal Hydro Private Limited, Sheel SHEP(1.50MW) in Distt-Ktullu – HP and Himalya Hydel Energy Private Limited at Thuchaning SHEP(1.00MW) in Distt Kullu-HP as a Project Incharge from March, 2016 to Aug 2020.
  • Resolved problems, improved operations and provided exceptional service.
  • Identified issues, analyzed information and provided solutions to problems.
  • Demonstrated a high level of initiative and creativity while tackling difficult tasks.
  • Demonstrated strong organizational and time management skills while managing multiple projects.

Sr. Project Manager

M/s Om Metals
KULLU
11.2007 - 01.2015
  • Worked with M/s OM METALS+SPML (JV), Delhi, Having bolting unit in Parbati NHPC Stage-III, 520MW, Bihali, Distt. Kullu under N.H.P.C as Sr. Project Manager independently handling 96 crore job as per contract and exceed up to 100 crore.
  • Fabrication & Erection of Penstock dia 4.5Mtr work with 5000 MT (1000 Mtr Lg.) and 22 No of hydro mechanical gates e.g. Radial Gates stop log, SFT, TRT Gates etc. and 500 Mtr Lg. Aquatic life discharge pipe line or commissioning of all electrical panels.
  • Strengthened communication skills through regular interactions with others.
  • Worked effectively in fast-paced environments.
  • Identified issues, analyzed information and provided solutions to problems.
  • Demonstrated strong organizational and time management skills while managing multiple projects.

Project Manager

M/s Gini Global Delhi
CHAMBA
12.2006 - 06.2007
  • As an Project Manager worked at 5MW TRELA HYDRO POWER PROJECT, Chamba, Dist. Chamba. (H.P) (from 2006 to 2007) - Six Months under M/s Gini Global Delhi. Responsible for fabrication and erection of Penstock (800 Mtr. Lg 1.5 Mtr Dia and Thk 10mm to 28 mm) and other hydro mechanical equipment’s like that expansion joints, Butterfly Valves etc.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.

Project Manager

M/s Harisons Hydro Power
KULLU
07.2006 - 12.2006
  • As an Project Manager worked at 5MW BRAHAM GANGA HYDRO ELECTRIC PROJECT, Manikaran, Dist. Kulllu. (H.P) (from 2006 to 2006) - Six Months under M/s Harisons Hydro Power. Responsible for fabrication and erection of Penstock (600 Mtr. Lg. 1 mtr dia and 10 to 20 mm Thk.) and other hydro mechanical equipment’s like that expansion joints, Butterfly Valves etc.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.

Project Manager

M/s Chamoli Hydro
CHAMOLI, U.K
12.2005 - 06.2006
  • As an Project Manager worked at 5MW CHAMOLI HYDRO ELECTRIC PROJECT, Dewal, Dist. Chamoli. (U.K) (from 2005 to 2006) - Six Months under M/s Chamoli Hydro. Responsible for erection and fabrication of penstock and other hydro mechanical equipment’s like that expansion joints, Butterfly Valves etc.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.

Project Manager

12MW KHAULI HYDRO ELECTRIC PROJECT
KANGRA
01.2005 - 06.2005
  • As an Project Manager worked at 12MW KHAULI HYDRO ELECTRIC PROJECT, Salli, Dist. Kangra. (H.P) (from 2005 to 2005)- Six Months under H.P.S.E.B. Responsible for fabrication& Erection of Water Conductor System Penstock Gates other hydro mechanical equipment’s like that expansion joints, Butterfly Valves etc.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Negotiated and managed third-party contracts related to project deliverables.

Project Manager

M/S N.H.P.C.
SIKKIM
01.2004 - 01.2005
  • As an Project Manager worked at 520MW TESTA HYDRO ELECTRIC PROJECT, Sikkim, Dist. Sikkim. (From 2004 to 2005) under N.H.P.C. Responsible for erection and fabrication of Penstock.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Negotiated and managed third-party contracts related to project deliverables.

Project Manager

M/s K.K.K Hydro Power
Faridabad
01.2003 - 01.2004
  • As an Project Manager worked at 5 MW BARAGRAM HYDRO ELECTRIC PROJECT, Patlikul, Dist. Kullu. (H.P) (from 2003 to 2004) under M/s K.K.K Hydro Power, Faridabad (Delhi). Responsible for Fabrication& Erection of Water Conductor System related all civil works, Penstock Gates Etc.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.

Project Manager

135 MW LARGI HYDRO ELECTRIC PROJECT
KULLU
01.2002 - 01.2003
  • As an Project Manager worked at 135 MW LARGI HYDRO ELECTRIC PROJECT, Largi, Dist. Kullu. (H.P) (from 2002 to 2003) under H.P.S.B.Responsible for Fabrication & Erection of Pressure Shaft lining (120 Mtr Lg. Mtr Dia Thickness 18 MM to 28 MM) .
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Achieved project deadlines by coordinating with contractors to manage performance.

Project Manager

Power Develop Corporation J& K Government
JAMMU & KASHMIR
01.2001 - 01.2002
  • As an Project Manager Worked at 126 MW Uppersindh Hydro Power Project, Kashmir, Dist. Srinagar. (J&K) (From 2001 to 2002) under Power Develop Corporation J& K Government. Responsible for Fabrication & Erection of Penstock line (1.5 KM long, 2.5 Mtr Dia and thick.10 m to 50 mm).
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Managed projects from procurement to commission.
  • Developed and initiated projects, managed costs, and monitored performance.

Asst.Manager

M/s L&J Bhilwara Group
Malana
01.1998 - 01.2001
  • As an Asst.Manager Worked at 86 MW MALANA HYDRO ELECTRIC PROJECT, Malana, Dist. Kullu. (H.P) (from 1998 to 2001) under M/s L&J Bhilwara Group. Responsible for Fabrication and Erection of Penstock (925 Mtr Lg. 2.2 Mtr Dia and thickness 10 mm to 90 mm) Surge Shaft steel lining, H.R.T steel lining, with all civil works etc.
  • Paid attention to detail while completing assignments.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Developed strong organizational and communication skills through coursework and volunteer activities.

Sr. Engineer

M/s Trident Group (Spinning Mills)
PUNJAB
01.1996 - 01.1998
  • As an Sr.Engineer Worked at 10 MW THERMAL POWER PROJECT, Barnala, Dist. Sangrur. (P.B) (from 1996 to 1998) under M/s Trident Group (Spinning Mills). Responsible for T.G Building, M.S.Columns, Hoist structure, EOT structures, Floors, Coal Bunker & Boiler Structure and turbine structure and ESP etc.
  • Adhered to timelines to meet quality assurance targets.
  • Controlled project costs by approving expenditures.

Engineer

M/s P.S.E.B.
PUNJAB
01.1994 - 01.1996
  • As an Engineer Worked at 210 x 4MW THERMAL POWER PROJECT, Lehra Mohabbat, Dist Bathinda. (P.B) (from 1994 to 1996) under M/s P.S.E.B. Responsible for Fabrication and Erection of T.G Building, M.S.Columns, Hoist structure , Eot structures, Floors, Coal Bunker & Boiler Structure and turbine structure etc.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.

Engineer

M/s United Engineering Enterprises.
PUNJAB
01.1993 - 01.1994
  • As an Engineer Worked at 210 x 4MW THERMAL POWER PROJECT, Bathinda, and Dist Bathinda. (P.B) (from 1993 to 1994) under M/s United Engineering Enterprises. Responsible for Repair & maintenance of high pressure steam pipe line of boiler 1 inch to 6 inch
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.

Education

POST Diploma in Mechanical Engineering - Mechanical Engineering

N.I.E. Maharashtra Technical University
Maharashtra
06.2013 - 06.2015

High School Diploma -

Punjab School Education Board
PUNJAB
07.1988 - 06.1989

Matriculation - Science Education

Punjab School Education Board
PUNJAB
07.1989 - 06.1990

Diploma in Mechanical Engineering - Mechanical Engineering

N.I.E. Maharashtra Technical University
Maharashtra
07.2001 - 06.2003

Skills

    Project Management of the design process included proposal activity, analysis, documentation and troubleshooting

undefined

Certification

OFFICE OF THE EXECUTIVE ENGINEER

Timeline

GENERAL MANAGER-PROJECTS

P&R INFRAPROJECTS LTD.
01.2022 - Current

Sr. Project Manager

P&R INFRAPROJECTS LTD.
09.2020 - 12.2021

Project Incharge

03.2016 - 08.2020

OM METALS + SPML (JV)

08-2015

POST Diploma in Mechanical Engineering - Mechanical Engineering

N.I.E. Maharashtra Technical University
06.2013 - 06.2015

Sr. Project Manager

M/s Om Metals
11.2007 - 01.2015

MALANA POWER COMAPNY LIMITED

07-2007

Project Manager

M/s Gini Global Delhi
12.2006 - 06.2007

Project Manager

M/s Harisons Hydro Power
07.2006 - 12.2006

TRIVANI STRUCTURE LIMITED

07-2006

Project Manager

M/s Chamoli Hydro
12.2005 - 06.2006

Project Manager

12MW KHAULI HYDRO ELECTRIC PROJECT
01.2005 - 06.2005

OFFICE OF THE EXECUTIVE ENGINEER

02-2004

Project Manager

M/S N.H.P.C.
01.2004 - 01.2005

Project Manager

M/s K.K.K Hydro Power
01.2003 - 01.2004

Project Manager

135 MW LARGI HYDRO ELECTRIC PROJECT
01.2002 - 01.2003

Diploma in Mechanical Engineering - Mechanical Engineering

N.I.E. Maharashtra Technical University
07.2001 - 06.2003

Project Manager

Power Develop Corporation J& K Government
01.2001 - 01.2002

Asst.Manager

M/s L&J Bhilwara Group
01.1998 - 01.2001

Sr. Engineer

M/s Trident Group (Spinning Mills)
01.1996 - 01.1998

Engineer

M/s P.S.E.B.
01.1994 - 01.1996

Engineer

M/s United Engineering Enterprises.
01.1993 - 01.1994

Matriculation - Science Education

Punjab School Education Board
07.1989 - 06.1990

High School Diploma -

Punjab School Education Board
07.1988 - 06.1989
Kishori Dutt SharmaA Highly Dedicated And Experienced Mechanical Engineer With A Proven Track Record In Providing Quality Mechanical Component And System Support. Skilled At Formulating/implementing Designs, Testing & Producing Specifications, And Researching Product Applications. I Have Specialized In Electromechanical Systems’ Diagnostics. I Am Well-equipped To Provide Valuable Technical Expertise To Your Organization.